Loading...
08.b2b TII GAVO SECOND ADDITION - CERT (6-13-2022)957.32 CB-FL 957.71 TC-SURM 957.11 CB-FL 957.37 TC-SURM 957.32 TC 957.42 TC 957.52 TC 957.69 TC 957.5 957.6 957.5 957.3 956.8 956.5956.1 955.7 955.2 955.2 955.8 956.2 956.3 956.3 956.4 957.1 957.8 959.9 959.82TC 959.61GL959.67 TC-EBIT 957.88 TC 957.62 TC 957.45 TC 954.7 957.9 TOP 957.8 955.1 955.7 957.2 956.9 956.4 956.1 955.5 956.9 957.7 959.6 956.52 FNDIP18775 955.27 MHSTM FLARED END = 950. (NGVD29) PER CITY BENCHMARK FLOW LINE = 957.11 FEET (NGVD29) PER CITY AS-BUILTS BENCHMARK 959.0 TOE 957.9 TOE 957.4 TOE 957.2 958.6 958.8 TOE-T 957.5 TOE 957.9 TOP 9 5 7 .4 957.5 957.4 965.9 TOP 965.8 TOP 961.9 TOE 961.3 TOE 957.66 FES 959.0958.7 957.8 957.7 960.99 FLCB 961.33 TC 957.1 957.33 VALVE957.33 VALVE 956.37 VALVE 956.5 VALVE-NOTOP 957.08 FLUSHPORT R I P R A P 6 0 12"RCP956.45 APRON 9 5 6.0 7 A P R O N 961.0 960.8 959.7 960.1 960.3 959.7 959.4 959.2 958.8 958.6 958.4 956.7 TOE 956.4 TOE 9 5 6.4 T O E 957.7 958.6958.1 TOP 956.0 TOE 958.7958.8958.6TOP 959.2959.2 958.8958.7957.50 959.11 TRAVIP 60 Δ=4°20'19" 24.9960 606060606 0 N 7 1 °2 5 '5 1 "E 6 0 .7 3 N3°47'16"E41.40N71°09'54"W 87.15S10°11'50"W107.44S22°55'09"E85.38N87°20'52"W 76.33 N37°55'02"W40.17N68°46'04"W82.08S45°18'45"W 70.02N 4 4 ° 4 1 ' 1 5 "W3 6 . 0 6 S39°48'27"W 66.3463.99S58°18'02"W 8.87 21.56 62.09Δ =12°16'0 0" 57.81 20.79 DRAINAGE EASEMENT DRAINAGE EASEMENTDRAINAGE EASEMENTDRAINAGEEASEMENT10101010(PLAT=21.59) N 5 1 ° 4 7'1 8 " W 4 0.0 0 S 7 0 °1 0 '3 3 "W89.6 4N34°21'31"W118.33188.68S74°43'31"W 33.43152.75963.9963.7 TOP 962.8 TOE 961.4 TOE 962.6 TOP 962.7 962.7 961.6 TOP 960.8 TOP 961.8 961.6 961.5 TOP 960.5 TOE 958.9 TOE 9 5 9 .9 1 F N D I P 1 8 5 7 7 9 5 6 .9 3 F N D IP 1 8 7 7 5 9 5 6 .2 0 A P R O N -R C P M 957.21 CB-FL 9 5 6.7 2 C B -FL 9 5 5.1 2 A P R O N 9 5 6.0 7 957.74 TRAVSPK 958.14 TC 9 5 8 .6 5 T C 958.38 GL 958.5 958.6 958.43 GL 958.43 TC 9 5 8 .6 958.7 958.6 TOP 955.1 957.4 958.2 959.4 TOP 959.6 959.5 958.7 TOP 954.8 950.92 FES 956.4 959.0 TOP 960.1 960.3 960.2 TOP 957.6 TOE 959.9 TOE 961.5 TOP 961.6 961.5 960.5 TOP 953.5 TOE 956.0 TOE 963.8 TOP 964.2 9 6 3 .9 963.7 TOP 961.8 TOE 964.5 TOE 966.5 TOP 966.7 966.8 966.3 TOP 963.5 964.5 966.6 TOP 967.6 967.7 967.4 TOP 966.8 TOE 967.0 TOE 967.9 TOP 967.8 967.5 967.1 TOP 963.9 964.7 965.9 TOP 966.4 966.6 966.4 TOP965.8 TOE 964.2 TOE 965.1 TOP 965.1 965.0 964.9 965.3 TOE 965.3 TOE 964.0 TOE 963.6 960.6 TOP 960.6 960.9 960.4 TOP 959.6 TOE 958.4 TOE959.3 TOP 959.8 959.7 959.3 TOP957.5 TOE 953.2953.4 953.8 953.6 953.4 953.3 953.5 953.7 953.4 953.6 953.7 953.4 952.4 9 5 8 . 