11-22-2022_Draft_Proposed_2023_Scandia_Budget_Packet_Smaller
Presented Tuesday, November 22, 2022
Brief Summary on Levy and Projected Tax Rate Changes
2022 Assessment Year and Changes in Net Tax Capacity
Proposed 2023 General Fund Budget
Discussion of financing and budgeting practices
Discussion of capital budget.
Comparison of tax rates and distribution between taxing jurisdictions.
Questions, comments, direction are welcomed through this discussion.
Consider funding for 2023 administration transition.
Re-evaluation of capital budgeting priorities to better fit long-term financial limitations. Particularly the spending down of cash balances of capital funds.
The City as one of the largest yearly increase in values. There was a 27% increase in median home values comparing the 2022 assessment year and that of 2021.
nd
The City was the 2 highest City in the county for increased
median taxable market value.
There were 20 new construction starts during the 2022 assessment year. This is consistent with new start trends pre- 2018 suggesting a return to normal construction activity as of Covid-19
restrictions.
A combination of $9,198,600 in total value new construction assessed value during the 2022 assessment year and a surge in existing home sale prices and its effect on general property
assessments accounts for 24.9% of growth in total value.
* Net Tax Capacity is the total amount of property value in the City that is taxable. This total excludes value based on tax classifications set by the State. 2024 is a estimate that
there will only be moderate change in value for 2024 but there is no certainty on this.
Although the 2022 assessment year has resulted in a significant increase in assessed value, 25.1% for a difference of $2,224,467.
This additional value, at first glance would imply considerable additional capacity, but the County applied a 25% equalization to the City as a whole, largely due to higher than assessed
property sales in the 2022 assessment year.
Although there is additional capacity created by this adjustment, it is important to consider a levy that takes into account higher valuation. Therefore, this budget proposal includes
a estimated -15.35% drop in tax rate with a 8.54% in total city levy increase.
Proposed 8.7% Overall Property Tax Levy Increase or $ 312,141 for a net total levy on taxable property of $2,680,259 after a $123,297 fiscal disparity deduction.
As part if that proposed overall increase,
The proposed General Fund levy increased by 10.6% for a total difference of $167,418 to $1,750,418.
The debt service levy dropped 8.86% for a difference of -$35,519. The proposed 2023 debt service levy is $406,536.
The proposed 2023 Capital Improvement Levy is $641,302. That includes a increase of $99,306 over PY or 18.32%
The proposed 2023 EDA levy is proposed to $5,300 for a reduction of $2,700.
Total proposed 2023 property levy of $2,803,556 w/o Fiscal Disparities Program Deduction (was $2,579,051in 2022)
Proposed City Tax Rate Reduction of -4.7% to 26.276% (was 30.945% in 2022)
DRAFT 2023 Budget
2023 Estimated City Tax Rate Impacts
1.00%
1.25%
0.50%
0.65%
1.50%
2.00%
1.00%
1.25%
0.50%
0.65%
1.50%
2.00%
(Assumes no changes in property value)
These are estimated costs based on Washington County Estimated net tax capacity for 2023 and are strictly a reflection of the predicted change in only the City's property tax. The following
is a breakdown of tax bill impacts:
Property Tax Classification
Cost per
$1,000 in value
Difference over PY
Cost per
$100,000 in value
Difference over PY
Cost per
$250,000 in value
Difference over PY
Per Median Difference Value of over PY
$597,000
Class 1a Homestead Under $500k
$2.63
-$0.66
$263.25
-$66.00
$658.13
-$164.99
Class 1a Homestead Over $500k
$3.29
-$0.82
$329.07
$329.07
$822.67
$822.67
See table below
Class 2a Agricutural Land first $1.5Mil
$1.32
-$0.33
$131.63
-$33.00
$329.07
-$82.50
$785.81
-$19.37
Class 2c Managed Forest Land
$1.71
-$0.43
$171.11
-$42.90
$427.79
-$107.25
$1,021.55
-$25.18
Class 3a Commercial-Industrial, Utility first $150k
$3.95
-$0.99
$394.88
-$99.00
Class 3a Commercial-Industrial, Utility over $150k
$5.27
-$1.32
$1,316.27
-$83.05
$2,945.80
-$27.98
Property Tax Classification
Cost per
$600,000 in value
Difference over PY
Cost per
$800,000 in value
Difference over PY
Cost per
$1,000,000 in
value
Difference over PY
Class 1a Homestead Under $500k
Class 1a Homestead Over $500k
$1,974.40
-$494.98
$2,632.53
$0.00
$3,290.66
-$824.96
Class 2a Agricutural Land first $1.5Mil
$789.76
-$197.99
$1,053.01
-$263.99
$1,316.27
-$329.99
Class 2c Managed Forest Land
$1,026.69
-$257.39
$1,368.92
-$343.18
$1,711.14
-$428.98
Class 3a Commercial-Industrial, Utility first $150k
Class 3a Commercial-Industrial, Utility over $150k
$2,961.60
-$742.47
$4,014.61
-$1,006.45
$5,067.62
-$1,270.44
* The Assessor's estimated median home value for 2022. Estimates for 2023 will be available next year. 2023 Proposed Est City Tax Rate 26.3253% Estimated 25.1% Change in Market Value
Between 2022 to 2023, which is the city median change in market value. 2022 City Tax Rate 30.9455% 2022 Median Value applicable to 2023 tax year.
(Assumes change from 2022 Median Home Value to 2023 Median Home Value)
The following is an estimated cost change if a home value went from median home value to new median home value: 2023 Median Home Value $597,000
40.000000%
35.000000%
30.000000%
25.000000%
20.000000%
15.000000%
10.000000%
5.000000%
0.000000%
`
Tax Rate Comparisons
Pay 2022 Tax Pay Rate 2023
Taxing Authority
Rate
Tax Rate Est
1 Scandia
30.945%
26.235%
2 Afton
32.007%
27.044%
3 Bayport
33.463%
28.945%
4 Marine on St Croix
59.002%
44.639%
Draft Proposed Preliminary 2023 Budget (No Tax Rate Change) Current, Proposed Preliminary and Projected Property Tax Levies
2021
2022
2023
2024
2025
2026
2027
Levy
Levy
Prop. Prelim
Projected
Projected
Projected
Projected
General Fund
$ 1,394,586
$ 1,583,000
$ 1,755,418
$ 1,784,189
$ 1,841,089
$ 1,899,763
$ 1,960,265
EDA
5,000
8,000
5,300
8,000
8,000
8,000
8,000
Debt Service
1,131,322
996,051
1,053,139
1,511,109
1,421,001
1,425,190
1,489,533
General Capital Improvement
100,000
217,336
409,291
373,375
404,829
426,397
62,346
Park Improvement
10,000
20,000
20,000
30,000
30,000
40,000
30,588
Equipment Replacement
130,000
87,800
-
64,000
145,000
100,000
22,153
Local Road Improvement
438,539
216,860
212,012
396,785
196,691
100,000
90,000
3,209,447
3,129,047
3,455,159
4,167,458
4,046,611
3,999,350
3,662,885
Draft Proposed Preliminary 2023 Budget (No Tax Rate Change)
Comparison between 2023 Proposed and 2022 Levies
2022 $ change 2023 % Change
Tax Capacity Based Levy Final Levy 2022 to 2023 Proposed 2022 to 2023
General Fund $ 1,583,000 $ 172,418 $ 1,755,418 10.89%
EDA 8,000 $ (2,700) 5,300 -33.75%
Debt Service 446,055 $ (39,519) 406,536 -8.86%
General Capital Improveme 217,336 $ 191,955 409,291 88.32%
Park Improvement 20,000 $ - 20,000 0.00%
Equipment Replacement 87,800 $ (87,800) - -100.00%
Local Road Improvement 216,860 $ 192,431 409,291 88.73%
$ 2,579,051 $ 426,784 $ 3,005,835 16.55%
Park Improve Equipment 1% Replacement
0%
Local Road General Capital Improvement Improvement 14%
14%
General Fund 58%
Debt Service 13%
EDA 0%
2023 Proposed Property Tax Levy
CITY OF SCANDIA
Financial Management Plan
Draft Proposed 2023 Levies, Tax Rates and Projections
Inflation Assumptions
1 Revenue (Non-property tax)
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2 Interest Earnings
1.50%
1.50%
1.50%
1.50%
1.50%
1.50%
3 Expenses
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
Budget
Proposed
Projected
Levy by Type
2022
2023
2024
2025
2026
2027
34
General Fund (Certified) Operating Tax Levy
1,583,000
1,755,418
1,784,189
1,841,089
1,899,763
1,960,265
35
Annual Increase
13.5%
10.9%
1.6%
3.2%
3.2%
3.2%
36
OTHER SPECIAL TAX LEVIES
Debt service
2013 Certificates
37
67,000
64,000
-
-
-
-
39
2017 Certificates
34,524
-
-
-
-
-
40
2018 GO Bonds
344,531
342,536
345,634
343,166
340,541
343,009
41
Local road improvement debt levy
-
-
192,810
192,810
192,810
658,143
42
Capital improvement debt levy
-
-
-
-
-
-
43
Equipment replacement debt levy
-
-
100,505
100,505
217,442
275,295
44
Park Improvement
20,000
20,000
30,000
30,000
40,000
30,588
45
Equipment Replacement
87,800
-
64,000
145,000
100,000
22,153
46
Local Road Improvement
216,860
212,012
396,785
196,691
100,000
90,000
47
General Capital Improvement
217,336
409,291
373,375
404,829
426,397
62,346
48
EDA
Total Other Special Levies Total Tax Levy
8,000
5,300
8,000
8,000
8,000
8,000
49
996,051
1,053,139
1,511,109
1,421,001
1,425,190
1,489,533
50
2,579,051
2,808,556
3,295,297
3,262,090
3,324,953
3,449,799
51
Increase/(Decrease) in Total Tax Levy
2.10%
8.90%
17.33%
-1.01%
1.93%
3.75%
52
Less: Fiscal Disparities
(210,933)
(123,297)
(103,651)
(119,958)
(119,864)
(118,109)
53
Net Levy to Taxpayers
2,368,118
2,685,259
3,191,647
3,142,132
3,205,090
3,331,690
54
Existing Tax Base
8,140,985
10,365,452
10,420,589
10,370,969
10,527,776
10,898,275
55
New Net Tax Capacity
229,974
2,224,467
55,137
(49,620)
156,807
370,499
56
Total Net Tax Capacity
7,903,617
10,216,264
10,475,726
10,321,349
10,684,583
11,268,774
57 Tax Rate on Tax Capacity
30.945%
26.325%
30.467%
30.443%
29.997%
29.566%
58 Tax Rate % Change
0.13%
-4.62%
4.14%
-0.02%
-0.45%
-0.43%
59 Total Tax Base Increase
2%
29%
3%
-1%
4%
5%
CITY OF SCANDIA
Financial Management Plan
Draft Proposed Estimated 2023-2032 Projections
Inflation Assumptions
1 Revenue (Non-property tax)
2.00%
2.00%
2.00%
2.00%
2.00%
2 Interest Earnings
1.50%
1.50%
1.50%
1.50%
1.50%
3 Expenses
3.00%
3.00%
3.00%
3.00%
3.00%
Levy by Type
2028
2029
2030
2031
2032
34
General Fund (Certified) Operating Tax Levy
2,067,652
2,131,981
2,198,311
2,221,705
2,292,225
35
Annual Increase
5.5%
3.1%
3.1%
1.1%
3.2%
OTHER SPECIAL TAX LEVIES
36
Debt service
37
2013 Certificates
39
2017 Certificates
40
2018 GO Bonds
345,161
341,749
343,429
344,794
340,594
41
Local road improvement debt levy
658,143
658,143
658,143
1,113,360
1,113,360
42
Capital improvement debt levy
-
-
-
-
-
43
Equipment replacement debt levy
349,151
349,151
398,387
471,012
1,126
44
Park Improvement
20,000
23,526
20,867
-
20,000
45
Equipment Replacement
47,048
30,817
-
-
75,001
46
Local Road Improvement
141,811
100,011
96,497
74,256
300,000
47
General Capital Improvement
30,000
67,811
84,678
84,678
84,678
48
EDA
12,000
12,000
12,000
12,000
5,000
49
Total Other Special Levies
1,603,314
1,583,208
1,614,001
2,100,099
1,939,759
50
Total Tax Levy
3,670,965
3,715,189
3,812,312
4,321,804
4,231,985
51
Increase/(Decrease) in Total Tax Levy
6.41%
1.20%
2.61%
13.36%
-2.08%
52
Less: Fiscal Disparities
(116,409)
(121,761)
(120,679)
(121,546)
(135,581)
53
Net Levy to Taxpayers
3,554,556
3,593,428
3,691,633
4,200,259
4,096,404
54
Existing Tax Base
11,494,149
11,724,032
11,958,513
12,197,683
12,441,637
55
New Net Tax Capacity
0
0
0
0
0
56
Total Net Tax Capacity
11,494,149
11,724,032
11,958,513
12,197,683
12,441,637
57 Tax Rate on Tax Capacity
30.925%
30.650%
30.870%
34.435%
32.925%
58 Tax Rate % Change
4.60%
-0.89%
0.72%
11.55%
-4.38%
59 Total Tax Base Increase
2%
2%
2%
2%
2%
Given the City’s ambitious Capital Improvement Plan, it is likely that the City will need to reassess it capital priorities to fit within tax limitations.
