Memorandum
To: Scandia City Council Reference: Tii Gavo 2nd Addition
Copies To: Brenda Eklund, Clerk
Ken Cammilleri, City
Administrator
Jaren Johnson, Applicant Project No.: 18407.000
From: Evan Monson, Planner Routing:
Date: October 13, 2022
SUBJECT: Final Plat for a Major Subdivision for Tii Gavo 2nd Addition
MEETING DATE: October 18, 2022
LOCATION: Outlots I, J, and K of the Tii Gavo subdivision - PIDs 28.032.20.42.0003,
28.032.20.34.0002, 28.032.20.42.0004
APPLICANT: Jaren Johnson - J. Johnson Development
OWNER: Big Marine Lake Development, LLC
ZONING: General Rural (GR), Shoreland Management Overlay
REVIEW PERIOD: 60 day period ends November 20, 2022
ITEMS REVIEWED: Application and plans received September 21, 2022
DESCRIPTION OF THE REQUESTS
The applicant is looking to subdivided three outlots in the Tii Gavo subdivision - outlots I, J, and K. The
proposed subdivision would create eight buildable lots that would be available for single family
development. The lots would all have access onto Meadowridge Trail North, which would be completed
as part of this proposed development.
The three outlots and the unconstructed portion of Meadowridge Trail North were platted out as part of
the initial approval for the Tii Gavo subdivision back in 2007. The development was approved as an
‘Open Space Design’ subdivision and a Planned Unit Development, which under the ordinances in effect
at that time required a Conditional Use Permit (CUP) to be approved with the subdivision’s Final Plat . As
part of the review and approval of the proposed plat for the 2nd Addition, the 2007 CUP will be amended
as well. The preliminary plat for this subdivision was reviewed earlier this year by the Planning
Commission and approved by the City Council
Tii Gavo 2nd Addition Staff Report October 18, 2022
Scandia City Council Page 2
PROPERTY INFORMATION
Parcel description: The three outlots all are located along an unconstructed portion of Meadowridge
Trail North in the Tii Gavo subdivision. Newgate Avenue is located east of the subdivision, while
Lakamaga Trail is to the north. Outlot I is located between Rasmussen Pond and Meadowridge Trail, and
totals approximately 4.5 acres. A small wetland is located on its southeast corner. Outlot J is located
south of Outlot I, and totals approximately 3.5 acres. Outlot K is a long, narrow lot that is just under 3
acres in size; a wetland and drainage easements occupy portions of Outlot K.
Land use: None/vacant
Figure 1: Outlots I, J, & K shown in red, per City GIS
EVALUATION OF REQUEST
Comments on the Request
The submittal was forwarded onto city staff and other agencies for review and comment (engineering,
watershed, DNR). Comments received at the time of writing this staff report are included b elow:
Tii Gavo 2nd Addition Staff Report October 18, 2022
Scandia City Council Page 3
Engineer
The comments from the City Engineer are included in the meeting materials in a letter dated October 3,
2022.
Development Code Requirements
Overview & Previous Approvals
The Tii Gavo subdivision was approved in 2007. Under the zoning ordinance at the time of the initial
approval for the Tii Gavo subdivision, the site was zoned ‘Agricultural’ (AG). The site at that time was also
within the Shoreland Overlay zone; the city at that time used the county’s shoreland ordinance. The
approval of the Tii Gavo subdivision was done as an ‘Open Space Design’ (OSD) subdivision, which was
a special kind of subdivision under the previous ordinance that allowed the site to have differing lot design
standards and increased density in exchange for preserving a certain percentage of the site as
undeveloped open space. The 2007 ordinance required at least half of the site to be preserved as open
space. These areas are located throughout the subdivision today, and preserve wetlands, vegetation, and
other features from being developed. OSDs under the previous ordinances required both a CUP and a
preliminary and final plat to be approved; standard or conventional subdivisions followed just the
preliminary and final plat process. To build this next addition in the subdivision, the existing CUP for Tii
Gavo will be amended.
