Loading...
9. Lighted Ball Field Improvements l � � �� SCANDIA LIGHTED BALL FIELD �I. PROPOSED IMPROVEMENTS SPRING/SUMMER 2010 � � � Recently, some of the local ball teams made requests of the Scandia Parks and � � Recreation Committee to assist with some upgrading/improvements to the lighted ball � ; field. This is a matter that we have discussed before, and would like to get some � improvements under way we propose potentially two (2) phases of work all to be completed by Taco Daze. We are proposing the following work to be completed in Phase 1 and prior to June 1 , 2010: i� 1. Removal of old appliances, non-working refrigerator and microwave ; that are currently in the concession stand to take place on May 1, 2010 (Scandia Heavy Metal day $25.00 disposal fee for each appliance); 2. Sheetrock, taping and finishing of inside of concession stand; 3. Painting the inside of concession stand and outside trim; and � 4. Miscellaneous outdoor bulbs for light fixture on concession stand and � bins for storage of lime (chalk) ball equipment. i � We have volunteers lined up for May 1 to remove the appliances (Park Board � members Matt R. and Sally S. We have a professional who is volunteering to sheetrock and tape the inside of the concession stand. Members of the men's fastpitch team will paint the inside and the outside trim. ! Phase 1 estimate of costs: „ II �' Task Cost 1. Appliance removal $40.00 (actuai cost) 2. Storage Bins for lime, etc. $50.00 3. Exterior Paint $100.00 � 4. Lighting for concession stand $ 10.00 i 5. Sheetrock and taping supplies $150.00 � Total Costs: $360.00 S t�� , � I � Phase 2 estimate of costs '�� �� ° ' Task Cost �� �����,�� 1. New Scoreboard $tbd 2. Painting of bleachers $100.00 �� � i''� [