Loading...
11-22-2022_Draft_Proposed_2023_Scandia_Budget_Packet_Smaller  Presented Tuesday, November 22, 2022  Brief Summary on Levy and Projected Tax Rate Changes 2022 Assessment Year and Changes in Net Tax Capacity Proposed 2023 General Fund Budget Discussion of financing and budgeting practices Discussion of capital budget. Comparison of tax rates and distribution between taxing jurisdictions. Questions, comments, direction are welcomed through this discussion.  Consider funding for 2023 administration transition. Re-evaluation of capital budgeting priorities to better fit long-term financial limitations. Particularly the spending down of cash balances of capital funds.  The City as one of the largest yearly increase in values. There was a 27% increase in median home values comparing the 2022 assessment year and that of 2021. nd The City was the 2 highest City in the county for increased median taxable market value. There were 20 new construction starts during the 2022 assessment year. This is consistent with new start trends pre- 2018 suggesting a return to normal construction activity as of Covid-19 restrictions. A combination of $9,198,600 in total value new construction assessed value during the 2022 assessment year and a surge in existing home sale prices and its effect on general property assessments accounts for 24.9% of growth in total value.  * Net Tax Capacity is the total amount of property value in the City that is taxable. This total excludes value based on tax classifications set by the State. 2024 is a estimate that there will only be moderate change in value for 2024 but there is no certainty on this. Although the 2022 assessment year has resulted in a significant increase in assessed value, 25.1% for a difference of $2,224,467. This additional value, at first glance would imply considerable additional capacity, but the County applied a 25% equalization to the City as a whole, largely due to higher than assessed property sales in the 2022 assessment year. Although there is additional capacity created by this adjustment, it is important to consider a levy that takes into account higher valuation. Therefore, this budget proposal includes a estimated -15.35% drop in tax rate with a 8.54% in total city levy increase.   Proposed 8.7% Overall Property Tax Levy Increase or $ 312,141 for a net total levy on taxable property of $2,680,259 after a $123,297 fiscal disparity deduction. As part if that proposed overall increase, The proposed General Fund levy increased by 10.6% for a total difference of $167,418 to $1,750,418. The debt service levy dropped 8.86% for a difference of -$35,519. The proposed 2023 debt service levy is $406,536. The proposed 2023 Capital Improvement Levy is $641,302. That includes a increase of $99,306 over PY or 18.32% The proposed 2023 EDA levy is proposed to $5,300 for a reduction of $2,700. Total proposed 2023 property levy of $2,803,556 w/o Fiscal Disparities Program Deduction (was $2,579,051in 2022) Proposed City Tax Rate Reduction of -4.7% to 26.276% (was 30.945% in 2022) DRAFT 2023 Budget 2023 Estimated City Tax Rate Impacts 1.00% 1.25% 0.50% 0.65% 1.50% 2.00% 1.00% 1.25% 0.50% 0.65% 1.50% 2.00% (Assumes no changes in property value) These are estimated costs based on Washington County Estimated net tax capacity for 2023 and are strictly a reflection of the predicted change in only the City's property tax. The following is a breakdown of tax bill impacts: Property Tax Classification Cost per $1,000 in value Difference over PY Cost per $100,000 in value Difference over PY Cost per $250,000 in value Difference over PY Per Median Difference Value of over PY $597,000  Class 1a Homestead Under $500k $2.63 -$0.66 $263.25 -$66.00 $658.13 -$164.99   Class 1a Homestead Over $500k $3.29 -$0.82 $329.07 $329.07 $822.67 $822.67 See table below  Class 2a Agricutural Land first $1.5Mil $1.32 -$0.33 $131.63 -$33.00 $329.07 -$82.50 $785.81 -$19.37  Class 2c Managed Forest Land $1.71 -$0.43 $171.11 -$42.90 $427.79 -$107.25 $1,021.55 -$25.18  Class 3a Commercial-Industrial, Utility first $150k $3.95 -$0.99 $394.88 -$99.00    Class 3a Commercial-Industrial, Utility over $150k $5.27 -$1.32  $1,316.27 -$83.05 $2,945.80 -$27.98   Property Tax Classification Cost per $600,000 in value Difference over PY Cost per $800,000 in value Difference over PY Cost per $1,000,000 in value Difference over PY  Class 1a Homestead Under $500k     Class 1a Homestead Over $500k $1,974.40 -$494.98 $2,632.53 $0.00 $3,290.66 -$824.96  Class 2a Agricutural Land first $1.5Mil $789.76 -$197.99 $1,053.01 -$263.99 $1,316.27 -$329.99  Class 2c Managed Forest Land $1,026.69 -$257.39 $1,368.92 -$343.18 $1,711.14 -$428.98  Class 3a Commercial-Industrial, Utility first $150k     Class 3a Commercial-Industrial, Utility over $150k $2,961.60 -$742.47 $4,014.61 -$1,006.45 $5,067.62 -$1,270.44  * The Assessor's estimated median home value for 2022. Estimates for 2023 will be available next year. 2023 Proposed Est City Tax Rate 26.3253% Estimated 25.1% Change in Market Value Between 2022 to 2023, which is the city median change in market value. 