The approval of the subdivision in 2007 planned for 37 total lots to be developed in the subdivision, with
29 in the initial first phase. This was identified in the Development Agreement as well as the Conditional
Use Permit (CUP) approved as part of the project. The future eight lots that would bring the subdivision to
a built-out total of 37 lots would occupy the areas that are currently platted as outlots I, J, and K. The
applicant’s proposed preliminary plat creates eight buildable lots, keeping in line with the original approval
and plans for the Tii Gavo subdivision.
The applicant submitted the preliminary plat for review and approval to the city earlier this summer. The
plat was approved at the August 16th Council meeting, along with a variance to the building setback from
Rasmussen Pond. The variance was to allow for a 100 foot setback consistent with the first phase of Tii
Gavo, instead of the 200 foot setback required under today’s ordinance. The proposed final plat is
consistent with the design of the preliminary plat, with eight lots in total. Five of the lots will be north of
Meadowbridge Trail, while three will be south of the street.
Table 1: Proposed Lots
Lot Size (acres) Buildable Area (acres)
Lot 1, Block 1 1.04 0.20
Lot 2, Block 1 1.04 0.37
Lot 3, Block 1 1.00 0.34
Lot 4, Block 1 1.40 0.50
Lot 1, Block 2 2.92 0.42
Lot 1, Block 3 1.00 0.65
Lot 2, Block 3 1.14 0.74
Lot 3, Block 3 1.38 0.86
Tii Gavo 2nd Addition Staff Report October 18, 2022
Scandia City Council Page 4
Infrastructure
The existing subdivision is already served by a community septic system, which the new eight lots would
also be served by. Each lot would utilize wells for drinking water . The proposed new lots will all front
Meadowridge Trail North; the unfinished portions of the road would be completed as part of the project.
Lot 1, Block 2, and Lot 4, Block 1 are proposed to utilize a shared driveway, as shown by the access
easement that runs north between the two lots. Wetlands and easements prevent individual driveways
from adequately serving those two lots. Lot 4, Block 1 has a Manage 3 wetland on it, while Lot 1, Block 2
has a Manage 1 wetland on it. Drainage easements also cover portions of each lot. A Development
Agreement between the applicant and the city will be required to ensure proper installation and
construction of the subdivision.
Parkland Dedication
Creation of new lots through the subdivision process triggers the park dedication requirements of the
city’s subdivision ordinance. This requirement calls for either land in the subdivision be dedicated to the
city for parks, or a cash payment in lieu of land be paid to the city. The Development Agreement from
2007 for the Tii Gavo subdivision noted a $1,500 parkland dedication fee is to be paid for each created
lot; for this second phase the cash in lieu fee required would total $12,000.
ACTION REQUESTED
The City Council can do one of the following:
1. Approve, with or without conditions
2. Deny, with findings for denial
3. Table the request for further review/study
The Council may require such revisions in the final plat as it deems necessary for the health, safety,
general welfare and convenience of the city. Approval will require a majority vote of the entire Council.
RECOMMENDATION
Staff recommend approval of the Final Plat for the Tii Gavo 2nd Addition. The following conditions of
approval were recommended:
1. The applicant is permitted to create eight lots, as shown on the plans submitted to the city and
reviewed with this request.
2. The proposed eight lots shall adhere to the setback requirements as approved with the
Preliminary Plat.
3. The applicant shall acquire any required permits from the watershed district, and comply with
their requirements.
4. The applicant shall address the comments from the City Engineer in the letter dated October 3,
2022.
5. The applicant shall update the current Development Agreement and Conservation Easement to
include the proposed improvements for Tii Gavo 2nd Addition, which shall be approved by the City
Council.
6. All other requirements of the existing Conditional Use Permit shall remain in full force and effect.
7. The applicant shall secure any other applicable Federal, State, County, and local permits required
for the project.
Tii Gavo 2nd Addition Staff Report October 18, 2022
Scandia City Council Page 5
8. The applicant shall pay all fees and escrows associated with this application.