8.d) Engineer's Activity Report 5 � �5 � 4� Cit of Scandia �� �� Y Engineer's Activity Report SCANDIA February 15, 2013 Phii Gravel, City Engineer (651) 604-4885 phil.gravel@stanfec.com The purpose of this report is to provide information on recent engineering activity in Scandia. Streets • Completed plans and specifications for 2013 Seal Coat project (refer to separate fetter). • Worked with Tim Kieffer to finalize maps for 6-year master seal coat plan. • Prepared condition report and cost estimates for Quinnell Avenue bituminous overlay. Sewer • Working with Clint Jordahl and Andy Riemer to arrange for spring well sampling on the Anderson-Erickson system. • Discussed Bliss system pump information with Tim Kieffer. • Gathering information on experimental on-site sewage treatment systems. • Reviewing flow information for possible sewer ordinance revisions. Will provide recommendations to Kristina and Tim in March. Miscellaneous • Discussed status of GIS infrastructure inventory and mapping with Tim Kieffer. • Discussed Bliss area sewer connection issues with Tim Kieffer. • Attended City Engineer's Association of Minnesota Conference Jan. 30th and 31 St. City of Scandia—Engineering Activity Report