2022 City Tax Rate 30.9455% 2022 Median Value applicable to 2023 tax year. (Assumes change from 2022 Median Home Value to 2023 Median Home Value) The following is an estimated cost change if a home value went from median home value to new median home value: 2023 Median Home Value $597,000  40.000000% 35.000000% 30.000000% 25.000000% 20.000000% 15.000000% 10.000000% 5.000000% 0.000000%  ` Tax Rate Comparisons Pay 2022 Tax Pay Rate 2023  Taxing Authority Rate Tax Rate Est  1 Scandia 30.945% 26.235%  2 Afton 32.007% 27.044%  3 Bayport 33.463% 28.945%  4 Marine on St Croix 59.002% 44.639%   Draft Proposed Preliminary 2023 Budget (No Tax Rate Change) Current, Proposed Preliminary and Projected Property Tax Levies 2021 2022 2023 2024 2025 2026 2027   Levy Levy Prop. Prelim Projected Projected Projected Projected  General Fund $ 1,394,586 $ 1,583,000 $ 1,755,418 $ 1,784,189 $ 1,841,089 $ 1,899,763 $ 1,960,265  EDA 5,000 8,000 5,300 8,000 8,000 8,000 8,000  Debt Service 1,131,322 996,051 1,053,139 1,511,109 1,421,001 1,425,190 1,489,533  General Capital Improvement 100,000 217,336 409,291 373,375 404,829 426,397 62,346  Park Improvement 10,000 20,000 20,000 30,000 30,000 40,000 30,588  Equipment Replacement 130,000 87,800 - 64,000 145,000 100,000 22,153  Local Road Improvement 438,539 216,860 212,012 396,785 196,691 100,000 90,000   3,209,447 3,129,047 3,455,159 4,167,458 4,046,611 3,999,350 3,662,885   Draft Proposed Preliminary 2023 Budget (No Tax Rate Change) Comparison between 2023 Proposed and 2022 Levies 2022 $ change 2023 % Change Tax Capacity Based Levy Final Levy 2022 to 2023 Proposed 2022 to 2023  General Fund $ 1,583,000 $ 172,418 $ 1,755,418 10.89% EDA 8,000 $ (2,700) 5,300 -33.75% Debt Service 446,055 $ (39,519) 406,536 -8.86% General Capital Improveme 217,336 $ 191,955 409,291 88.32% Park Improvement 20,000 $ - 20,000 0.00% Equipment Replacement 87,800 $ (87,800) - -100.00% Local Road Improvement 216,860 $ 192,431 409,291 88.73%  $ 2,579,051 $ 426,784 $ 3,005,835 16.55%  Park Improve Equipment 1% Replacement 0% Local Road General Capital Improvement Improvement 14% 14% General Fund 58% Debt Service 13% EDA 0% 2023 Proposed Property Tax Levy   CITY OF SCANDIA Financial Management Plan Draft Proposed 2023 Levies, Tax Rates and Projections Inflation Assumptions   1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%  2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50% 1.50%  3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%   Budget Proposed Projected  Levy by Type 2022 2023 2024 2025 2026 2027   34 General Fund (Certified) Operating Tax Levy 1,583,000 1,755,418 1,784,189 1,841,089 1,899,763 1,960,265   35 Annual Increase 13.5% 10.9% 1.6% 3.2% 3.2% 3.2%    36 OTHER SPECIAL TAX LEVIES Debt service 2013 Certificates         37  67,000 64,000 - - - -   39 2017 Certificates 34,524 - - - - -   40 2018 GO Bonds 344,531 342,536 345,634 343,166 340,541 343,009   41 Local road improvement debt levy - - 192,810 192,810 192,810 658,143   42 Capital improvement debt levy - - - - - -   43 Equipment replacement debt levy - - 100,505 100,505 217,442 275,295   44 Park Improvement 20,000 20,000 30,000 30,000 40,000 30,588   45 Equipment Replacement 87,800 - 64,000 145,000 100,000 22,153   46 Local Road Improvement 216,860 212,012 396,785 196,691 100,000 90,000   47 General Capital Improvement 217,336 409,291 373,375 404,829 426,397 62,346   48 EDA Total Other Special Levies Total Tax Levy 8,000 5,300 8,000 8,000 8,000 8,000   49  996,051 1,053,139 1,511,109 1,421,001 1,425,190 1,489,533   50  2,579,051 2,808,556 3,295,297 3,262,090 3,324,953 3,449,799   51 Increase/(Decrease) in Total Tax Levy 2.10% 8.90% 17.33% -1.01% 1.93% 3.75%   52 Less: Fiscal Disparities (210,933) (123,297) (103,651) (119,958) (119,864) (118,109)   53 Net Levy to Taxpayers 2,368,118 2,685,259 3,191,647 3,142,132 3,205,090 3,331,690   54 Existing Tax Base 8,140,985 10,365,452 10,420,589 10,370,969 10,527,776 10,898,275   55 New Net Tax Capacity 229,974 2,224,467 55,137 (49,620) 156,807 370,499   56 Total Net Tax Capacity 7,903,617 10,216,264 10,475,726 10,321,349 10,684,583 11,268,774   57 Tax Rate on Tax Capacity 30.945% 26.325% 30.467% 30.443% 29.997% 29.566%   58 Tax Rate % Change 0.13% -4.62% 4.14% -0.02% -0.45% -0.43%   59 Total Tax Base Increase 2% 29% 3% -1% 4% 5%   CITY OF SCANDIA Financial Management Plan Draft Proposed Estimated 2023-2032 Projections Inflation Assumptions   1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00%  2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50%  3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00%   Levy by Type    2028 2029 2030 2031 2032   34 General Fund (Certified) Operating Tax Levy 2,067,652 2,131,981 2,198,311 2,221,705 2,292,225   35 Annual Increase 5.5% 3.1% 3.1% 1.1% 3.2%    OTHER SPECIAL TAX LEVIES        36 Debt service        37 2013 Certificates     39 2017 Certificates     40 2018 GO Bonds 345,161 341,749 343,429 344,794 340,594   41 Local road improvement debt levy 658,143 658,143 658,143 1,113,360 1,113,360   42 Capital improvement debt levy - - - - -   43 Equipment replacement debt levy 349,151 349,151 398,387 471,012 1,126   44 Park Improvement 20,000 23,526 20,867 - 20,000   45 Equipment Replacement 47,048 30,817 - - 75,001   46 Local Road Improvement 141,811 100,011 96,497 74,256 300,000   47 General Capital Improvement 30,000 67,811 84,678 84,678 84,678   48 EDA 12,000 12,000 12,000 12,000 5,000   49 Total Other Special Levies 1,603,314 1,583,208 1,614,001 2,100,099 1,939,759   50 Total Tax Levy 3,670,965 3,715,189 3,812,312 4,321,804 4,231,985   