Loading...
2)d. PW Vehicle CIP 2022-2032Prepared Aug-22 Charles Fischer Project#Cycle Priority Vehicle Description Current Replacement Cost 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033-2038 PR-020 10 3 1980 Zamboni $50,000.00 $65,000.00 PW-016 20 1 301-98 John Deere Grader (1998)$400,000.00 $480,000.00 PW-012 15 3 312-08 Hot Box Patch Trailer (2008)$35,000.00 $39,000.00 PW-065 12 3 Utility Trailer 3,500 lbs (1998)$7,000.00 $8,000.00 $10,000.00 PW-022 10 2 104-13 Ford F550 w/ sander, plow mount, compressor (2013)$70,000.00 $75,000.00 $100,000.00 PW-017 12 1 203-11 Mack Tandem Axle w/ Falls Plow Equipment $300,000.00 $325,000.00 $400,000.00 PW-005 7 3 303-17 Kubota Mower w/ cab, broom, and blower (2017)$60,000.00 $65,000.00 $75,000.00 $85,000.00 PW-015 12 3 308-12 New Holland Skid Steer (2012)$60,000.00 $65,000.00 $90,000.00 PW-063 12 2 201-14 Mack Single Axle w Falls Plow Equipment (2014)$275,000.00 $320,000.00 $400,000.00 PW-066 12 3 PJ Skid Trailer 14,000 lbs (2012)$15,000.00 $17,000.00 $20,000.00 PW-019 10 3 101-18 Chevrolet 1/2ton pickup (2018)$35,000.00 $44,000.00 $55,000.00 PW-064 10 3 304-21 Kubota UTV (2021)$12,000.00 $16,000.00 $20,000.00 PW-004 10 1 102-19 Dodge 3500 SRW w/plow (2019)$45,000.00 $52,000.00 PW-006 12 2 202-17 Western Star Single Axle w/ Jcraft Plow Equip (2017)$275,000.00 $350,000.00 PW-014 10 2 103-21 Dodge 2500 w/ plow (2021)$45,000.00 $62,000.00 PW-009 15 1 302-22 John Deere 6130M tractor w/flail attachments (2022)$240,000.00 $300,000.00 PW-040 12 1 318-20 John Deere 324L Loader (2020)$120,000.00 $150,000.00 PW-067 na 4 Equipment Attachments (fit skid, loader or tractor)$10,000.00 $11,000.00 $13,000.00 $15,000.00 PW-068 na 4 Addition Vehicle (truck for additional FT or PT staff)$45,000.00 $50,500.00 $2,099,000.00 $400,000.00 $141,000.00 $114,500.00 $320,000.00 $480,000.00 $44,000.00 $415,000.00 $156,000.00 $62,000.00 $150,000.00 $1,495,000.00 (NA) Used for replacements of existing equipment. Scandia Public Works Vehicle/Equipment CIP The following priority rating system was identified in 2008 and have been used in subsequent updates. (1) Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. (2) Very important, high-priority projects that should be done as funding becomes available. (3) Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. (4) Less important, low-priority projects; desirable but not essential.