The City needs to adopt a balanced pay-as-you-go and borrowing plan that is flexible to changing economic conditions.
Pay-as-go means to save funds to purchase or finance capital. This practice is especially suited for certain capital that is not eligible for access to lending and must be saved for.
It can also present savings opportunities by avoiding lending costs.
Borrowing implies utilizing bank certificates, bonding, or state infrastructure PFA financing.
Currently, a balanced budget can be achieved with this proposal for the General Fund,
but to carryout planned 2023 expenditures with a draw down approx.
$1,000,000 of fund balance.
Additional planning is needed to consider 2024 and beyond, which will be part of future capital investment meetings with the City Council.
Current Draft Budget Proposes the following:
An increase of the General Fund Tax Levy from $1,583,000 to $1,784,14; a12.7% or $201,141 increase.
Proposal would increase the General Fund’s fund balance by $32,900 for a Fund Balance
which is estimated to be 65.8% of the 2024 Fiscal Year's Expenditures, policy is to have 50% to 60% general fund balance.
A 7.4% increase in building permit revenue for an estimated $10k increase.
Overall General Fund Revenue increase of 9.8% for a difference of
$187,625.
Summary Proposed Preliminary 2023 Budget General Fund 101
Revenues
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
General Property Tax-Current
$1,266,589
$1,583,000
$0
$1,755,418
10.9%
Other taxes
$161,304
$25,400
$0
$26,400
20.0%
Licenses and permits
$218,279
$149,500
$76,101
$161,100
25.1%
Intergovernmental revenue
$62,881
$64,200
$0
$61,000
50.2%
Grants
$13,786
$10,000
$13,188
$11,700
36.7%
Charges for services
$85,435
$48,293
$46,255
$56,900
-19.4%
Fines & Forfeitures
$6,899
$7,000
$3,295
$7,400
5.7%
Interest earnings
$3,133
$15,900
$3,925
$12,100
-23.9%
Donations
$8,936
$1,500
$2,841
$2,000
33.3%
Miscellaneous revenue
$7,281
$2,000
$0
$4,100
105.0%
Refunds and reimbursements
$2,769
$2,500
$150
$3,800
52.0%
Transfers from Other funds
$0
$0
$0
$0
0.0%
TOTAL
$1,837,292 #
$1,909,293 #
$145,755
$2,101,918
0.100888015
Summary Proposed Preliminary 2023 Budget General Fund 101
Department Expenses
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
41000 Finance & Administration
$396,590
$374,300
$181,370
$406,100
-106.9%
41110 Legislative, Mayor, and Council
$19,195
$23,000
$5,142
$20,900
-130.0%
41410 Elections
$1,470
$7,600
$1,515
$1,050
-423.3%
41910 Planning and Building
$155,112
$171,320
$72,461
$192,450
3109.9%
41960 Asessor
$22,077
$21,600
$10,878
$21,600
0.0%
42100 Police Services
$144,647
$150,900
$309
$168,999
12.0%
42200 Fire & EMS
$309,597
$280,190
$116,650
$330,000
44.8%
42700 Animal Control
$4,395
$4,000
$1,700
$5,000
25.0%
43000 Public Works
$557,563
$681,490
$278,396
$732,750
223.7%
45000 Parks & Recreation
$77,948
$94,950
$42,399
$111,670
682.4%
45180 Community Center
$41,884
$73,950
$43,925
$79,390
152.8%
49000 Interfund Transfers Out
$282,690
$0
$0
$0
0.0%
TOTAL
$2,013,167 #
$1,883,300 #
$754,746
$2,069,909
9.9%
CITY OF SCANDIA
Financial Management Plan
Draft Proposed 2023 Levies, Tax Rates and Projections
Inflation Assumptions
1 Revenue (Non-property tax)
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2 Interest Earnings
1.50%
1.50%
1.50%
1.50%
1.50%
1.50%
3 Expenses
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
Budget
Proposed
Projected
GENERAL FUND
2022
2023
2024
2025
2026
2027
REVENUE
4
General Property Tax-Current
1,583,000
1,755,418
1,784,189
1,841,089
1,899,763
1,960,265
5
Other taxes
25,400
26,400
26,928
27,467
28,016
28,576
6
Intergovernmental
64,200
61,000
62,220
63,464
64,734
66,028
7
Federal grant
10,000
11,700
-
-
-
-
8
Franchise fees
-
-
-
-
-
-
9
Licenses and Permits
149,500
161,100
164,322
167,608
170,961
174,380
10
Charges for Services
48,293
56,900
58,038
59,199
60,383
61,590
11
Fines & Forfeits
7,000
7,400
7,548
7,699
7,853
8,010
12
Interest Earnings
15,900
12,100
12,282
12,466
12,653
12,842
13
Miscellaneous Revenues
6,000
9,900
-
-
-
-
14 Total Revenue
1,909,293
2,101,918
2,115,526
2,178,992
2,244,362
2,311,693
EXPENSES
16
General Government
617,820
642,100
661,363
681,204
701,640
722,689
17
Public Safety
435,090
503,999
519,119
534,693
550,733
567,255
18
Public Works
683,490
732,750
754,733
777,374
800,696
824,717
19
Park and Recreation
152,900
175,060
180,312
185,721
191,293
197,032
Capital Outlay
Total Expenses
Revenues Over / (Under) Expenses OTHER FINANCING SOURCES / (USES)
Transfers In
16,000
16,000
-
-
-
-
1,905,300
2,069,909
2,115,526
2,178,992
2,244,362
2,311,693
3,993
32,009
-
-
-
-
-
-
-
-
-
-
25
Sale of Fixed Assets
-
-
-
-
-
-
26
Bond Proceeds
-
-
-
-
-
-
27
Transfer in
-
-
-
-
-
-
Transfers Out
Total Other Sources / (Uses)
Prior Period Adjustments
-
-
-
-
-
-
-
-
-
-
-
-
31 Ending General Fund Balance (FB)
Unassigned
Fund Balance as a % of Next Year's Expenditures (net of contingency)
1,357,204
1,357,204
65.6%
1,389,213 1,389,213
1,389,213 1,389,213
65.7% 63.8%
1,389,213
1,389,213
61.9%
1,389,213
1,389,213
60.1%
1,389,213
1,389,213
58.3%
CITY OF SCANDIA
Financial Management Plan
Draft Proposed 2023 Levies, Tax Rates and Projections
Inflation Assumptions
1 Revenue (Non-property tax)
2.00%
2.00%
2.00%
2.00%
2.00%
2 Interest Earnings
1.50%
1.50%
1.50%
1.50%
1.50%
3 Expenses
3.00%
3.00%
3.00%
3.00%
3.00%
GENERAL FUND
2028
2029
2030
2031
2032
REVENUE
4 General Property Tax-Current
2,067,652
2,131,981
2,198,311
2,221,705
2,292,225
5 Other taxes
29,148
29,731
30,325
30,932
31,550
6 Intergovernmental
67,349
68,696
70,070
71,471
72,901
7 Federal grant
8 Franchise fees
9 Licenses and Permits
177,867
181,425
185,053
188,754
192,529
10 Charges for Services
62,822
64,079
65,360
66,667
68,001
11 Fines & Forfeits
8,170
8,334
8,500
8,670
8,844
12 Interest Earnings
13,035
13,231
13,429
13,631
13,835
13 Miscellaneous Revenues
14 Total Revenue
2,426,044
2,497,475
2,571,049
2,601,831
2,679,885
EXPENSES
16 General Government
744,370
766,701
789,702
813,393
837,795
17
Public Safety
584,273
601,801
619,855
638,451
657,604
18
Public Works
849,458
874,942
901,190
928,226
956,073
19
Park and Recreation
202,943
209,031
215,302
221,761
228,414
20 Capital Outlay
21 Total Expenses
22 Revenues Over / (Under) Expenses OTHER FINANCING SOURCES / (USES)
23 Transfers In
2,381,044
2,452,475
2,526,049
2,601,831
2,679,885
45,000
45,000
45,000
-
-
-
-
-
-
-
25
Sale of Fixed Assets
-
-
26
Bond Proceeds
-
-
-
-
-
27 Transfer in
28 Transfers Out
-
-
-
-
-
29 Total Other Sources / (Uses)
(45,000)
(45,000)
(45,000)
-
-
30 Prior Period Adjustments
31 Ending General Fund Balance (FB)
1,434,213
1,479,213
1,524,213
1,524,213
1,524,213
33
Unassigned
1,434,213
1,479,213
1,524,213
1,524,213
1,524,213
34
Fund Balance as a % of Next Year's Expenditures (net of contingency)
58.5%
58.6%
58.6%
58.6%
55.2%
This proposal includes the cost of a second summer seasonal worker.
Funding includes cost of 2 summer seasonal worker + additional work cost of
$15,900.
Total Increase of budget for salary and wages for 2023, including is $955,700 for a total increase of $108,500 (of that total cost, $39,800 in wages is charged to the utilities.)
Note that this budget does not include the costs of a new administrator with family level insurance. Family plans are an additional $13,700.
In addition, the following additional costs related to personnel should be considered for addition before the end of the year:
$30,000 for 450hr @ $70/hr. of interim administration
$28,000 for outgoing administrator severance
16,000 towards Administrator recruitment ($7,000 cost this year)
The current budget supports the low end of the compensation range for administrators, per LMC salary survey, but not the top end of 120k. Recommended to add $30,000 for additional salary
costs.
TOTAL= $105,000 unaccounted for. Council is requested to provide direction on where cuts should come from to account for this unaccounted for cost.
The following general fund budget does not account for administrative transition costs:
Overall a 10.5% increase in general operation expenses.
Finance & Administration increase 8.5%
Proposed increase of legal service expense to $15,000 for possible code enforcement related expenses. Council can consider use of these funds to carryout surveys of City property or
towards lobbying expenses for the 2023 legislative session.
The 2nd largest increase was $7,600 towards the health insurance.
3nd largest increase of $6,200 is attributable to computer replacement and the addition of an Adobe Acrobat License for Document Alteration.
3rd largest increase is for software support and network maintenance costs for 6,200 these costs include enhancement to online application submission and replacement of computers yet
to replaced as part of technology plan.
Mayor/Legislative Budget reduced by 9.1% a difference of $2,100 in reduction in travel in conference expense due to limited use. (Funds can be drawn from the administrative budget if
needed for more members attending LMC.)