51 Increase/(Decrease) in Total Tax Levy 6.41% 1.20% 2.61% 13.36% -2.08%   52 Less: Fiscal Disparities (116,409) (121,761) (120,679) (121,546) (135,581)   53 Net Levy to Taxpayers 3,554,556 3,593,428 3,691,633 4,200,259 4,096,404   54 Existing Tax Base 11,494,149 11,724,032 11,958,513 12,197,683 12,441,637   55 New Net Tax Capacity 0 0 0 0 0   56 Total Net Tax Capacity 11,494,149 11,724,032 11,958,513 12,197,683 12,441,637   57 Tax Rate on Tax Capacity 30.925% 30.650% 30.870% 34.435% 32.925%   58 Tax Rate % Change 4.60% -0.89% 0.72% 11.55% -4.38%   59 Total Tax Base Increase 2% 2% 2% 2% 2%    Given the City’s ambitious Capital Improvement Plan, it is likely that the City will need to reassess it capital priorities to fit within tax limitations. The City needs to adopt a balanced pay-as-you-go and borrowing plan that is flexible to changing economic conditions. Pay-as-go means to save funds to purchase or finance capital. This practice is especially suited for certain capital that is not eligible for access to lending and must be saved for. It can also present savings opportunities by avoiding lending costs. Borrowing implies utilizing bank certificates, bonding, or state infrastructure PFA financing. Currently, a balanced budget can be achieved with this proposal for the General Fund, but to carryout planned 2023 expenditures with a draw down approx. $1,000,000 of fund balance. Additional planning is needed to consider 2024 and beyond, which will be part of future capital investment meetings with the City Council.   Current Draft Budget Proposes the following: An increase of the General Fund Tax Levy from $1,583,000 to $1,784,14; a12.7% or $201,141 increase. Proposal would increase the General Fund’s fund balance by $32,900 for a Fund Balance which is estimated to be 65.8% of the 2024 Fiscal Year's Expenditures, policy is to have 50% to 60% general fund balance. A 7.4% increase in building permit revenue for an estimated $10k increase. Overall General Fund Revenue increase of 9.8% for a difference of $187,625. Summary Proposed Preliminary 2023 Budget General Fund 101 Revenues Actual 2021 Budget 2022 Actual 6/30/2022  Proposed 2023   % Bud Diff  General Property Tax-Current $1,266,589 $1,583,000 $0  $1,755,418  10.9%  Other taxes $161,304 $25,400 $0  $26,400  20.0%  Licenses and permits $218,279 $149,500 $76,101  $161,100  25.1%  Intergovernmental revenue $62,881 $64,200 $0  $61,000  50.2%  Grants $13,786 $10,000 $13,188  $11,700  36.7%  Charges for services $85,435 $48,293 $46,255  $56,900  -19.4%  Fines & Forfeitures $6,899 $7,000 $3,295  $7,400  5.7%  Interest earnings $3,133 $15,900 $3,925  $12,100  -23.9%  Donations $8,936 $1,500 $2,841  $2,000  33.3%  Miscellaneous revenue $7,281 $2,000 $0  $4,100  105.0%  Refunds and reimbursements $2,769 $2,500 $150  $3,800  52.0%  Transfers from Other funds $0 $0 $0  $0  0.0%  TOTAL $1,837,292 # $1,909,293 # $145,755  $2,101,918  0.100888015   Summary Proposed Preliminary 2023 Budget General Fund 101 Department Expenses Actual 2021 Budget 2022 Actual 6/30/2022  Proposed 2023   % Bud Diff  41000 Finance & Administration $396,590 $374,300 $181,370  $406,100  -106.9%  41110 Legislative, Mayor, and Council $19,195 $23,000 $5,142  $20,900  -130.0%  41410 Elections $1,470 $7,600 $1,515  $1,050  -423.3%  41910 Planning and Building $155,112 $171,320 $72,461  $192,450  3109.9%  41960 Asessor $22,077 $21,600 $10,878  $21,600  0.0%  42100 Police Services $144,647 $150,900 $309  $168,999  12.0%  42200 Fire & EMS $309,597 $280,190 $116,650  $330,000  44.8%  42700 Animal Control $4,395 $4,000 $1,700  $5,000  25.0%  43000 Public Works $557,563 $681,490 $278,396  $732,750  223.7%  45000 Parks & Recreation $77,948 $94,950 $42,399  $111,670  682.4%  45180 Community Center $41,884 $73,950 $43,925  $79,390  152.8%  49000 Interfund Transfers Out $282,690 $0 $0  $0  0.0%  TOTAL $2,013,167 # $1,883,300 # $754,746  $2,069,909  9.9%   CITY OF SCANDIA Financial Management Plan Draft Proposed 2023 Levies, Tax Rates and Projections Inflation Assumptions   1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%  2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50% 1.50%  3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%    Budget Proposed Projected   GENERAL FUND 2022 2023 2024 2025 2026 2027   REVENUE         4 General Property Tax-Current 1,583,000 1,755,418 1,784,189 1,841,089 1,899,763 1,960,265   5 Other taxes 25,400 26,400 26,928 27,467 28,016 28,576   6 Intergovernmental 64,200 61,000 62,220 63,464 64,734 66,028   7 Federal grant 10,000 11,700 - - - -   8 Franchise fees - - - - - -   9 Licenses and Permits 149,500 161,100 164,322 167,608 170,961 174,380   10 Charges for Services 48,293 56,900 58,038 59,199 60,383 61,590   11 Fines & Forfeits 7,000 7,400 7,548 7,699 7,853 8,010   12 Interest Earnings 15,900 12,100 12,282 12,466 12,653 12,842   13 Miscellaneous Revenues 6,000 9,900 - - - -   14 Total Revenue 1,909,293 2,101,918 2,115,526 2,178,992 2,244,362 2,311,693   EXPENSES         16 General Government 617,820 642,100 661,363 681,204 701,640 722,689   17 Public Safety 435,090 503,999 519,119 534,693 550,733 567,255   18 Public Works 683,490 732,750 754,733 777,374 800,696 824,717   19 Park and Recreation 152,900 175,060 180,312 185,721 191,293 197,032   Capital Outlay Total Expenses Revenues Over / (Under) Expenses OTHER FINANCING