2 3 F NDI P 1 8 7 7 5957.28FNDIP18775956.72FNDIP187759 5 6 .4 6 F N D I P 1 8 7 7 5 955.71 FNDIP18775 954.63 FNDIP18775 9 5 4 .4 5 F N D IP 1 8 7 7 5 -T E E P O S T 953.3 LATH 9 5 5.4 L A T H 956.51 FNDIP18775 955.23FNDIP18775962.15 FNDIP18775 965.7 LATH 965.43 FNDIP18775 968.8 LATH 965.40 FNDIP18775 967.67FNDIP18775964.45 FNDIP18775 965.0 LATH 960.94 FNDIP18775POOR 960.3 LATH 969.19 FND1/2IP 965.70 FND18775 964.64FND18775 956.30 FND18775 953.2 953.1 952.7 952.9 953.2 953.1 953.1 952.7 953.0 953.8 954.2 953.7 953.5 953.0 948.85 FND18775 951.62 FND18775 951.82 FND18775 952.78 FND18775 9 5 3 .4 1 F N D 1 8 7 7 5 952.46 FND18775 948.29FND18775 949.24FNDIP18775 9 5 5 .3 6 F N D 1 8 7 7 5 9 5 2 .4 9 L A T H 9 49 .7 0 F ND 1 8 77 5 949.72 FND18775 947.1 947.2 947.2 947.8 947.2 947.1 946.9 958.3 956.9 TOE 958.7 958.8 958.7 958.6 958.4 958.4 958.3 958.2 958.3 958.4 958.7 956.1 956.5 958.0 957.6 956.2 958.5 958.7 958.9 957.0 TOE 957.1 TOE 957.2 958.3 958.4 958.5 TOP 957.2 TOE 957.1 958.4 958.0 956.8 955.4 955.1 956.9 958.5 959.0958.7 TOP 957.3 TOE 957.7 959.2 959.0 TOP 957.6 TOE 958.9 TOP 959.3 958.8 958.3 955.8 956.3 958.1 959.0 959.4 958.8 958.9 957.1 957.6 TOE 959.0 TOP 959.1 958.9 957.2 956.4 9 5 7.7 9 5 8.5 958.7 958.3 957.1 TOE 956.4 956.3 957.0 TOE 958.0 TOP 958.1 957.8 9 5 7.4 956.6 955.9 956.3 957.3957.2 957.6 957.8 TOP 956.3 TOE 955.6 955.6 957.0 957.2 9 5 6.6 955.9 956.4 954.9 955.3 956.5 956.9 956.6 TOP 954.4 TOE 954.8 TOE 957.1 TOP 957.1 957.1 956.4 954.6 954.7 956.2 956.9 957.3 957.2 957.0 955.9 TOE955.9955.1 957.5 957.8 957.6 956.1 956.9 958.0 958.1 957.9 TOP 955.1 TOE 957.6 957.0 TOE 959.3 TOP 959.5 959.3 947.8 948.1 947.7 947.3 947.5 947.5 947.4947.5 947.6 947.8 945.0 944.9 945.1 945.3 945.5 947.4 945.8 945.4 944.9 945.1 946.3 945.2 945.6 945.7 946.5 946.8 946.6 945.4 945.5 945.5946.1 946.1945.0 945.2 945.1 946.0 945.3 945.6 945.4 945.4 943.4 10DRAINAGE EASEMENT N89°41'03"E 41.73 S34°31'06"E42.26S23°00'00"W62.82S 8 5 °1 1 '5 2 "W 4 0 .7 595.8310101010D R A I N A G E A N D U TILIT Y E A S E M E N T DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT MINNESOTA DNR PROTECTED WATERS 82-52P WETLAND AREA 82-70W DRAINAGE EASEMENTFEMA FLOOD ELEVATION 947.1 FEET (NAVD88) F E M A F L O O D Z O N E L IN E P E R F E M A F L O O D IN S U R A N C E R A T E M A P . S U B JE C T T O S C A L E U N C E R T A IN T Y ..92 FEET Y AS-BUILTS K D R A I N A G E E A S E M E N T 6 4 0 F T . T I E R L I N E 6 8 TOP .4 9 5 7 .5 958.2 TOE 957.4 957.4 957.8 TOE 958.4 TOE 958.1 TOE 958.0 TOE 959.1 TOE 959.9 TOE 969.6 TOP 967.9 TOP 966.8 TOP 964.7 TOP 963.3 958.1 964.4 TOP 965.7 TOP 965.8 TOP 966.4 TOP 9 5 7 .3 9 5 7 .4 957.4 957.1 957.4 957.8 958.1958.0 957.6 957.4 957.3 957.7 