Elections down 86.2% by $6,600 due to lack of a 2023 election
Planning and Building up 12.3% for a difference of $21,100. The change is attributable to a
$22,000 increase in planning services expenses in event of a change in contractor. Depending of the City has Administration carryout minor plan review and project consults, this may
be a reasonable cost estimate.
No changes expected for Assessor costs in 2023
Police Services contract is up by 12 percent from last year. An increase of $18,100.
Fire/EMS Department Total budget
Besides wage increases previously mentioned, this budget proposal includes
$20,400 for the new wage adjustment +31,800 towards call volume increases for fire fighters. This plus the step wage increase for the Fire Chief accounts for most of this department’s
budget increase for a total difference of $52,200.
See Chief Hinz’s attached Memorandum for more details on this proposal. The department’s total increase was $49,810 for 17.8% increase over PY
Animal Control
$1,000 increase due to average increase in activity and cost.
Public Works
DPW has total proposed budget increase over PY of 7.5% or 51,260
Wages increase of $9,400 and a $17,300 increase in health insurance were among the largest increases.
Health insurance increase of $3,600 (Anticipated decrease expected for PEIP Non- union premiums.)
$3,500 to replace dated garage door openers.
$7500 added to road maintenance and repair budget.
Parks & Recreation has a proposed 17.6% increase for a difference of $16,720 over PY
$11,100 incudes 2nd parks seasonal worker.
Increase in recreational events budget 5,000.
Community Center has a proposed 7.4% increase for a difference of $5,440 over PY
An additional $4,000 for repairs and maintenance accounts for most of this increase.
Transfers Out – There are no proposed budgeted transfers out.
EDA
Reduced budget from 10,175 to $5,300
Cable TV reduced its budget by $2650 when compared to PY
Summary of Projected Capital Borrowing vs. Total Capital Costs
Bonding Summary
2023 2024 2025 2026 2027
Local Road Improvement*
-
1,906,000
-
-
4,600,000
Park Capital
-
-
-
-
-
Capital Improvement
-
-
-
-
-
Big Marine Sewer
-
-
100,500
100,500
184,300
Equipment Replacement
816,500
-
950,000
470,000
600,000
Uptown Sewer
Total
816,500
1,906,000
1,050,500
570,500
5,384,300
Capital Outlay Summary
2023 2024 2025 2026 2027
Local Road Improvement
993,000
881,504
913,390
-
1,490,400
Park Capital
17,306
189,621
143,027
73,648
248,161
Capital Improvement
647,000
377,704
359,224
11,699
0
Big Marine Sewer (No Aid)
9,750
919,750
406,819
511,908
571,607
Equipment Replacement
514,500
497,190
894,357
334,580
607,353
Upown Sewer
15,700
39,800
54,800
86,600
81,900
Total
2,197,256
2,905,569
2,771,616
1,018,433
2,999,421
* Proposed to package road improvements for 3 years into one bond issuance.
City of Scandia Financial Management Plan
Presented 11/22/2022
Summary of Projected Capital Borrowing vs. Total Capital Costs
Proposed to package road improve
percent of capital bonded 44%
Proposed to package road improvements for 3 years into one bond issuance.
CITY OF SCANDIA
Capital Improvement Plan Capital Improvement Fund 401
Inflation Assumptions
1 Revenue (Non-property tax) 0.00% 2.00% 2.00% 2.00% 2.00% 2.00%
2 Interest Earnings 0.00% 1.50% 1.50% 1.50% 1.50% 1.50%
3 Expenses 0.00% 3.00% 3.00% 3.00% 3.00% 3.00%
4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%
REVENUE
2022
Budget
2023 2024 2025 2026 2027
Projected
Property taxes 217,336
Intergovernmental -
Capital Improvement Debt Levy
Special assessments 510
Investment Income 4,500
Refunds and Reimbursements
Park Dedication Fees
Rental and lease income -
Miscellaneous Revenue
409,291
- 2,300
-
-
373,375 404,829 426,397 62,346
- -
- - -
- - - -
1,930 1,894 2,606 8,866
- - - -
- - - -
Total Revenue
222,346
411,591
375,305 406,723 429,003 71,212
EXPENSES
Total Current -
Payables internet -
Debt service -
Total Capital Projects 446,358
-
-
- 647,000
- - - -
- - - -
- - - -
377,704 359,224 11,699 -
Total Expenses 446,358
647,000
377,704 359,224 11,699 -
Revenue Over / (Under) Expenses (224,012)
(235,409)
(2,399) 47,499 417,304 71,212
OTHER FINANCING SOURCES / (USES)
Bond Proceeds
Transfers In
Transfers Out to Sewer Fund
Transfers Out-
Total Other Sources / (Uses)
accounts payable
Prior Period Adjustments
Ending Fund Balance
364,064
128,654
126,255 173,754 591,058 662,270
CITY OF SCANDIA
Capital Improvement Plan Capital Improvement Fund 401
4 CIP Inflation
Factor
4.00%
4.00%
4.00%
4.00%
4.00%
2028
2029
2030
2031
2032
CASH FLOW ANALYSIS
REVENUE
5
Property taxes
30,000
67,811
84,678
84,678
84,678
6 Intergovernmental
-
-
-
-
-
7 Capital Improvement Debt Levy
-
-
-
-
-
8 Special assessments
-
-
-
-
-
9 Investment Income
9,934
10,533
11,708
8,351
7,198
10 Refunds and Reimbursements
11 Park Dedication Fees
12 Rental and lease income
-
-
-
-
-
13
Miscellaneous Revenue
Total Revenue
EXPENSES
-
-
-
-
-
14
39,934
78,344
96,386
93,029
91,876
15
Total Current
-
-
-
-
-
16 Payables internet
-
-
-
-
-
17 Debt service
-
-
-
-
-
18 Total Capital Projects
-
-
320,207
169,859
618,083
19 Total Expenses
-
-
320,207
169,859
618,083
20 Revenue Over / (Under) Expenses
39,934
78,344
(223,821)
(76,831)
(526,208)
OTHER FINANCING SOURCES / (USES)
21
Bond Proceeds
750,001
22
Transfers In
-
-
-
-
-
23
Transfers Out to Sewer Fund
24
Transfers Out-
Total Other Sources / (Uses)
accounts payable
Prior Period Adjustments
25
-
-
-
-
750,001
26
27 Ending Fund Balance
702,204
780,548
556,727
479,897
703,690
CITY OF SCANDIA
Capital Improvement Plan Capital Improvement Fund 401
Inflation Assumptions
1 Revenue (Non-property tax) 0.00% 2.00% 2.00% 2.00% 2.00% 2.00%
2 Interest Earnings 0.00% 1.50% 1.50% 1.50% 1.50% 1.50%
3 Expenses 0.00% 3.00% 3.00% 3.00% 3.00% 3.00%
4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%
REVENUE
2022
Budget
2023 2024 2025 2026 2027
Projected
Property taxes 217,336
Intergovernmental -
Capital Improvement Debt Levy
Special assessments 510
Investment Income 4,500
Refunds and Reimbursements
Park Dedication Fees
Rental and lease income -
Miscellaneous Revenue
409,291
- 2,300
-
-
373,375 404,829 426,397 62,346
- -
- - -
- - - -
1,930 1,894 2,606 8,866
- - - -
- - - -
Total Revenue
222,346
411,591
375,305 406,723 429,003 71,212
EXPENSES
Total Current -
Payables internet -
Debt service -
Total Capital Projects 446,358
-
-
- 647,000
- - - -
- - - -
- - - -
377,704 359,224 11,699 -
Total Expenses 446,358
647,000
377,704 359,224 11,699 -
Revenue Over / (Under) Expenses (224,012)
(235,409)
(2,399) 47,499 417,304 71,212
OTHER FINANCING SOURCES / (USES)
Bond Proceeds
Transfers In
Transfers Out to Sewer Fund
Transfers Out-
Total Other Sources / (Uses)
accounts payable
Prior Period Adjustments
Ending Fund Balance
364,064
128,654
126,255 173,754 591,058 662,270
CITY OF SCANDIA
Financial Management Plan
Capital Improvement Fund 401
4 CIP Inflation
Factor
4.00%
4.00%
4.00%
4.00%
4.00%
2028
2029
2030
2031
2032
CASH FLOW ANALYSIS
REVENUE
5
Property taxes
30,000
67,811
84,678
84,678
84,678
6 Intergovernmental
-
-
-
-
-
7 Capital Improvement Debt Levy
-
-
-
-
-
8 Special assessments
-
-
-
-
-
9 Investment Income
9,934
10,533
11,708
8,351
7,198
10 Refunds and Reimbursements
11 Park Dedication Fees
12 Rental and lease income
-
-
-
-
-
13
Miscellaneous Revenue
Total Revenue
EXPENSES
-
-
-
-
-
14
39,934
78,344
96,386
93,029
91,876
15
Total Current
-
-
-
-
-
16 Payables internet
-
-
-
-
-
17 Debt service
-
-
-
-
-
18 Total Capital Projects
-
-
320,207
169,859
618,083
19 Total Expenses
-
-
320,207
169,859
618,083
20 Revenue Over / (Under) Expenses
39,934
78,344
(223,821)
(76,831)
(526,208)
OTHER FINANCING SOURCES / (USES)
21
Bond Proceeds
750,001
22
Transfers In
-
-
-
-
-
23
Transfers Out to Sewer Fund
24
Transfers Out-
Total Other Sources / (Uses)
accounts payable
Prior Period Adjustments
25
-
-
-
-
750,001
26
27 Ending Fund Balance
702,204
780,548
556,727
479,897
703,690
CITY OF SCANDIA
Capital Improvement Plan Capital Improvement Fund 401
Inflation Assumptions
4
CIP Inflation Factor
0.00%
0.00%
4.00%
4.00%
4.00%
4.00%
Project
2022
2022
2023
2024
2025
2026
2027
Capital Project Name
Year
Costs
Budget
Projected
48 2010 Fire Radios Replace 3 unspupported radios
2030
17548
-
-
-
-
-
-
49 2010 Homatro Cutter Twin Line R-1(Jaws of Life)
2030
40945
-
-
-
-
-
-
50 2015 Lucas CPR Device-replacement
2030
17548
-
-
-
-
-
-
51 Cold Storage Building
2030
81890
-
-
-
-
-
-
52 Additional Comm Cent Elec Locks
2030
17548
-
-
-
-
-
-
la
53 Large Hall and Heritage Room Carpeting
2030
58493
-
-
-
-
-
-
54 2000 Station Bay floor epoxy coating-maintenance
2031
21900
-
-
-
-
-
-
55 2010 Washer/Extractor-replacement
2031
9125
-
-
-
-
-
-
56 2012 UTV & Trailer replacement-off road rescue
2031
42583
-
-
-
-
-
-
pital
57
2017 Thermal Imaging Cameras (1of3) find hot spots
2031
9733
-
-
-
-
-
-
Ca
58
Zoll Monitor/Defib
2031
36000
-
-
-
-
-
-
59
Second Fire Station
2032
227757
-
-
-
-
-
-
60 Community Center Design & Planning
2032
189798
-
-
-
-
-
-
61
Air Containment Unit
2033
10527
-
-
-
-
-
-
62 Community Center Improvements
2033
1000000
-
-
-
-
-
-
63
CIP placeholder
2035
75000
-
-
-
-
-
-
64 Total Capital Projects
4,757,273
446,358
647,000
377,704
359,224
11,699
-
CITY OF SCANDIA
Capital Improvement Plan Capital Improvement Fund 401
Inflation Assumptions
4 CIP Inflation Factor 4.00% 4.00% 4.00% 4.00%
4.00%
Project
2022
2028
2029
2030
2031
2032
Capital Project Name
Year
Costs
48 2010 Fire Radios Replace 3 unspupported radios
2030
17548
-
-
24,016
-
-
49 2010 Homatro Cutter Twin Line R-1(Jaws of Life)
2030
40945
-
-
56,036