SOURCES / (USES) Transfers In 16,000 16,000 - - - -    1,905,300 2,069,909 2,115,526 2,178,992 2,244,362 2,311,693    3,993 32,009 - - - -    - - - - - -   25 Sale of Fixed Assets - - - - - -   26 Bond Proceeds - - - - - -   27 Transfer in - - - - - -   Transfers Out Total Other Sources / (Uses) Prior Period Adjustments - - - - - -    - - - - - -   31 Ending General Fund Balance (FB) Unassigned Fund Balance as a % of Next Year's Expenditures (net of contingency) 1,357,204 1,357,204 65.6% 1,389,213 1,389,213 1,389,213 1,389,213 65.7% 63.8% 1,389,213 1,389,213 61.9% 1,389,213 1,389,213 60.1% 1,389,213 1,389,213 58.3%   CITY OF SCANDIA Financial Management Plan Draft Proposed 2023 Levies, Tax Rates and Projections Inflation Assumptions   1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00%  2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50%  3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00%    GENERAL FUND     2028 2029 2030 2031 2032   REVENUE        4 General Property Tax-Current 2,067,652 2,131,981 2,198,311 2,221,705 2,292,225   5 Other taxes 29,148 29,731 30,325 30,932 31,550   6 Intergovernmental 67,349 68,696 70,070 71,471 72,901   7 Federal grant     8 Franchise fees     9 Licenses and Permits 177,867 181,425 185,053 188,754 192,529   10 Charges for Services 62,822 64,079 65,360 66,667 68,001   11 Fines & Forfeits 8,170 8,334 8,500 8,670 8,844   12 Interest Earnings 13,035 13,231 13,429 13,631 13,835   13 Miscellaneous Revenues     14 Total Revenue 2,426,044 2,497,475 2,571,049 2,601,831 2,679,885   EXPENSES        16 General Government 744,370 766,701 789,702 813,393 837,795   17 Public Safety  584,273 601,801 619,855 638,451 657,604   18 Public Works  849,458 874,942 901,190 928,226 956,073   19 Park and Recreation  202,943 209,031 215,302 221,761 228,414   20 Capital Outlay 21 Total Expenses 22 Revenues Over / (Under) Expenses OTHER FINANCING SOURCES / (USES) 23 Transfers In      2,381,044 2,452,475 2,526,049 2,601,831 2,679,885    45,000 45,000 45,000 - -    - - - - -   25 Sale of Fixed Assets  -    -   26 Bond Proceeds  - - - - -   27 Transfer in    28 Transfers Out - - - - -   29 Total Other Sources / (Uses) (45,000) (45,000) (45,000) - -   30 Prior Period Adjustments        31 Ending General Fund Balance (FB) 1,434,213 1,479,213 1,524,213 1,524,213 1,524,213   33 Unassigned  1,434,213 1,479,213 1,524,213 1,524,213 1,524,213   34 Fund Balance as a % of Next Year's Expenditures (net of contingency)  58.5% 58.6% 58.6% 58.6% 55.2%    This proposal includes the cost of a second summer seasonal worker. Funding includes cost of 2 summer seasonal worker + additional work cost of $15,900. Total Increase of budget for salary and wages for 2023, including is $955,700 for a total increase of $108,500 (of that total cost, $39,800 in wages is charged to the utilities.) Note that this budget does not include the costs of a new administrator with family level insurance. Family plans are an additional $13,700. In addition, the following additional costs related to personnel should be considered for addition before the end of the year: $30,000 for 450hr @ $70/hr. of interim administration $28,000 for outgoing administrator severance 16,000 towards Administrator recruitment ($7,000 cost this year) The current budget supports the low end of the compensation range for administrators, per LMC salary survey, but not the top end of 120k. Recommended to add $30,000 for additional salary costs. TOTAL= $105,000 unaccounted for. Council is requested to provide direction on where cuts should come from to account for this unaccounted for cost.  The following general fund budget does not account for administrative transition costs: Overall a 10.5% increase in general operation expenses. Finance & Administration increase 8.5% Proposed increase of legal service expense to $15,000 for possible code enforcement related expenses. Council can consider use of these funds to carryout surveys of City property or towards lobbying expenses for the 2023 legislative session. The 2nd largest increase was $7,600 towards the health insurance. 3nd largest increase of $6,200 is attributable to computer replacement and the addition of an Adobe Acrobat License for Document Alteration. 3rd largest increase is for software support and network maintenance costs for 6,200 these costs include enhancement to online application submission and replacement of computers yet to replaced as part of technology plan. Mayor/Legislative Budget reduced by 9.1% a difference of $2,100 in reduction in travel in conference expense due to limited use. (Funds can be drawn from the administrative budget if needed for more members attending LMC.) Elections down 86.2% by $6,600 due to lack of a 2023 election Planning and Building up 12.3% for a difference of $21,100. The change is attributable to a $22,000 increase in planning services expenses in event of a change in contractor. Depending of the City has Administration carryout minor plan review and project consults, this may be a reasonable cost estimate.  