958.7 9 5 9 .0959 .09 5 8 .9 959.6 959.3 958.6 958.4 957.5 9 5 6.8 955.0 955.6 956.6 W A T E R RI PRAP954.6 956.0 957.7 952.7 952.9 957.2 960.22 TRAV 964.40 TRAV 961.2 957.6 958.8 961.0 961.1 964.9 967.0964.1 962.2 961.9961.9 961.7 959.0957.3 960.1 961.5 9 4 7 .1 C O N T O U R B A S E D O N L ID A R C O N T O U R S 142.11 157.81 68.08 130.74 113.1918"RCP12"RCPE. G. RUD & SONS, INC. Professional Land SurveyorsEST. 1977 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 Tel. (651) 361−8200 Fax (651) 361−8701 www.egrud.com ~for~ J. JOHNSON DEVELOPMENT ~of~ TII GAVO SECOND ADDITION NORTH DRAWN BY:JOB NO:DATE: CHECK BY: 1 2 3 NO.DATE DESCRIPTION BY S:\RUD\CAD\21PROJ\211310PP\211310PP.DWG JEN 211310PP 06/01/22 JER 211310PP CERTIFICATE OF SURVEY FIELD CREW: JH-CB 0 25 1005050 DENOTES EXISTING STORM SEWER LEGEND DENOTES IRON MONUMENT FOUND AS LABELED DENOTES CATCH BASIN DENOTES STORM SEWER MANHOLE DENOTES SIGN DENOTES EXISTING SPOT ELEVATION DENOTES STORM SEWER APRON DENOTES WET LAND DENOTES EXISTING CONTOURS X 952.36 DENOTES BITUMINOUS SURFACE Date: 06/13/2022 License No. 41578 JASON E. RUD I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Registered Land Surveyor under the laws of the State of Minnesota. - Field survey was completed by E.G. Rud and Sons, Inc. on 11/10/21. - Fee ownership is vested in BIG MARINE LAKE DEVLP. - Bearings shown are on Washington County Coordinate System. - Parcel ID Numbers: OUTLOT I = 28-032-20-42-0003 OUTLOT J = 28-032-20-34-0002 OUTLOT K = 28-032-20-42-0004 - Curb shots are taken at the top and back of curb. - Surveyed premises shown on this survey map is in Flood Zone X (Areas determined to be outside the 0.2% annual chance floodplain.), according to Flood Insurance Rate Map No. 27163C0151E Community No. 270582 Panel No. 151 Suffix E by the Federal Emergency Management Agency, effective date February 3, 2010 and Flood Insurance Rate Map No. 27163C0152E Community No. 270582 Panel No. 152 Suffix E by the Federal Emergency Management Agency, effective date February 3, 2010. - This survey was prepared without the benefit of title work. Additional easements, restrictions and/or encumbrances may exist other than those shown hereon. Survey subject to revision upon receipt of a current title commitment or an attorney's title opinion. - Wetland delineation performed by Earth Science Associates. NOTES Outlots I, J and K, TII GAVO, Washington County, Minnesota. PROPERTY DESCRIPTION ZONING EXISTING: GENERAL RURAL (GR) SHORELAND OVERLAY AREAS OUTLOT I = 4.48 ACRES OUTLOT J = 3.52 ACRES OUTLOT K = 2.92 ACRES TOTAL = 10.92 ACRES VICINITY MAP SITE SITE SITEJEN6/13/22 Per City Comments