-
-
50 2015 Lucas CPR Device-replacement
2030
17548
-
-
24,016
-
-
51 Cold Storage Building
2030
81890
-
-
112,072
-
-
52 Additional Comm Cent Elec Locks
2030
17548
-
-
24,016
-
-
la
53 Large Hall and Heritage Room Carpeting
2030
58493
-
-
80,052
-
-
54 2000 Station Bay floor epoxy coating-maintenance
2031
21900
-
-
-
31,171
-
55 2010 Washer/Extractor-replacement
2031
9125
-
-
-
12,988
-
56 2012 UTV & Trailer replacement-off road rescue
2031
42583
-
-
-
60,609
-
pital
2017 Thermal Imaging Cameras (1of3) find hot 57 spots
2031
9733
-
-
-
13,853
-
Ca
58 Zoll Monitor/Defib
2031
36000
-
-
-
51,239
-
59 Second Fire Station
2032
227757
-
-
-
-
337,136
60 Community Center Design & Planning
2032
189798
-
-
-
-
280,947
61 Air Containment Unit
2033
10527
-
-
-
-
-
62 Community Center Improvements
2033
1000000
-
-
-
-
-
63 CIP placeholder
2035
75000
-
-
-
-
-
64 Total Capital Projects
4,757,273
-
-
320,207
169,859
618,083
Inflation Assumptions
CITY OF SCANDIA
Financial Management Plan Park Capital Improvement Fund 404
Inflation Assumptions
CITY OF SCANDIA
Capital Improvement Plan
Park Capital Improvement Fund 404
CITY OF SCANDIA
Financial Management Plan
Equipment Replacement Fund 406
Inflation Assumptions
1
Revenue (Non-property tax)
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2
Interest Earnings
1.50%
1.50%
1.50%
1.50%
1.50%
1.50%
3
Expenses
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
4
CIP Inflation Factor
0.00%
0.00%
4.00%
4.00%
4.00%
4.00%
2022
2023
2024
2025
2026
2027
Budget
Projected
CASH FLOW ANALYSIS
5
REVENUE
Property taxes
87,800
-
64,000
145,000
100,000
22,153
6
Debt service levy
100,505
100,505
217,442
275,295
7
Intergovernmental
-
-
-
-
-
-
8
Sale of capital assets
35,000
-
-
-
9
Investment Income
1,015
1,030
1,045
1,061
1,077
1,093
10
Refunds and Reimbursements
11
Park Dedication Fees
12
Rental and lease income
-
-
-
-
-
-
13
Miscellaneous Revenue
Total Revenue
EXPENSES
Total Current
-
-
-
-
-
-
14
88,815
36,030
165,550
246,566
318,519
298,541
15
-
-
-
-
-
16
Debt service
-
-
95,719
95,719
207,088
262,186
17
Total Capital Projects
198,500
514,500
497,190
894,357
334,580
607,353
18
Total Expenses
198,500
514,500
592,909
990,076
541,667
869,539
19
Revenue Over / (Under) Expenses OTHER FINANCING SOURCES / (USES)
Bond Proceeds
(109,685)
(478,470)
(427,359)
(743,510)
(223,148)
(570,998)
20
816,500
950,000
470,000
600,000
21
Transfers In
22
Transfers Out
23
Transfers Out-
Total Other Sources / (Uses)
Prior Period Adjustments
24
-
816,500
-
950,000
470,000
600,000
25
26 Ending Fund Balance
206,748
544,778
117,419
323,909
570,761
599,763
CITY OF SCANDIA
Financial Management Plan
Equipment Replacement Fund 406
2028 2029
2030
2031
2032
CASH FLOW ANALYSIS
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
REVENUE
Property taxes 47,048 30,817 - -
75,001
Debt service levy 349,151 349,151 398,387 471,012
471,012
Intergovernmental - - - -
-
Sale of capital assets - - - -
-
Investment Income 1,109 1,126 1,143 1,160
1,177
Refunds and Reimbursements
Park Dedication Fees
Rental and lease income - - - -
-
Miscellaneous Revenue
Total Revenue
EXPENSES
Total Current
- - - -
-
397,308 381,094 399,530 472,172
- - - -
547,190
-
Debt service 332,524 332,524 379,417 448,583
448,583
Total Capital Projects 57,901 550,165 449,767 91,775
-
Total Expenses
390,425 882,689 829,183 540,358
6,882 (501,596) (429,653) (68,186)
400,000 590,000
448,583
98,607
300,001
Revenue Over / (Under) Expenses OTHER FINANCING SOURCES / (USES)
Bond Proceeds
Transfers In
Transfers Out
Transfers Out-
Total Other Sources / (Uses)
Prior Period Adjustments
- 400,000 590,000 -
300,001
26 Ending Fund Balance 606,645 505,049 665,397 597,211
995,819
Inflation Assumptions
CITY OF SCANDIA
Capital Equipment Fund 406
Capital Improvement Plan
4 CIP Inflation
Factor
0.00%
0.00%
4.00%
4.00%
4.00%
Project
2021
2022
2023
2024
2025
2026
Capital Project Name
First Year
Costs
Budget
Projected
27 312-08 Asphalt Patching Equipment Trailer (2008)
2025
39000
-
-
-
45,624
-
28 2000 Engine 1 - 5176 Replacement
2025
650000
-
-
-
760,408
-
29 2003 Tanker 5178 Tender 2 Replacement
2024
292000
-
-
328,460
-
-
30 201-14 Mack Single Axle w/Plow (2014)
2026
275000
-
-
-
-
334,580
31 202-17 Western Star Single Axle Truck/Plow (2017)
2029
350000
-
-
-
-
-
32 203-11 Mack Dump Truck/Plow Replacement (2011)
2023
325000
-
325,000
-
-
-
33 301-98 John Deere Motor Grader (1998)
2027
480000
-
-
-
-
-
34 302-22 JD-6410 Tractor w/flail attachments (2022)
2022
198500
198,500
-
-
-
-
35 308-12 New Holland Skit Steer (2012)
2024
65000
-
-
73,116
-
-
O
36 Motor Grader
2022
0
-
-
-
-
-
ent
37
2022
0
-
-
-
-
-
37 101-18 Chev 1/2 ton pickup (2018)
2028
44000
-
-
-
-
-
38 102-19 Dodge 3500 SRW w/plow (2019)
2029
52000
-
-
-
-
-
Eq
39 103-21 Dodge 2500 w/plow (2021)
2031
62000
-
-
-
-
-
tal
40 104-13 Ford F550 w/sander, plow mount, compressor
2024
75000
-
-
84,365
-
-
api
41 1995 Utility 1misc purpose truck - replacement
2023
86500
-
86,500
-
-
-
C
42 2003 Boat & Trailer - water rescues
2023
38000
-
38,000
-
-
-
43 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2023
65000
-
65,000
-
-
-
44 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2030
75000
-
-
-
-
-
45 304-21 Kubota UTV (2021)
2030
16000
-
-
-
-
-
46 Addition Vehicle (truck for addl FT or PT staff)
2025
50500
-
-
-
59,078
-
47 Equipment Attachments (fit skid, loader, tractor)
2024
10000
-
-
11,249
-
-
48 PJ Skid Trailer 14,000 lbs (2012)
2025
17000
-
-
-
19,888
-
49 Rescue 5179 Replacement
2030
225000
-
-
-
-
-
50 Utility Trailer 3,500 lbs (1998)
2025
8000
-
-
-
9,359
-
52 Total Capital Projects
3,498,500
198,500
514,500
497,190
894,357
334,580
CITY OF SCANDIA
Capital Equipment Fund 406
Capital Improvement Plan
Inflation Assumptions
4 CIP Inflation Factor
4.00%
Capital Project Name
Project
First Year
2021
Costs
2027
27 312-08 Asphalt Patching Equipment Trailer (2008)
2025
39000
-
28 2000 Engine 1 - 5176 Replacement
2025
650000
-
29 2003 Tanker 5178 Tender 2 Replacement
2024
292000
-
30 201-14 Mack Single Axle w/Plow (2014)
2026
275000
-
31 202-17 Western Star Single Axle Truck/Plow (2017)
2029
350000
-
32 203-11 Mack Dump Truck/Plow Replacement (2011)
2023
325000
-
33 301-98 John Deere Motor Grader (1998)
2027
480000
607,353
34 302-22 JD-6410 Tractor w/flail attachments (2022)
2022
198500
-
35 308-12 New Holland Skit Steer (2012)
2024
65000
-
O
36 Motor Grader
2022
0
-
ent
37
2022
0
-
37 101-18 Chev 1/2 ton pickup (2018)
2028
44000
-
38 102-19 Dodge 3500 SRW w/plow (2019)
2029
52000
-
Eq
39 103-21 Dodge 2500 w/plow (2021)
2031
62000
-
tal
40 104-13 Ford F550 w/sander, plow mount, compressor
2024
75000
-
api
41 1995 Utility 1misc purpose truck - replacement
2023
86500
-
C
42 2003 Boat & Trailer - water rescues
2023
38000
-
43 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2023
65000
-
44 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2030
75000
-
45 304-21 Kubota UTV (2021)
2030
16000
-
46 Addition Vehicle (truck for addl FT or PT staff)
2025
50500
-
47 Equipment Attachments (fit skid, loader, tractor)
2024
10000
-
48 PJ Skid Trailer 14,000 lbs (2012)
2025
17000
-
49 Rescue 5179 Replacement
2030
225000
-
50 Utility Trailer 3,500 lbs (1998)
2025
8000
-
52 Total Capital Projects
3,498,500
607,353
Inflation Assumptions
4 CIP Inflation Factor
CITY OF SCANDIA
Capital Equipment Fund 406
Capital Improvement Plan
4.00% 4.00% 4.00% 4.00% 4.00%
Capital Project Name
Project
2021
Costs
2028
2029
2030
2031
2032
First Year
27 312-08 Asphalt Patching Equipment Trailer (2008)
2025
39000
-
-
-
-
-
28 2000 Engine 1 - 5176 Replacement
2025
650000
-
-
-
-
-
29 2003 Tanker 5178 Tender 2 Replacement
2024
292000
-
-
-
-
-
30 201-14 Mack Single Axle w/Plow (2014)
2026
275000
-
-
-
-
-
31 202-17 Western Star Single Axle Truck/Plow (2017)
2029
350000
-
478,999
-
-
-
32 203-11 Mack Dump Truck/Plow Replacement (2011)
2023
325000
-
-
-
-
-
33 301-98 John Deere Motor Grader (1998)
2027
480000
-
-
-
-
-
34 302-22 JD-6410 Tractor w/flail attachments (2022)
2022
198500
-
-
-
-
-
35 308-12 New Holland Skit Steer (2012)
2024
65000
-
-
-
-
-
O
36 Motor Grader
2022
0
-
-
-
-
-
ent
37
2022
0
-
-
-
-
-
37 101-18 Chev 1/2 ton pickup (2018)
2028
44000
57,901
-
-
-
-
38 102-19 Dodge 3500 SRW w/plow (2019)
2029
52000
-
71,166
-
-
-
Eq
39 103-21 Dodge 2500 w/plow (2021)
2031
62000
-
-
-
91,775
-
tal
40 104-13 Ford F550 w/sander, plow mount, compressor
2024
75000
-
-
-
-
-
api
41 1995 Utility 1misc purpose truck - replacement
2023
86500
-
-
-
-
-
C
42 2003 Boat & Trailer - water rescues
2023
38000
-
-
-
-
-
43 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2023
65000
-
-
-
-
-
44 303-17 Kubota F39000 Mower w/Broom & Blower (2017)
2030
75000
-
-
106,748
-
-
45 304-21 Kubota UTV (2021)
2030
16000
-
-
22,773
-
-
46 Addition Vehicle (truck for addl FT or PT staff)
2025
50500
-
-
-
-
-
47 Equipment Attachments (fit skid, loader, tractor)
2024
10000
-
-
-
-
-
48 PJ Skid Trailer 14,000 lbs (2012)
2025
17000
-
-
-
-
-
49 Rescue 5179 Replacement
2030
225000
-
-
320,245
-
-
50 Utility Trailer 3,500 lbs (1998)
2025
8000
-
-
-
-
-
52 Total Capital Projects
3,498,500
57,901
550,165
449,767
91,775
-
CITY OF SCANDIA
Financial Management Plan
Local Road Improvement Fund 408
Inflation Assumptions
1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50% 1.50%
3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%
2022 2023 2024 2025 2026 2027
Budget Proposed
REVENUE
Property taxes 216,860
Debt levy -
Special assessments
Investment Income 19,613
Refunds and Reimbursements
Intergovermental
Rental and lease income -
Miscellaneous Revenue -
212,012