No changes expected for Assessor costs in 2023 Police Services contract is up by 12 percent from last year. An increase of $18,100. Fire/EMS Department Total budget Besides wage increases previously mentioned, this budget proposal includes $20,400 for the new wage adjustment +31,800 towards call volume increases for fire fighters. This plus the step wage increase for the Fire Chief accounts for most of this department’s budget increase for a total difference of $52,200. See Chief Hinz’s attached Memorandum for more details on this proposal. The department’s total increase was $49,810 for 17.8% increase over PY  Animal Control $1,000 increase due to average increase in activity and cost. Public Works DPW has total proposed budget increase over PY of 7.5% or 51,260 Wages increase of $9,400 and a $17,300 increase in health insurance were among the largest increases. Health insurance increase of $3,600 (Anticipated decrease expected for PEIP Non- union premiums.) $3,500 to replace dated garage door openers. $7500 added to road maintenance and repair budget. Parks & Recreation has a proposed 17.6% increase for a difference of $16,720 over PY $11,100 incudes 2nd parks seasonal worker. Increase in recreational events budget 5,000.  Community Center has a proposed 7.4% increase for a difference of $5,440 over PY An additional $4,000 for repairs and maintenance accounts for most of this increase. Transfers Out – There are no proposed budgeted transfers out. EDA Reduced budget from 10,175 to $5,300 Cable TV reduced its budget by $2650 when compared to PY Summary of Projected Capital Borrowing vs. Total Capital Costs Bonding Summary 2023 2024 2025 2026 2027  Local Road Improvement* - 1,906,000 - - 4,600,000  Park Capital - - - - -  Capital Improvement - - - - -  Big Marine Sewer - - 100,500 100,500 184,300  Equipment Replacement 816,500 - 950,000 470,000 600,000  Uptown Sewer   Total 816,500 1,906,000 1,050,500 570,500 5,384,300   Capital Outlay Summary 2023 2024 2025 2026 2027  Local Road Improvement 993,000 881,504 913,390 - 1,490,400  Park Capital 17,306 189,621 143,027 73,648 248,161  Capital Improvement 647,000 377,704 359,224 11,699 0  Big Marine Sewer (No Aid) 9,750 919,750 406,819 511,908 571,607  Equipment Replacement 514,500 497,190 894,357 334,580 607,353  Upown Sewer 15,700 39,800 54,800 86,600 81,900  Total 2,197,256 2,905,569 2,771,616 1,018,433 2,999,421  * Proposed to package road improvements for 3 years into one bond issuance. City of Scandia Financial Management Plan Presented 11/22/2022 Summary of Projected Capital Borrowing vs. Total Capital Costs     Proposed to package road improve percent of capital bonded 44% Proposed to package road improvements for 3 years into one bond issuance. CITY OF SCANDIA Capital Improvement Plan Capital Improvement Fund 401 Inflation Assumptions 1 Revenue (Non-property tax) 0.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2 Interest Earnings 0.00% 1.50% 1.50% 1.50% 1.50% 1.50% 3 Expenses 0.00% 3.00% 3.00% 3.00% 3.00% 3.00% 4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00% REVENUE 2022 Budget 2023 2024 2025 2026 2027 Projected Property taxes 217,336 Intergovernmental - Capital Improvement Debt Levy Special assessments 510 Investment Income 4,500 Refunds and Reimbursements Park Dedication Fees Rental and lease income - Miscellaneous Revenue 409,291 - 2,300 - - 373,375 404,829 426,397 62,346 - - - - - - - - - 1,930 1,894 2,606 8,866 - - - - - - - - Total Revenue 222,346 411,591 375,305 406,723 429,003 71,212 EXPENSES Total Current - Payables internet - Debt service - Total Capital Projects 446,358  - - - 647,000  - - - - - - - - - - - - 377,704 359,224 11,699 - Total Expenses 446,358 647,000 377,704 359,224 11,699 - Revenue Over / (Under) Expenses (224,012) (235,409) (2,399) 47,499 417,304 71,212 OTHER FINANCING SOURCES / (USES) Bond Proceeds  Transfers In  Transfers Out to Sewer Fund  Transfers Out- Total Other Sources / (Uses) accounts payable Prior Period Adjustments Ending Fund Balance  364,064  128,654  126,255 173,754 591,058 662,270 CITY OF SCANDIA Capital Improvement Plan Capital Improvement Fund 401 4 CIP Inflation Factor 4.00% 4.00% 4.00% 4.00% 4.00%   2028 2029 2030 2031 2032      CASH FLOW ANALYSIS  REVENUE    5 Property taxes  30,000 67,811 84,678 84,678 84,678   6 Intergovernmental  - - - - -   7 Capital Improvement Debt Levy  - - - - -   8 Special assessments  - - - - -   9 Investment Income  9,934 10,533 11,708 8,351 7,198   10 Refunds and Reimbursements    11 Park Dedication Fees    12 Rental and lease income  - - - - -   13 Miscellaneous Revenue Total Revenue EXPENSES - - - - -   14  39,934 78,344 96,386 93,029 91,876   15 Total Current  - - - - -   16 Payables internet  - - - - -   17 Debt service  - - - - -    18 Total Capital Projects  - - 320,207 169,859 618,083   19 Total Expenses  - - 320,207 169,859 618,083   20 Revenue Over / (Under) Expenses  39,934 78,344 (223,821) (76,831) (526,208)   OTHER FINANCING SOURCES / (USES)         21 Bond Proceeds 750,001   22 Transfers In  - - - - -   23 Transfers Out to Sewer Fund    24 Transfers Out- Total Other Sources / (Uses) accounts payable Prior Period Adjustments     25  - - - - 750,001         26      27 Ending Fund Balance  702,204 780,548 556,727 479,897 703,690   CITY OF SCANDIA Capital Improvement Plan Capital Improvement Fund 401 Inflation Assumptions 1 Revenue (Non-property tax) 0.