8.f) Public Works Activity Report (January 2013) g.-��
Public Works Activity Report � �
oi 3 � ,� ���-���
January 1 through January 31,�
Tim Kieffer, Maintenance Superintendent �.7�1�N��
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Performed snow and ice control operations
• Performed tree trimming operations
• Removed wreaths from the Uptown street light poles
• Removed fallen tree from the roadside
Park&Recreation:
• Installed bike route signs
• Cleared snow off the hockey and pleasure rinks
• Fixed hockey rink fence
• Put up Vinterfest sign
Sewer:
• Read pump run times at all of the lift stations
Water:
• Read water meters for Uptown system
Equipment and Building:
• Performed monthly OSHA inspections
• Replaced mirror in the Annex bathroom
• Rearranged several rooms at the Community Center
• Prepared Community Center floor for waxing
• Removed holiday decorations from the Community Center
• Remove snow and ice from the Community Center roof
• Prepared walls to be painted at the Community Center
• Replaced bafl valve on the emergency wash down system at the Fire Hall
• Built rack for cutting edges
• Installed first aid kits in the City's vehicles
• Replaced four light bulbs at the Community Center
• Installed two kick plates at the Community Center
• Filled water softeners with salt at Public Works and Community Center
Management tasks
Street:
• Met with engineer to go over 2013 road projects
• Met with resident about tree trimming
• Met with tree trimming contractors
• Ordered salt
� • Worked with Washington County to switch the wreaths to LED bulbs
Park and Recreation:
• Corresponded with DNR about the Goose Lake aerator
Sewer:
• Corresponded with EcoCheck about the backflow valve on the Anderson/Erickson system
• Updated the City's Gopher State One polygon to include the Bliss and Anderson/Erickson
systems
• Obtained quotes for a new and rebuilt pump
• Corresponded with Gammelgarden about their sewer flows
• Signed staff up for on-site sewer schools
• Worked on 201 connection ordinance
• Corresponded with the County and Stantec about a new connection on the Bliss system
• Worked with EcoCheck on Bliss lift station 4
Equipment and Building:
• Met with Cintas to supply paper products and mats
• Worked with contractor to unplug the holding tank at the Warming House
• Ordered garage door openers for the Public Works shop
• Scheduled a meeting between Force America and staff
• Worked with Washington County on painting the Community Center
• Scheduled contractor to haul away used oil
• Obtained quotes for pest control
• Met with electrical contractor to install outlets in the council chambers
• Worked with contractor on the installation of the power washer
• Had the oil changed and tires rotated on the Ford F-250(103-11)
Miscellaneous:
• Attended storm water seminar
2