- 12,115
6,900
-
-
396,785 196,691 100,000 90,000
192,810 192,810 192,810 658,143
685 25,011 14,877 16,841
6,900 6,900 6,900 6,900
- - - -
- - - -
Total Revenue
236,473
231,027
597,181 421,411 314,586 771,883
EXPENSES
Total Current
Debt service
Principal
- - - - -
- - - 183,628 183,628 183,628
17 Interest
18 Total Capital Projects
707,200
993,000
881,504
913,390
-
1,490,400
19 Total Expenses
707,200
993,000
881,504
1,097,018
183,628
1,674,028
20 Revenue Over / (Under) Expens
(470,727)
(761,973)
(284,323)
(675,607)
130,958
(902,145)
OTHER FINANCING SOURCES / (USES)
21 Bond Proceeds
1,906,000
4,600,000
22 Bond premium
23 Transfers In -
-
-
-
-
-
Transfers Out
Transfers Out-
26 Total Other Sources / (Uses) -
-
1,906,000
-
-
4,600,000
Prior Period Adjustments
Ending Fund Balance 807,673
45,700
1,667,376
991,770
1,122,728
4,820,583
Inflation Assumptions
Revenue (Non-property tax)
Interest Earnings
Expenses
CIP Inflation Factor
REVENUE
Property taxes
Debt levy
Special assessments
Investment Income
Refunds and Reimbursements
Intergovermental
Rental and lease income
Miscellaneous Revenue
Total Revenue
EXPENSES
Total Current
Debt service
Principal
Interest
Total Capital Projects
Total Expenses
Revenue Over / (Under) Expens OTHER FINANCING SOURCES
Bond Proceeds
Bond premium
Transfers In
Transfers Out
Transfers Out-
Total Other Sources / (Uses)
Prior Period Adjustments
Ending Fund Balance
CITY OF SCANDIA
Financial Management Plan
LOCAL ROAD IMPROVEMENT FUND 408
2.00% 2.00% 2.00% 2.00% 2.00%
1.50% 1.50% 1.50% 1.50% 1.50%
3.00% 3.00% 3.00% 3.00% 3.00%
3.00% 4.00% 4.00% 4.00% 4.00%
2028 2029 2030 2031 2032
141,811 100,011 96,497 74,256 300,000
658,143 658,143 658,143 1,113,360 1,113,360
72,309 58,577 41,396 26,384 84,007
6,900 6,900 6,900 6,900 6,900
- - - - -
- - - - -
879,163 823,631 802,936 1,220,900 1,504,268
- - - - - 626,803 626,803 626,803 626,803 1,060,343
1,167,783 1,342,250 1,176,969 1,252,514 1,480,244
1,794,586 1,969,053 1,803,772 1,879,317 2,540,587
(915,423) (1,145,422) (1,000,836) (658,418) (1,036,320)
4,500,000
- - - - -
- - - 4,500,000 -
3,905,159 2,759,738 1,758,902 5,600,484 4,564,164
2.00%
1.50%
3.00%
4.00%
2033
200,000
1,113,360
68,462
6,900
-
-
1,388,723
- 1,060,343
1,539,454
2,599,797
(1,211,074)
-
-
3,353,090
CITY OF SCANDIA
Capital Improvement Plan
Local Road Improvement Fund 408
Inflation Assumptions
4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%
Project
2022
2023
2024
2025
2026
2027
Capital Project Name
First Year
Costs
Budget
Proposed
Est.
Local Road Project Outlay
29 Soil Borings for 2024 & 2025
2023
20000
-
20,000
-
-
-
-
30 Soil Borings for 2026 & 2027
2025
20000
-
-
-
22,497
-
-
31 Soil Borings for 2028 & 2029
2027
20000
-
-
-
-
-
24,333
32 Soil Borings for 2030 & 2031
2029
20000
-
-
-
-
-
-
33 2022 Local Road Improvement Project
2022
707200
707,200
-
-
-
-
-
34 2023 Local Road Improvement Project
2023
790000
-
790,000
-
-
-
-
35 2023 Seal Coat & Crack Filling Project
2023
183000
-
183,000
-
-
-
-
36 2024 Local Road Improvement Project
2024
815000
-
-
881,504
-
-
-
37 2025 Local Road Improvement Project
2025
540000
-
-
-
607,427
-
-
38 2025 Seal Coat & Crack Filling
2025
252000
-
-
-
283,466
-
-
39 2026 Local Road Improvement Project
2027
870000
-
-
-
-
-
1,058,488
40 2026 Seal Coat & Crack Filling Project
2027
335000
-
-
-
-
-
407,579
41 2027 Local Road Improvement Project
2028
900000
-
-
-
-
-
-
42 2027 Seal Coat & Crack Filling
2028
78000
-
-
-
-
-
-
43 2028 Local Road Improvement Project
2029
1000000
-
-
-
-
-
-
44 2029 Local Road Improvement Project
2030
860000
-
-
-
-
-
-
45 2028 Local Road Improvement Project
2031
880000
-
-
-
-
-
-
46 CIP Placeholder
2032
1000000
-
-
-
-
-
-
47 Total Capital Projects
9,290,200
707,200
993,000
881,504
913,390
-
1,490,400
CITY OF SCANDIA
Capital Improvement Plan Local Road Improvement Fund 408
Inflation Assumptions
4 CIP Inflation Factor 3.00% 4.00% 4.00% 4.00% 4.00%
4.00%
Capital Project Name
Project
First Year
Costs
2028
2029
2030
2031
2032
2033
Local Road Project Outlay
29 Soil Borings for 2024 & 2025
2023
20000
-
-
-
-
-
-
30 Soil Borings for 2026 & 2027
2025
20000
-
-
-
-
-
-
31 Soil Borings for 2028 & 2029
2027
20000
-
-
-
-
-
-
32 Soil Borings for 2030 & 2031
2029
20000
-
26,319
-
-
-
-
33 2022 Local Road Improvement Project
2022
707200
-
-
-
-
-
-
34 2023 Local Road Improvement Project
2023
790000
-
-
-
-
-
-
35 2023 Seal Coat & Crack Filling Project
2023
183000
-
-
-
-
-
-
36 2024 Local Road Improvement Project
2024
815000
-
-
-
-
-
-
37 2025 Local Road Improvement Project
2025
540000
-
-
-
-
-
-
38 2025 Seal Coat & Crack Filling
2025
252000
-
-
-
-
-
-
39 2026 Local Road Improvement Project
2027
870000
-
-
-
-
-
-
40 2026 Seal Coat & Crack Filling Project
2027
335000
-
-
-
-
-
-
41 2027 Local Road Improvement Project
2028
900000
1,074,647
-
-
-
-
-
42 2027 Seal Coat & Crack Filling
2028
78000
93,136
-
-
-
-
-
43 2028 Local Road Improvement Project
2029
1000000
-
1,315,932
-
-
-
-
44 2029 Local Road Improvement Project
2030
860000
-
-
1,176,969
-
-
-
45 2028 Local Road Improvement Project
2031
880000
-
-
-
1,252,514
-
-
46 CIP Placeholder
2032
1000000
-
-
-
-
1,480,244
1,539,454
47 Total Capital Projects
9,290,200
1,167,783
1,342,250
1,176,969
1,252,514
1,480,244
1,539,454
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 101 - GENERAL FUND
Revenues
R
101-31000
Washington Cty. Tax Settlement
1,266,589
1,583,000
-
1,755,418
10.9%
Total General Fund Tax Levy
R
101-31040
Fiscal Disparities
124,112
-
-
-
estimate of equalization of disparities distributed by the State from the area wide mill ra
R
101-31701
Gravel Taxes
27,751
20,000
-
20,000
0.0%
Aggregate Material Removal; Production Tax (set by County Board
R
101-31830
Solar Energy Production Tax
6,965
5,000
-
6,000
20.0%
Share set by State of MN
R
101-31900
Penalties & Interest Delinquent Tax
2,475
400
-
400
0.0%
Outstanding Property Tax with Interest
R
101-32150
Utility Permits
6,450
3,000
2,250
3,000
0.0%
Right-of-Way or Work in the Road permit fee revenues $150 per permit
R
101-32180
Tobacco and Liquor Licenses
12,585
8,500
422
10,000
17.6%
Estimated Liquor and Tobacco Licenses without special events
R
101-32190
Other City Permits
2,959
3,000
1,690
3,000
0.0%
(Zoning, Grading, special events, driveways)
R
101-32210
Building Permits
196,155
135,000
71,624
145,000
7.4%
As of mid year at 53%
R
101-32260
Gambling Permits
130
-
115
100
Anticipating diminished gambling permits in 2021 due to Covid-19
R
101-33401
LGA/MVHC/AG/PERA Aid
6,853
13,200
-
7,000
-47.0%
Anticipating similar aid from 2019
R
101-33420
Fire Relief State PERA
39,178
39,600
-
37,000
-6.6%
Anticipating similar aid from 2019
R
101-33422
Other State Grants & Aids
10,763
5,400
-
11,000
103.7%
Fire Fighter Training Reimbursement
R
101-33428
Payments In Lue of Taxes (PILT)
6,086
6,000
-
6,000
0.0%
Compensation from the state for loss of tax base from state owned land
R
101-33620
Recycling Grant
13,062
9,000
13,188
10,500
16.7%
County Recycling Grant
R
101-33630
Local Govt Grants & Aids
-
-
-
-
No anticipated 2021 County Grants
R
101-33640
Other Grants
724
1,000
-
1,200
20.0%
Previously anticipated obtaining grants for turnout gear
R
101-34102
Legal Services
-
-
-
-
To Eliminate Line- Formerly Expense related to legal services for permit review
R
101-34103
Zoning and Planning
12,736
4,300
2,350
6,700
55.8%
Zoning Permit Fees
R
101-34106
Engineering Fees
1,299
-
-
500
To Eliminate Line- Formerly Expense related to recording services for permit review
R
101-34107
Assessment Search Fees
20
100
20
-
-100.0%
$20 per search required at property closing
R
101-34109
Water Usage
140
200
-
100
-50.0%
Revenue for Uptown City-Owned Well (ELEM and Gammelgarden)
R
101-34201
Impound Fees
-
-
-
-
Collected fees for Dog Impoundment
R
101-34202
Fire Protection Services
30,710
31,493
31,493
34,300
8.9%
Contract Revenue from service agreement with May Township
R
101-34301
Restitution
24,432
-
-
-
Line used for Receipt of refunds to Damage to Property
R
101-34303
Dust Control
2,666
2,400
3,180
2,700
12.5%
Payment received each year for dust control at Cedar Cliff
R
101-34304
Reimbursement for Services
5,400
3,600
1,800
3,000
-16.7%
Reimbursement for Accounting Services for Forest Lake Cable Commission
R
101-34740
Coffee Sales
-
-
-
-
0.0%
N/A
R
101-34750
Facilities Rental
6,808
5,000
6,012
5,500
10.0%
Comm. Ctr. Hall Rental, Annex Rental, and Hay Lake Shelter Rental (anticipate 1/4 reve
R
101-34760
Cleaning Fees
100
200
-
100
-50.0%
Claimed cleaning deposits on facilities rentals
2023 Draft Proposed Line-Item Budget Detail
Ty
Code
Description
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
Notes and Descriptions
R
101-34790
Recreation Programs
1,125
1,000
1,400
2,100
110.0%
Fee Revenues from Rec Programming (Yoga/Ice Skating)
R
101-34950
Solar Subscription
-
-
-
1,900
Revenue from City-owned solar installations
R
101-35101
Fines & Forfeitures
6,899
7,000
3,295
7,400
5.7%
Fine revenue from State Courts and Administrative Citations
R
101-35201
Forfeited Land Sales
-
-
-
-
Proceeds from City-owned land sales allocated to the General Fund
R
101-36210
Interest Income
3,133
15,900
3,925
12,100
-23.9%
Allocation of interest earnings on interest bearing accounts and investments
R
101-36230
Donations
8,936
1,500
2,841
2,000
33.3%
Typically Vinterfest Donations, Fire Relief Donations, Park Donations
R
101-36240
Insurance Dividend
7,281
2,000
-
4,100
105.0%
Yearly dividend from LMCITT for City's share of ownership
R
101-36250
Misc. Refund
2,769
2,500
150
3,800
52.0%
Misc. Revenue from records requests, Canidate filling fees, etc.