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2 Interest Earnings 0.00% 1.50% 1.50% 1.50% 1.50% 1.50% 3 Expenses 0.00% 3.00% 3.00% 3.00% 3.00% 3.00% 4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00% REVENUE 2022 Budget 2023 2024 2025 2026 2027 Projected Property taxes 217,336 Intergovernmental - Capital Improvement Debt Levy Special assessments 510 Investment Income 4,500 Refunds and Reimbursements Park Dedication Fees Rental and lease income - Miscellaneous Revenue 409,291 - 2,300 - - 373,375 404,829 426,397 62,346 - - - - - - - - - 1,930 1,894 2,606 8,866 - - - - - - - - Total Revenue 222,346 411,591 375,305 406,723 429,003 71,212 EXPENSES Total Current - Payables internet - Debt service - Total Capital Projects 446,358  - - - 647,000  - - - - - - - - - - - - 377,704 359,224 11,699 - Total Expenses 446,358 647,000 377,704 359,224 11,699 - Revenue Over / (Under) Expenses (224,012) (235,409) (2,399) 47,499 417,304 71,212 OTHER FINANCING SOURCES / (USES) Bond Proceeds  Transfers In  Transfers Out to Sewer Fund  Transfers Out- Total Other Sources / (Uses) accounts payable Prior Period Adjustments Ending Fund Balance  364,064  128,654  126,255 173,754 591,058 662,270 CITY OF SCANDIA Financial Management Plan Capital Improvement Fund 401 4 CIP Inflation Factor 4.00% 4.00% 4.00% 4.00% 4.00%   2028 2029 2030 2031 2032      CASH FLOW ANALYSIS  REVENUE    5 Property taxes  30,000 67,811 84,678 84,678 84,678   6 Intergovernmental  - - - - -   7 Capital Improvement Debt Levy  - - - - -   8 Special assessments  - - - - -   9 Investment Income  9,934 10,533 11,708 8,351 7,198   10 Refunds and Reimbursements    11 Park Dedication Fees    12 Rental and lease income  - - - - -   13 Miscellaneous Revenue Total Revenue EXPENSES - - - - -   14  39,934 78,344 96,386 93,029 91,876   15 Total Current  - - - - -   16 Payables internet  - - - - -   17 Debt service  - - - - -    18 Total Capital Projects  - - 320,207 169,859 618,083   19 Total Expenses  - - 320,207 169,859 618,083   20 Revenue Over / (Under) Expenses  39,934 78,344 (223,821) (76,831) (526,208)   OTHER FINANCING SOURCES / (USES)         21 Bond Proceeds 750,001   22 Transfers In  - - - - -   23 Transfers Out to Sewer Fund    24 Transfers Out- Total Other Sources / (Uses) accounts payable Prior Period Adjustments     25  - - - - 750,001         26      27 Ending Fund Balance  702,204 780,548 556,727 479,897 703,690   CITY OF SCANDIA Capital Improvement Plan Capital Improvement Fund 401 Inflation Assumptions 4 CIP Inflation Factor   0.00% 0.00% 4.00% 4.00% 4.00% 4.00%    Project 2022 2022 2023 2024 2025 2026 2027    Capital Project Name Year Costs Budget Projected   48 2010 Fire Radios Replace 3 unspupported radios 2030 17548 - - - - -  -   49 2010 Homatro Cutter Twin Line R-1(Jaws of Life) 2030 40945 - - - - -  -   50 2015 Lucas CPR Device-replacement 2030 17548 - - - - -  -   51 Cold Storage Building 2030 81890 - - - - -  -   52 Additional Comm Cent Elec Locks 2030 17548 - - - - -  -  la 53 Large Hall and Heritage Room Carpeting 2030 58493 - - - - -  -    54 2000 Station Bay floor epoxy coating-maintenance  2031  21900  -  -  -  -  -   -   55 2010 Washer/Extractor-replacement 2031 9125 - - - - -  -   56 2012 UTV & Trailer replacement-off road rescue 2031 42583 - - - - -  -  pital  57 2017 Thermal Imaging Cameras (1of3) find hot spots  2031  9733  -  -  -  -  -   -  Ca 58 Zoll Monitor/Defib 2031 36000 - - - - -  -   59 Second Fire Station 2032 227757 - - - - -  -   60 Community Center Design & Planning 2032 189798 - - - - -  -   61 Air Containment Unit 2033 10527 - - - - -  -   62 Community Center Improvements 2033 1000000 - - - - -  -   63 CIP placeholder 2035 75000 - - - - -  -   64 Total Capital Projects  4,757,273 446,358 647,000 377,704 359,224 11,699  -   CITY OF SCANDIA Capital Improvement Plan Capital Improvement Fund 401 Inflation Assumptions 4 CIP Inflation Factor 4.00% 4.00% 4.00% 4.00% 4.00%    Project 2022 2028  2029  2030 2031 2032   Capital Project Name Year Costs     48 2010 Fire Radios Replace 3 unspupported radios 2030 17548  -  - 24,016 - -   49 2010 Homatro Cutter Twin Line R-1(Jaws of Life) 2030 40945  -  - 56,036 - -   50 2015 Lucas CPR Device-replacement 2030 17548  -  - 24,016 - -   51 Cold Storage Building 2030 81890  -  - 112,072 - -   52 Additional Comm Cent Elec Locks 2030 17548  -  - 24,016 - -  la 53 Large Hall and Heritage Room Carpeting 2030 58493  -  - 80,052 - -    54 2000 Station Bay floor epoxy coating-maintenance  2031  21900   -   -  -  31,171  -   55 2010 Washer/Extractor-replacement 2031 9125  -  - - 12,988 -   56 2012 UTV & Trailer replacement-off road rescue 2031 42583  -  - - 60,609 -  pital 2017 Thermal Imaging Cameras (1of3) find hot 57 spots  2031  9733   -   -  -  13,853  -  Ca 58 Zoll Monitor/Defib 2031 36000  -  - - 51,239 -   59 Second Fire Station 2032 227757  -  - - - 337,136   60 Community Center Design & Planning 2032 189798  -  - - - 280,947   61 Air Containment Unit 2033 10527  -  - - - -   62 Community Center Improvements 2033 1000000  -  - - - -   63 CIP placeholder 2035 75000  -  - - - -   64 Total Capital Projects  4,757,273  -  - 320,207 169,859 618,083    Inflation Assumptions CITY OF SCANDIA Financial Management Plan Park Capital Improvement Fund 404  Inflation Assumptions CITY OF SCANDIA Capital Improvement Plan Park Capital Improvement Fund 404 CITY OF SCANDIA Financial Management Plan Equipment Replacement Fund 406 Inflation Assumptions 1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%   2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50% 1.50%   3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%   