8.d) City Engineer Update 3 �,
�. �)
. . ;��� ��:
C�ty of Scand�a S��vn�.
ENG/NEER/NG UPDA TE
January 15, 2013
The purpose of this update is to provide information on current projects and engineering in Scandia.
Updated information is shown in ifalics.
Pavement Manaqement
• We have been working with Tim Kieffer on priority modifications to the Pavement
Management Plan, a draft 2013 seal coaUpatching list, and a six-year master seal coat plan.
Anderson/Erickson Sewaqe Treatment Svstem
• Recommended Ordinance changes to address future connections have been prepared. The
information was presented at the 1/10/13 Wastewater Advisory Committee meeting.
• Working with Tim and EcoCheck on repairs that need to be completed in the near future.
• The fall 2012 testing indicated elevated levels of ammonia. We will need to continue
sampling the monitoring wells. Next testing will occur in late March 2013.
Tii Gavo
. The Conservation District has issued a certificate of compliance. The developer submitted additional
information to the CMSCWD regarding the drainage features on 1/7/13.
• City staff reviewed the site in October 2012. Most of the items on the Final Inspection Notice have
been addressed by the Developer. The remaining items can be completed in the spring of 2013. At
that time, the City can complete a comprehensive review of the project (including landscaping) and
consider a reduction in the project sureties.
Bone Lake Fish Barrier (CLFLWD Proiect)
• Tim will work with the watershed on a patch and seeding inspection in the spring.
Goose Lake Ravine Stabilization Proiect (CMSCWD Proiect)
• Tim will work with the watershed on a seeding inspection in the spring.
GIS and Mappinq
• We are working with Tim on a GIS infrastructure inventory and mapping issues. We have
loaned Tim a GPS unit(no charge) for completing a sign and inventory. This device could
also be used to supplement the culvert inventory being completed by the watershed district.
• We worked with Tim to prepare snow plowing route maps for use by the plow drivers.
Other
• Have been in contact with a resident on 196th St. regarding a drainage issue.
• Worked with staff on issues concerning a new sewer connection in Bliss area.
City of Scandia—Engineering Update