R
101-39200
Interfund Transfer
-
-
-
-
Transfers In from Other City Funds ($1440 Ballfield maintenance from Park Fund)
TOTAL FUND 101 GENERAL FUND REVENUE
1,837,292
1,909,293
145,755
2,101,918
10.1%
DEPT. 41000 FINANCE AND ADMINISTRATION
E
101-41000-101
Regular Wages & Salaries
171,309
162,600
64,512
Estimated Salaries based on approved 2019 Wage Study Scale
E
101-41000-121
PERA Coord. Employer Contribu.
12,676
12,000
4,828
Estimated based on adjusted employee earnings
E
101-41000-122
FICA Employer Contribution
10,975
10,100
2,970
"
E
101-41000-126
MEDICARE Employer Contribution
2,643
2,400
1,008
"
E
101-41000-131
Employer Paid Health
31,493
23,600
13,501
Projected 10% change conformation not until the last week of Sept 2022
E
101-41000-132
Dental Insurance
-
2,900
484
"
E
101-41000-134
Employer Paid Life
704
600
240
"
E
101-41000-135
Employer Paid Disability
1,299
1,200
251
Lower due to redistribution of cost share between departments no predicated increase
E
101-41000-151
Worker s Comp Insurance Prem
1,462
1,200
1,729
E
101-41000-200
Office Supplies
1,367
1,000
597
1,100
10.0%
E
101-41000-203
Printed Forms & Papers
1,911
1,800
973
1,900
5.6%
E
101-41000-210
Operating Supplies
108
900
666
800
-11.1%
E
101-41000-301
Auditing and Accounting Services
20,200
20,800
17,200
23,500
13.0%
Schlenner Wenner & Co agreement through 2021 fiscal yr.
E
101-41000-304
Legal Services
46,888
40,000
18,507
55,000
37.5%
Cost of corporation counsel and prosecution services
E
101-41000-306
Personal Testing & Recruit
-
-
-
-
E
101-41000-308
Other Professional Services
1,081
1,000
1,404
1,000
0.0%
Abdo & Ehlers Financial Assistance
E
101-41000-309
Software Support & Maintenance
18,156
12,000
12,154
18,200
51.7%
$3,600-website, $5900 Rolltex Server Maintenance/Tech Support, $800 PlanIt, $3100 L
E
101-41000-313
Committee & Commission Reimbur
-
-
-
-
General Fund Reimbursements to standing committees: PRC, TC, IAC, etc.
E
101-41000-316
Conferences & Seminars
-
800
1,049
700
-12.5%
E
101-41000-317
Employee Training
271
500
-
200
-60.0%
2023 Draft Proposed Line-Item Budget Detail
Ty
Code
Description
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
Notes and Descriptions
E
101-41000-319
Other Services
1,309
1,300
74
700
-46.2%
Continuing Disclosure Services, Financial Advising, and Accounting Advising (AEM)
E
101-41000-321
Telephone
4,721
4,500
2,434
3,700
-17.8%
E
101-41000-322
Postage
2,393
2,300
1,066
2,200
-4.3%
E
101-41000-331
Travel Expenses
36
2,500
453
600
-76.0%
E
101-41000-351
Legal Notices Publishing
1,134
2,000
894
1,200
-40.0%
Newspaper Publications for budget, public hearings, and other required postings
E
101-41000-361
Liability/Property Ins
4,628
4,100
4,568
7,100
73.2%
E
101-41000-365
Insurance Claims
-
-
-
-
E
101-41000-381
Utilities-Electric & Gas
10,925
12,000
2,781
13,000
8.3%
Increase due to the cost of gas
E
101-41000-413
Equipment Rental
1,953
2,800
860
1,900
-32.1%
Copy and Postage Machine Expenses; new flat bed scanner
E
101-41000-430
Recycling
26,803
27,800
13,923
30,100
8.3%
Per agreement with SRC on Community Recycling
E
101-41000-433
Dues and Subscriptions
5,634
5,900
290
6,100
3.4%
LMC/MN Mayor's Association/ICMA/MCMA/MCFOA/GFOA
E
101-41000-434
Youth Service Bureau
5,500
5,500
5,500
5,500
0.0%
Support for program for rehabilitation of youth offenders dba Lakes Center for Youth & F
E
101-41000-435
Misc Expense
512
-
-
500
E
101-41000-437
Cable TV Franchise
-
-
-
-
Line to be Eliminated. Revenues now go to the Cable TV Fund 226
E
101-41000-438
Misc. Contractual
3,632
3,600
3,562
4,000
11.1%
codification of ordinances
E
101-41000-439
Refunds Issued
159
-
-
-
E
101-41000-560
Furniture and Fixtures
-
-
-
-
E
101-41000-570
Office Equipment
4,709
4,000
2,603
5,500
37.5%
Purchase of computer replacement for office
TOTAL DEPT. 41000 FINANCE AND ADMINISTRATION
396,590
373,700
181,082
405,500
8.5%
DEPT. 41110 LEGISLATIVE, MAYOR, AND COUNCIL
E
101-41110-101
Regular Wages & Salaries
17,946
18,100
4,486
Mayor and Council
E
101-41110-122
FICA Employer Contribution
212
1,100
106
E
101-41110-126
MEDICARE Employer Contribution
40
300
13
E
101-41110-127
PERA Defined
727
600
139
E
101-41110-151
Worker s Comp Insurance Prem
76
100
-
E
101-41110-308
Other Professional Services
30
-
-
-
E
101-41110-316
Conferences & Seminars
-
1,000
398
700
-30.0%
E
101-41110-331
Travel Expenses
-
1,800
-
-
-100.0%
E
101-41110-560
Furniture and Fixtures
-
-
-
-
E
101-41110-570
Office Equipment
166
-
-
-
TOTAL DEPT. 41110 LEGISLATIVE, MAYOR, AND COUNCIL 19,195 23,000 5,142 20,900 -9.1%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
DEPT. 41410 ELECTIONS
E
101-41410-199
Election Judge
-
4,800
-
-
-100.0%
No anticipated election in 2023
E
101-41410-200
Office Supplies
-
100
-
-
-100.0%
E
101-41410-203
Printed Forms & Papers
-
-
-
-
E
101-41410-210
Operating Supplies
-
1,000
-
200
-80.0%
E
101-41410-351
Legal Notices Publishing
-
200
-
-
-100.0%
E
101-41410-413
Equipment Rental
1,470
1,500
1,515
850
-43.3%
Equipment maintenance charges from Washington County
TOTAL DEPT. 41410 ELECTIONS 1,470 7,600 1,515 1,050 -86.2% DEPT. 41910 PLANNING AND BUILDING
E 101-41910-316 Conferences & Seminars - - - 50 Anticipated no attendance in 2021 due to Covid-19, $50 for APA MN Chapter Members
E
101-41910-319
Other Services
-
-
-
-
Previously Comp Plan Update Expense
E
101-41910-361
Liability/Property Ins
756
1,800
2,006
4,900
172.2%
E
101-41910-438
Misc. Contractual
6,069
11,000
2,342
5,000
-54.5%
State Building Permit Surcharges
E
101-41910-439
Refunds Issued
186
-
(573)
200
TOTAL DEPT. 41910 PLANNING AND BUILDING 155,112 171,920 72,749 193,050 12.3%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code Description
2021
2022
6/30/2022
2023 % Bud Diff
Notes and Descriptions
DEPT. 41960 Assessor
E 101-41960-300 Assessor
22,077
21,600
10,878
21,600 0.0%
Assessor contract w/PAUSZEK, INC. (Patrick Poshek)
TOTAL DEPT. 41950 ASSESSOR 22,077 21,600 10,878 21,600 0.0% DEPT. 42100 POLICE SERVICES
TOTAL DEPT. 42100 POLICE SERVICES 144,647 150,900 309 168,999 12.0%
DEPT. 42200 FIRE & EMS DEPARTMENT
E 101-42200-101 Regular Wages & Salaries 124,411 95,000 52,752
E 101-42200-121 PERA Coord. Employer Contribu. 7,854 9,700 - E 101-42200-124 PERA Public Safety Employer Contribu. -
E 101-42200-122 FICA Employer Contribution 5,453 5,900 2,873
E 101-42200-126 MEDICARE Employer Contribution 2,281 1,400 445
E 101-42200-134 Employer Paid Life 192 200 96
E 101-42200-135 Employer Paid Disability - 700 -
E 101-42200-141 Unemployment Compensation - - - - E 101-42200-151 Worker s Comp Insurance Prem 9,948 9,550 12,640
E 101-42200-200 Office Supplies 358 400 -
E 101-42200-203 Printed Forms & Papers 406 150 -
E 101-42200-209 Medical Supplies 1,245 2,500 2,223
E 101-42200-210 Operating Supplies 12,614 8,000 834
E 101-42200-211 Cleaning Supplies 66 100 18
E 101-42200-212 Fuel 3,590 2,500 1,731
E 101-42200-217 Uniforms & Safety Equipment 3,497 10,000 -
E 101-42200-221 Equipment Parts 828 3,000 205
E 101-42200-222 Tires - - 1,540
E 101-42200-223 Structure Repair & Supplies 461 5,300 13
E 101-42200-240 Small Tools and Minor Equip 5,755 8,500 8,710
E 101-42200-305 Medical Services 4,357 4,500 5,635
E 101-42200-306 Personal Testing & Recruit 2,025 1,500 903
E 101-42200-309 Software Support & Maintenance 18,531 17,000 5,690
E 101-42200-310 Medical Training 102 11,000 -
SeeChief's memo H "
"
"
Inflation
Estimate based on prior years, Inflation
3 set's of turnout gear$6,100, 3 helmets $630, 4 Uniforms for new members$700, 5 set'
New Carpet was supplied & installed for free ESTIMATED $4,000 SAVED
This has SCBA bottles ordered in 2021 due to back order
Annual Fit testing $3400, Medical direction now 0 cost
Hope to recruit 3-5 new members in 2022, medical testing $252 per person
Laserfiche user fee $280/yr., 800Mhz Radios user fee $10,403, Managed IT $6,000, Pa
EMT Refresher now $0 cost, 2023 will be FF 1 & 2 training
2023 Draft Proposed Line-Item Budget Detail
Ty
Code
Description
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
Notes and Descriptions
E
101-42200-316
Conferences & Seminars
-
300
-
250
-16.7%
E
101-42200-317
Employee Training
19,663
8,000
(5,930)
15,000
87.5%
E
101-42200-319
Other Services
2,981
500
70
500
0.0%
E
101-42200-321
Telephone
7,561
6,400
3,299
6,800
6.3%
E
101-42200-322
Postage
7
-
-
-
E
101-42200-324
State of MN-Fire Relief
39,178
35,300
-
35,300
0.0%
E
101-42200-325
City Match-Fire Relief
-
-
-
-
E
101-42200-331
Travel Expenses
50
2,000
-
1,500
-25.0%
E
101-42200-334
Licenses & Permits
175
200
-
200
0.0%
E
101-42200-340
Advertising
-
-
-
-
E
101-42200-361
Liability/Property Ins
8,102
6,000
6,685
6,500
8.3%
E
101-42200-381
Utilities-Electric & Gas
2,718
4,000
5,995
8,000
100.0%
E
101-42200-384
Refuse/Garbage Disposal
974
850
508
1,100
29.4%
E
101-42200-385
Sewer Pumping & Maintenance
270
700
300
700
0.0%
E
101-42200-401
Building Maintenance/Repairs
3,722
2,500
1,302
2,500
0.0%
E
101-42200-403
Improvements Other Than Bldgs.