4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%   2022 2023 2024 2025 2026 2027    Budget Projected  CASH FLOW ANALYSIS  5 REVENUE Property taxes  87,800  -  64,000  145,000  100,000  22,153   6 Debt service levy  100,505 100,505 217,442 275,295   7 Intergovernmental - - - - - -   8 Sale of capital assets 35,000  - - -   9 Investment Income 1,015 1,030 1,045 1,061 1,077 1,093   10 Refunds and Reimbursements     11 Park Dedication Fees     12 Rental and lease income - - - - - -   13 Miscellaneous Revenue Total Revenue EXPENSES Total Current - - - - - -   14  88,815 36,030 165,550 246,566 318,519 298,541    15    -  -  -  -  -   16 Debt service - - 95,719 95,719 207,088 262,186   17 Total Capital Projects 198,500 514,500 497,190 894,357 334,580 607,353   18 Total Expenses 198,500 514,500 592,909 990,076 541,667 869,539    19 Revenue Over / (Under) Expenses OTHER FINANCING SOURCES / (USES) Bond Proceeds  (109,685)  (478,470)  (427,359)  (743,510)  (223,148)  (570,998)    20    816,500   950,000  470,000  600,000   21 Transfers In     22 Transfers Out     23 Transfers Out- Total Other Sources / (Uses) Prior Period Adjustments      24  - 816,500 - 950,000 470,000 600,000    25       26 Ending Fund Balance 206,748 544,778 117,419 323,909 570,761 599,763   CITY OF SCANDIA Financial Management Plan Equipment Replacement Fund 406  2028 2029 2030 2031 2032       CASH FLOW ANALYSIS  5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 REVENUE Property taxes 47,048 30,817 - -  75,001    Debt service levy 349,151 349,151 398,387 471,012 471,012    Intergovernmental - - - - -    Sale of capital assets - - - - -    Investment Income 1,109 1,126 1,143 1,160 1,177    Refunds and Reimbursements     Park Dedication Fees     Rental and lease income - - - - -    Miscellaneous Revenue Total Revenue EXPENSES Total Current - - - - -     397,308 381,094 399,530 472,172 - - - - 547,190 -    Debt service 332,524 332,524 379,417 448,583 448,583    Total Capital Projects 57,901 550,165 449,767 91,775 -    Total Expenses 390,425 882,689 829,183 540,358 6,882 (501,596) (429,653) (68,186) 400,000 590,000 448,583 98,607 300,001    Revenue Over / (Under) Expenses OTHER FINANCING SOURCES / (USES) Bond Proceeds      Transfers In     Transfers Out      Transfers Out- Total Other Sources / (Uses) Prior Period Adjustments       - 400,000 590,000 - 300,001         26 Ending Fund Balance 606,645 505,049 665,397 597,211 995,819    Inflation Assumptions CITY OF SCANDIA Capital Equipment Fund 406 Capital Improvement Plan 4 CIP Inflation Factor    0.00% 0.00% 4.00% 4.00% 4.00%    Project  2021 2022 2023 2024 2025 2026   Capital Project Name First Year  Costs Budget Projected   27 312-08 Asphalt Patching Equipment Trailer (2008) 2025 39000  - - - 45,624 -   28 2000 Engine 1 - 5176 Replacement 2025 650000  - - - 760,408 -   29 2003 Tanker 5178 Tender 2 Replacement 2024 292000  - - 328,460 - -   30 201-14 Mack Single Axle w/Plow (2014) 2026 275000  - - - - 334,580   31 202-17 Western Star Single Axle Truck/Plow (2017) 2029 350000  - - - - -   32 203-11 Mack Dump Truck/Plow Replacement (2011) 2023 325000  - 325,000 - - -   33 301-98 John Deere Motor Grader (1998) 2027 480000  - - - - -   34 302-22 JD-6410 Tractor w/flail attachments (2022) 2022 198500  198,500 - - - -   35 308-12 New Holland Skit Steer (2012) 2024 65000  - - 73,116 - -  O 36 Motor Grader 2022 0  - - - - -  ent 37 2022 0  - - - - -   37 101-18 Chev 1/2 ton pickup (2018) 2028 44000  - - - - -   38 102-19 Dodge 3500 SRW w/plow (2019) 2029 52000  - - - - -  Eq 39 103-21 Dodge 2500 w/plow (2021) 2031 62000  - - - - -  tal 40 104-13 Ford F550 w/sander, plow mount, compressor 2024 75000  - - 84,365 - -  api 41 1995 Utility 1misc purpose truck - replacement 2023 86500  - 86,500 - - -  C 42 2003 Boat & Trailer - water rescues 2023 38000  - 38,000 - - -   43 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2023 65000  - 65,000 - - -   44 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2030 75000  - - - - -   45 304-21 Kubota UTV (2021) 2030 16000  - - - - -   46 Addition Vehicle (truck for addl FT or PT staff) 2025 50500  - - - 59,078 -   47 Equipment Attachments (fit skid, loader, tractor) 2024 10000  - - 11,249 - -   48 PJ Skid Trailer 14,000 lbs (2012) 2025 17000  - - - 19,888 -   49 Rescue 5179 Replacement 2030 225000  - - - - -   50 Utility Trailer 3,500 lbs (1998) 2025 8000  - - - 9,359 -   52 Total Capital Projects   3,498,500 198,500 514,500 497,190 894,357 334,580   CITY OF SCANDIA Capital Equipment Fund 406 Capital Improvement Plan Inflation Assumptions 4 CIP Inflation Factor  4.00%  Capital Project Name Project First Year  2021 Costs 2027          27 312-08 Asphalt Patching Equipment Trailer (2008) 2025 39000  -   28 2000 Engine 1 - 5176 Replacement 2025 650000  -   29 2003 Tanker 5178 Tender 2 Replacement 2024 292000  -   30 201-14 Mack Single Axle w/Plow (2014) 2026 275000  -   31 202-17 Western Star Single Axle Truck/Plow (2017) 2029 350000  -   32 203-11 Mack Dump Truck/Plow Replacement (2011) 2023 325000  -   33 301-98 John Deere Motor Grader (1998) 2027 480000  607,353   34 302-22 JD-6410 Tractor w/flail attachments (2022) 2022 198500  -   35 308-12 New Holland Skit Steer (2012) 2024 65000  -  O 36 Motor Grader 2022 0  -  ent 37 2022 0  -   37 101-18 Chev 1/2 ton pickup (2018) 2028 44000  -   38 102-19 