-
-
-
-
E
101-42200-404
Repair Machinery/Equipment
13,858
8,000
2,981
8,000
0.0%
E
101-42200-407
Well Repair & Maintenance
-
140
-
-
-100.0%
E
101-42200-433
Dues and Subscriptions
2,203
2,100
2,350
2,400
14.3%
E
101-42200-438
Misc. Contractual
2,205
4,100
1,605
4,100
0.0%
E
101-42200-440
Events
807
800
-
800
0.0%
E
101-42200-520
Capital Improvements to Bldgs.
-
-
-
-
E
101-42200-530
Capital Impr Other Than Bldgs.
-
-
1,178
-
E
101-42200-540
Heavy Machinery Capital
-
-
-
-
E 101-42200-560 Furniture and Fixtures
220
500
-
500
0.0%
E 101-42200-570 Office Equipment
928
900
-
900
0.0%
TOTAL DEPT. 42200 FIRE/EMS DEPARTMENT
309,597
280,190
116,650
330,000
17.8%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
DEPT 42700 ANIMAL CONTROL
E 101-42700-314 Animal Control 4,395 4,000 1,700 5,000 25.0% Officer and Impoundment Costs - Companion Animal Control $150/m retainer
TOTAL DEPT. 42700 ANIMAL CONTROL 4,395 4,000 1,700 5,000 25.0% DEPT 43000 PUBLIC WORKS
2023 Draft Proposed Line-Item Budget Detail
Ty
Code
Description
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
Notes and Descriptions
E
101-43000-321
Telephone
4,630
4,800
2,206
3,000
-37.5%
Drop 2 cell phones and radio
E
101-43000-331
Travel Expenses
583
500
-
500
0.0%
E
101-43000-334
Licenses & Permits
68
500
173
500
0.0%
E
101-43000-361
Liability/Property Ins
14,068
9,300
10,362
9,000
-3.2%
E
101-43000-365
Insurance Claims
-
-
-
-
E
101-43000-381
Utilities-Electric & Gas
2,096
3,200
4,142
4,000
25.0%
E
101-43000-384
Refuse/Garbage Disposal
705
900
646
1,000
11.1%
E
101-43000-385
Sewer Pumping & Maintenance
270
800
756
1,600
100.0%
E
101-43000-387
Street Light Utilities
3,689
4,000
2,247
4,200
5.0%
E
101-43000-401
Building Maintenance/Repairs
3,235
5,500
1,226
8,000
45.5%
E
101-43000-403
Improvements Other Than Bldgs.
1,575
-
-
-
E
101-43000-404
Repair Machinery/Equipment
33,518
14,000
378
15,500
10.7%
E
101-43000-405
Contractual Road Maint/Repair
44,144
150,000
32,146
157,500
5.0%
Large patches, overlays, sealcoating, crack sealing
E
101-43000-407
Well Repair & Maintenance
-
-
-
-
RPZ testing, VFD
E
101-43000-413
Equipment Rental
646
3,500
1,304
4,000
14.3%
Chipper during winter
E
101-43000-417
Uniform Rental
1,282
1,000
399
1,100
10.0%
Cinta's
E
101-43000-433
Dues and Subscriptions
-
200
-
200
0.0%
E
101-43000-438
Misc. Contractual
17,894
15,000
931
15,750
5.0%
Crane hoist testing. Pest control, cleaning, unexpected small road project
E
101-43000-439
Refunds Issued
400
-
-
-
E
101-43000-530
Capital Impr Other Than Bldgs.
-
-
1,178
-
E
101-43000-550
Motor Vehicles Capital
-
-
-
-
E
101-43000-560
Furniture and Fixtures
-
-
-
-
E
101-43000-570
Office Equipment
821
3,300
589
1,000
-69.7%
New printer, scanner - 11.5 x 17
TOTAL DEPT 43000 PUBLIC WORKS DEPARTMENT 557,563 681,490 278,396 732,750 7.5%
2023 Draft Proposed Line-Item Budget Detail
Ty Code
Description
Actual
2021
Budget
2022
Actual
6/30/2022
Proposed
2023
% Bud Diff
Notes and Descriptions
DEPT. 45000 PARKS AND RECREATION
E
101-45000-101
Regular Wages & Salaries
19,795
9,800
3,428
E
101-45000-104
Temporary Employee Wages
19,299
29,100
8,688
"
E
101-45000-121
PERA Coord. Employer Contribu.
1,484
700
256
"
E
101-45000-122
FICA Employer Contribution
2,242
2,600
726
"
E
101-45000-126
MEDICARE Employer Contribution
532
600
187
"
E
101-45000-131
Employer Paid Health
-
2,100
1,539
"
E
101-45000-132
Dental Insurance
-
100
18
E
101-45000-134
Employer Paid Life
-
-
72
"
E
101-45000-135
Employer Paid Disability
-
1,000
186
"
E
101-45000-141
Unemployment Compensation
-
-
-
"
E
101-45000-151
Worker s Comp Insurance Prem
1,711
1,450
1,915
"
E
101-45000-200
Office Supplies
-
300
-
E
101-45000-203
Printed Forms & Papers
285
900
78
E
101-45000-210
Operating Supplies
1,868
900
259
E
101-45000-212
Fuel
243
1,500
451
E
101-45000-221
Equipment Parts
242
2,000
233
E
101-45000-223
Structure Repair & Supplies
(451)
500
-
E
101-45000-240
Small Tools and Minor Equip
150
-
360
E
101-45000-312
Planning Services
-
-
-
E
101-45000-313
Committee & Commission Reimbur
1,380
1,200
540
E
101-45000-319
Other Services
898
-
122
E
101-45000-322
Postage
-
-
-
E
101-45000-340
Advertising
-
-
180
200
E
101-45000-353
Sales& Use Tax
37
-
-
E
101-45000-361
Liability/Property Ins
4,817
7,100
7,911
E
101-45000-381
Utilities-Electric & Gas
4,148
4,000
4,450
E
101-45000-384
Refuse/Garbage Disposal
4,553
1,900
2,142
E
101-45000-385
Sewer Pumping & Maintenance
378
500
143
E
101-45000-401
Building Maintenance/Repairs
1,208
6,000
438
E
101-45000-403
Improvements Other Than Bldgs.
-
-
1,486
E
101-45000-404
Repair Machinery/Equipment
203
700
100
E
101-45000-406
Grounds Care
764
4,000
-
Plant replacements - MNDOT, City Hall, W.H., W.E. ballfield, City signs
E
101-45000-438
Misc. Contractual
4,913
3,000
-
E
101-45000-439
Refunds Issued
-
-
-
E
101-45000-440
Events
5,744
3,000
6,493
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
E 101-45000-490
Financial Assistance
-
-
-
-
Program supplemental for those who can't afford classes or programs offered
E 101-45000-530
Capital Impr Other Than Bldgs.
1,505
10,000
-
10,000
0.0%
Rink board and fencing improvements
TOTAL DEPT. 45000 PARKS AND RECREATION
77,948
94,950
42,399
111,670
17.6%
DEPT. 45180 COMMUNITY CENTER
E
101-45180-101
Regular Wages & Salaries
2,956
14,400
6,132
Includes PW Worker Allocation
E
101-45180-104
Temporary Employee Wages
-
-
-
"
E
101-45180-121
PERA Coord. Employer Contribu.
204
1,100
441
"
E
101-45180-122
FICA Employer Contribution
181
900
354
"
E
101-45180-126
MEDICARE Employer Contribution
35
200
92
"
E
101-45180-131
Employer Paid Health
-
3,100
1,498
"
E
101-45180-132
Dental Insurance
-
-
-
E
101-45180-134
Employer Paid Life
-
-
24
"
E
101-45180-135
Employer Paid Disability
-
100
69
"
E
101-45180-151
Worker s Comp Insurance Prem
-
-
-
"
E
101-45180-210
Operating Supplies
1,912
2,800
628
Toilet paper, soap, hand towels, softener salt, wax, floor cleaner, Ice melt
E
101-45180-223
Structure Repair & Supplies
343
6,500
9
toilet and sink parts, kitchen repairs
E
101-45180-334
Licenses & Permits
874
900
777
E
101-45180-361
Liability/Property Ins
2,172
2,300
2,563
E
101-45180-381
Utilities-Electric & Gas
6,018
10,600
6,039
E
101-45180-384
Refuse/Garbage Disposal
1,889
1,800
804
E
101-45180-385
Sewer Pumping & Maintenance
2,549
3,500
1,576
E
101-45180-401
Building Maintenance/Repairs
10,685
13,000
7,245
E
101-45180-404
Repair Machinery/Equipment
2,471
3,000
-
E
101-45180-406
Grounds Care
260
650
-
Plant/ flower replacement, spraying,
E
101-45180-407
Well Repair & Maintenance
-
600
13,675
RPZ testing - annual
E
101-45180-438
Misc. Contractual
1,995
2,500
-
E
101-45180-439
Refunds Issued
-
-
-
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
E 101-45180-520
Capital Improvements to Bldgs.
3,464
6,000
1,999
6,000
0.0%
New furnace's? Hot water heater in the back?
E 101-45180-530
Capital Impr Other Than Bldgs.
2,555
-
-
-
E 101-45180-570
Office Equipment
1,319
-
-
-
TOTAL DEPT. 45180 COMMUNITY CENTER EXPENSE 41,884 73,950 43,925 79,390 7.4%
DEP 49000 INTERFUND TRANSFERS OUT
E 101-49000-720 Interfund Transfers Out 282,690 - - - 0.0%
TOTAL DEPT. 49360 INTERFUND TRANSFERS OUT 282,690 - - - Excess Fund balance transfer to capital
TOTAL FUND 101 GENERAL FUND EXPENDITURES 2,013,167 1,883,300 754,746 2,069,909 9.9%
NET REVENUE OVER EXPENSES - Over/(Under) (175,875) 25,993 (608,991) 32,009
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 225 - ECONOMIC DEVELOPMENT AUTHORITY FUND
R
225-31000
Washington City. Tax Settlement
5,000
8,000
- 5,300
-33.8%
no < 0.0185 percent of the estimated market value in the city; 2021: $147,158
R
225-33640
Other Grants
-
-
- -
No anticipated grant revenues for 2021 at this time.
R
225-36210
Interest Income
85
200
- 200
0.0%
Interest earnings to be redistributed
R
225-39203
Transfer from Other Funds
2,776
-
- -
No anticipated Transfers for 2021
TOTAL FUND 225 REVENUE
7,861
8,200
-
5,500
-32.9%
E
225-46500-210
Operating Supplies
890
-
-
500
Mailing supplies, tourism promotion, and domain for tourism website.
E
225-46500-303
Engineering Fees
-
5,000
-
-
-100.0%
E
225-46500-304
Legal Services
-
-
-
-
E
225-46500-308
Other Professional Services
69
125
-
300
140.0%
Scandia Holiday Market
E
225-46500-340
Advertising/Tourism
-
2,000
75
2,000
0.0%
E
255-46500-433
Dues and Subscriptions
- 2,650
1,653
1,700
-35.8%
$325 for EDAM Dues, $325 Forest Lake Area Chamber, MN Rural Broadband Coalition
E
225-46500-440
Events
- 400
591
800
100.0%
E
255-46500-720
Transfer Out
- -
-
-
TOTAL FUND 225 EXPENDITURES 959 10,175 2,319 5,300 -47.9%
NET REVENUE OVER EXPENSES - Over/(Under) 6,902 (1,975) (2,319) 200 -110.1%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 226 - CABLE TV SPECIAL REVENUE FUND
R
226-36210
Interest Income
96
-
-
100
R
226-38050
Cable TV Franchise Rebates
18,062
15,400
7,815
16,200
5.2%
R
226-38051
PEG Fees
5,131
3,500
2,118
4,200
20.0%
R
226-39203
Transfer In
-
-
-
-
TOTAL FUND 226 REVENUE 23,290 18,900 9,933 20,500 8.5%
E
226-41950-240
Small Tools and Minor Equip
285
-
498
300
E
226-41950-309
Software Support & Maintenance
2,631
3,500
2,019
3,500
0.0%
Boxcast of meetings
E
226-41950-438
Misc. Contractual
2,760
8,000
2,300
5,300
-33.8%
Cost of Filming of Meetings by LACTV
E
226-41950-570
Office Equipment
230
250
26,990
-
-100.0%
E
226-41950-720
Transfer Out
5
- - -
TOTAL FUND 226 EXPENDITURES 5,912 11,750 31,806 9,100 -22.6%
NET REVENUE OVER EXPENSES - Over/(Under) 17,378 7,150 (21,873) 11,400 59.4%
FUND 313 - 2013A DEBT SERVICE FUND
R
313-31000
Washington City. Tax Settlement
68,220
67,000
- 64,000
-4.5%
2013 EQUIPMENT CERTIFICATE FOR $570,000 FOR 10 YR TERM
R
313-36210
Interest Income
-
-
- -
INTEREST RATE 2.2-3.55%
R
313-39350
Certificate of Indebtedness
-
-
- -
TOTAL FUND 313 REVENUE
68,220
67,000
-
64,000
-4.5%
E
313-47000-304
Legal Services
-
-
-
-
E
313-47000-601
Long Term Debt Principal
60,000
60,000
60,000
60,000
0.0%
E
313-47000-611
Long Term Debt Interest
7,140
2,790
1,860
3,047
9.2%
E
313-47000-620
Fiscal Agent s Fees
495
495
495
500
1.0%
TOTAL FUND 313 EXPENDITURES
67,635
63,285
62,355
63,547
0.4%
NET REVENUE OVER EXPENSES - Over/(Under)
585
3,715
(62,355)
453
(0)
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 318 - 2018 G.O. ROAD IMPROVEMENT BONDS DEBT SERVICE FUND
R
318-31000
Washington City. Tax Settlement
341,456
344,531
- 342,546
-0.6%
Payoff 2033
R
318-36210
Interest Income
-
-
- -
First Call Date for Refinancing 12/15/2025
R
318-39200
Interfund Operating Transfer
-
-
- -
Life Span 9.107 Years
TOTAL FUND 318 REVENUE 344,531 - 342,546 -0.6%
E
318-47000-304
Legal Services
E
318-47000-601
Long Term Debt Principal
220,000
230,000
-
250,000
8.7%
$3,835,000 original issue toward 2018 Road Projects totaling $4,672,273
E
318-47000-611
Long Term Debt Interest
104,725
98,125
49,063
91,225
-7.0%
E
318-47000-620
Fiscal Agent s Fees
495
495
495
500
1.0%
TOTAL FUND 318 EXPENDITURES 325,220 328,620 49,558 341,725 4.0%
NET REVENUE OVER EXPENSES - Over/(Under) (325,220) 15,911 (49,558) 821 -94.8%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff Notes and Descriptions
FUND 401 - GENERAL CAPITAL FUND
R
401-31000
Washington City. Tax Settlement
100,000
217,336
- 409,291
88.3% Recommended Levy per FMP
R
401-31951
Special Assessments Principal
384
-
- -
R
401-31952
SA Penalties & Interest
7
-
- -
R
401-33422
Other State Grants & Aids
-
240,625
- -
-100.0%
R
401-33640
Other Grants
-
-
- -
R
401-36100
Special Assessments
1,807
-
- -
R
401-36210
Interest Income
2,941
4,500
- 2,300
-48.9%
R
401-36230
Donations
6,089
-
- -
R
401-39101
Sales of General Fixed Assets
-
-
- -
R
401-39200
Interfund Operating Transfer
200,000
-
- -
TOTAL FUND 401 REVENUE 311,228 462,461 - 411,591 -11.0%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty
Code Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
E
FUND 401 EXPENSES
401-41000-520 Administration Capital to Bldgs.
-
-
12,750
-
E
401-41000-530 Administration Capital
19,389
319,280
4,950
482,000
51.0%
E
401-42200-520 Fire Capital to Bldgs.
-
-
-
65,000
E
401-42200-530 Fire Capital
236,793
-
-
-
E
401-43000-520 Public Works Capital to Bldgs.
-
-
-
-
E
401-43000-530 Public Works Capital
-
-
-
-
E
401-43100-530 Streets and Roads
-
-
-
-
E
401-45000-520 Park Capital to Buildings
-
-
-
-
E
401-45000-530 Park Capital
-
-
-
-
E
401-45180-520 Community Center Building Impr
17,815
52,000
16,609
-
-100.0%
E
401-45180-530 Community Center Capital
11,024
-
-
-
E
401-48000-101 Regular Wages & Salaries
-
-
-
-
Discontinued
E
401-48000-303 Engineering Fees
-
-
-
-
E
401-48000-308 Other Professional Services
-
-
-
-
E
401-48000-312 Planning Services
-
-
-
-
E
401-48000-435 Misc. Expense
-
-
-
-
E
401-48000-438 Misc. Contractual
-
286,000
-
-
-100.0%
E
401-48000-520 Capital Improvements to Bldgs.
-
-
-
-
E
401-48000-530 Capital Imp Other Than Bldgs.
237,250
-
-
100,000
E
401-48000-540 Heavy Machinery Capital
-
-
-
-
E
401-48000-550 Motor Vehicles Capital
-
-
-
-
E
401-48000-560 Furniture and Fixtures
-
-
-
-
E
401-48000-570 Office Equipment
-
-
-
-
E
401-48000-720 Operating Transfers
-
-
-
-
E
401-48500-303 Engineering Fees
-
-
-
-
TOTAL FUND 401 EXPENDITURES 522,271 657,280 34,309 647,000 -1.6%
NET REVENUE OVER EXPENSES - Over/(Under) (211,043) (194,819) (34,309) (235,409) 20.8%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 404 - PARK CAPITAL FUND
R
404-31000
Washington City. Tax Settlement
10,000
20,000
- 20,000
0.0%
R
404-33422
Other State Grants & Aids
5,243
104,000
- -
-100.0%
R
404-33640
Other Grants
-
-
- -
R
404-34730
Ballfield Ad Revenue
-
-
- -
R
404-34780
Park Dedication Fees
3,000
3,000
- 21,000
600.0%
7 new lots Rolling Acres 61 Subdivision on Keystone Avenue N
R
404-36210
Interest Income
493
1,200
- 66
-94.5%
R
404-36230
Donations
-
-
1,400 -
R
404-36260
Sale of Equipment
-
-
- -
R
404-39101
Sales of General Fixed Assets
-
-
- -
R
404-39203
Transfer from Other Funds
-
-
- -
TOTAL 404 FUND REVENUE 18,735 128,200 1,400 41,066 -68.0%
E
404-48000-210
Operating Supplies
-
-
-
-
E
404-48000-302
Surveying
-
-
-
-
E
404-48000-303
Engineering Fees
-
-
-
-
E
404-48000-304
Legal Services
-
-
-
-
E
404-48000-308
Other Professional Services
-
-
-
-
E
404-48000-312
Planning Services
-
15,600
-
-
-100.0%
E
404-48000-381
Utilities-Electric & Gas
-
-
-
-
E
404-48000-384
Refuse/Garbage Disposal
-
-
-
-
E
404-48000-510
Capital Outlay-Land
-
-
-
-
E
404-48000-512
Easement Acquisition
-
-
-
-
E
404-48000-520
Capital Improvements to Bldgs.
-
-
-
-
E
404-48000-530
Capital Impr Other Than Bldgs.
18,345
219,008
3,125
17,306
-92.1%
E
404-48000-560
Furniture and Fixtures
-
-
-
-
E
404-48000-710
Residual Equity Transfers
-
-
-
-
E
404-48000-720
Operating Transfers
-
1,440
-
-
-100.0%
Ballfield Labor Expense to be transferred to General Fund
TOTAL FUND 404 EXPENDITURES 18,345 236,048 3,125 17,306 -92.7%
NET REVENUE OVER EXPENSES - Over/(Under) 390 (107,848) (1,725) 23,760 -122.0%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 406 - EQUIPMENT CAPITAL FUND
R
406-31000
Washington City. Tax Settlement
130,000
87,800
- -
-100.0%
R
406-36210
Interest Income
657
1,015
- 1,030
1.5%
R
406-36230
Donations
-
-
- -
R
406-36250
Misc. Refund
-
-
- -
R
406-36260
Sale of Equipment
42,038
-
- 35,000
R
406-39200
Interfund Operating Transfer
-
-
- -
R
406-39350
Certificate of Indebtedness
-
-
- 816,500
TOTAL 406 FUND REVENUE 172,695 88,815 - 852,530 859.9%
E
406-48500-304
Legal Services
-
-
-
-
E
406-48500-319
Other Services
-
-
-
-
E
406-48500-340
Advertising
-
-
-
-
E
406-48500-540
Heavy Machinery Capital
-
198,500
204,506
325,000
63.7%
E
406-48500-550
Motor Vehicles Capital
40,073
-
-
189,500
E
406-48500-560
Furniture and Fixtures
-
-
-
-
E
406-48500-570
Office Equipment
-
-
-
-
E
406-48500-720
Operating Transfers
-
-
-
-
TOTAL FUND 406 EXPENDITURES 40,073 198,500 204,506 514,500 159.2%
NET REVENUE OVER EXPENSES - Over/(Under) 132,622 (109,685) (204,506) 338,030 -408.2%
2023 Draft Proposed Line-Item Budget Detail
Actual
Budget
Actual
Proposed
Ty Code
Description
2021
2022
6/30/2022
2023
% Bud Diff
Notes and Descriptions
FUND 408 - LOCAL ROAD IMPROVEMENT FUND
R
408-31000
Washington City. Tax Settlement
438,539
216,860
-
212,012
-2.2%
R
408-33422
Other State Grants & Aids
89,362
-
11,290
-
R
408-34304
Reimbursement for Services
-
-
-
-
R
408-36100
Special Assessments
-
-
-
-
R
408-36210
Interest Income
4,298
19,613
-
12,115
-38.2%
R
408-39203
Transfer from Other Funds
80,000
-
-
-
R
408-39310
Proceeds-Gen Obligation Bond
-
-
-
-
R
408-36250
Misc. Refund
-
-
-
-
TOTAL 408 FUND REVENUE 612,199 236,473 11,290 224,127 -5.2%
E
408-43100-303
Engineering Fees
160,493
-
42,852
20,000
E
408-43100-530
Capital Impr Other Than Bldgs.
799,606
707,200
322
973,000
37.6%
E 408-43100-720 Operating Transfers - - - -
TOTAL FUND 408 EXPENDITURES 960,100 707,200 43,173 993,000 40.4%
NET REVENUE OVER EXPENSES - Over/(Under) (347,901) (470,727) (31,883) (768,873) 63.3%