Dodge 3500 SRW w/plow (2019) 2029 52000  -  Eq 39 103-21 Dodge 2500 w/plow (2021) 2031 62000  -  tal 40 104-13 Ford F550 w/sander, plow mount, compressor 2024 75000  -  api 41 1995 Utility 1misc purpose truck - replacement 2023 86500  -  C 42 2003 Boat & Trailer - water rescues 2023 38000  -   43 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2023 65000  -   44 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2030 75000  -   45 304-21 Kubota UTV (2021) 2030 16000  -   46 Addition Vehicle (truck for addl FT or PT staff) 2025 50500  -   47 Equipment Attachments (fit skid, loader, tractor) 2024 10000  -   48 PJ Skid Trailer 14,000 lbs (2012) 2025 17000  -   49 Rescue 5179 Replacement 2030 225000  -   50 Utility Trailer 3,500 lbs (1998) 2025 8000  -   52 Total Capital Projects   3,498,500 607,353    Inflation Assumptions 4 CIP Inflation Factor CITY OF SCANDIA Capital Equipment Fund 406 Capital Improvement Plan 4.00% 4.00% 4.00% 4.00% 4.00%  Capital Project Name Project  2021 Costs 2028 2029 2030 2031 2032    First Year       27 312-08 Asphalt Patching Equipment Trailer (2008) 2025 39000  - - - - -   28 2000 Engine 1 - 5176 Replacement 2025 650000  - - - - -   29 2003 Tanker 5178 Tender 2 Replacement 2024 292000  - - - - -   30 201-14 Mack Single Axle w/Plow (2014) 2026 275000  - - - - -   31 202-17 Western Star Single Axle Truck/Plow (2017) 2029 350000  - 478,999 - - -   32 203-11 Mack Dump Truck/Plow Replacement (2011) 2023 325000  - - - - -   33 301-98 John Deere Motor Grader (1998) 2027 480000  - - - - -   34 302-22 JD-6410 Tractor w/flail attachments (2022) 2022 198500  - - - - -   35 308-12 New Holland Skit Steer (2012) 2024 65000  - - - - -  O 36 Motor Grader 2022 0  - - - - -  ent 37 2022 0  - - - - -   37 101-18 Chev 1/2 ton pickup (2018) 2028 44000  57,901 - - - -   38 102-19 Dodge 3500 SRW w/plow (2019) 2029 52000  - 71,166 - - -  Eq 39 103-21 Dodge 2500 w/plow (2021) 2031 62000  - - - 91,775 -  tal 40 104-13 Ford F550 w/sander, plow mount, compressor 2024 75000  - - - - -  api 41 1995 Utility 1misc purpose truck - replacement 2023 86500  - - - - -  C 42 2003 Boat & Trailer - water rescues 2023 38000  - - - - -   43 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2023 65000  - - - - -   44 303-17 Kubota F39000 Mower w/Broom & Blower (2017) 2030 75000  - - 106,748 - -   45 304-21 Kubota UTV (2021) 2030 16000  - - 22,773 - -   46 Addition Vehicle (truck for addl FT or PT staff) 2025 50500  - - - - -   47 Equipment Attachments (fit skid, loader, tractor) 2024 10000  - - - - -   48 PJ Skid Trailer 14,000 lbs (2012) 2025 17000  - - - - -   49 Rescue 5179 Replacement 2030 225000  - - 320,245 - -   50 Utility Trailer 3,500 lbs (1998) 2025 8000  - - - - -   52 Total Capital Projects   3,498,500 57,901 550,165 449,767 91,775 -   CITY OF SCANDIA Financial Management Plan Local Road Improvement Fund 408 Inflation Assumptions 1 Revenue (Non-property tax) 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2 Interest Earnings 1.50% 1.50% 1.50% 1.50% 1.50% 1.50% 3 Expenses 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00% 2022 2023 2024 2025 2026 2027 Budget Proposed REVENUE Property taxes 216,860 Debt levy - Special assessments Investment Income 19,613 Refunds and Reimbursements Intergovermental Rental and lease income - Miscellaneous Revenue -  212,012 - 12,115 6,900 - -  396,785 196,691 100,000 90,000 192,810 192,810 192,810 658,143 685 25,011 14,877 16,841 6,900 6,900 6,900 6,900 - - - - - - - - Total Revenue 236,473 231,027 597,181 421,411 314,586 771,883 EXPENSES Total Current Debt service Principal  - - - - - - - - 183,628 183,628 183,628 17 Interest     18 Total Capital Projects 707,200 993,000 881,504 913,390 - 1,490,400  19 Total Expenses 707,200 993,000 881,504 1,097,018 183,628 1,674,028  20 Revenue Over / (Under) Expens (470,727) (761,973) (284,323) (675,607) 130,958 (902,145)   OTHER FINANCING SOURCES / (USES)  21 Bond Proceeds 1,906,000 4,600,000  22 Bond premium    23 Transfers In - - - - - -  Transfers Out Transfers Out-       26 Total Other Sources / (Uses) - - 1,906,000 - - 4,600,000  Prior Period Adjustments Ending Fund Balance 807,673 45,700 1,667,376 991,770 1,122,728 4,820,583    Inflation Assumptions Revenue (Non-property tax) Interest Earnings Expenses CIP Inflation Factor REVENUE Property taxes Debt levy Special assessments Investment Income Refunds and Reimbursements Intergovermental Rental and lease income Miscellaneous Revenue Total Revenue EXPENSES Total Current Debt service Principal Interest Total Capital Projects Total Expenses Revenue Over / (Under) Expens OTHER FINANCING SOURCES Bond Proceeds Bond premium Transfers In Transfers Out Transfers Out- Total Other Sources / (Uses) Prior Period Adjustments Ending Fund Balance CITY OF SCANDIA Financial Management Plan LOCAL ROAD IMPROVEMENT FUND 408 2.00% 2.00% 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 4.00% 4.00% 4.00% 4.00% 2028 2029 2030 2031 2032 141,811 100,011 96,497 74,256 300,000 658,143 658,143 658,143 1,113,360 1,113,360 72,309 58,577 41,396 26,384 84,007 6,900 6,900 6,900 6,900 6,900 - - - - - - - - - - 879,163 823,631 802,936 1,220,900 1,504,268 - - - - - 626,803 626,803 626,803 626,803 1,060,343 1,167,783 1,342,250 1,176,969 1,252,514 1,480,244 1,794,586 1,969,053 1,803,772 1,879,317 2,540,587 (915,423) (1,145,422) (1,000,836) (658,418) (1,036,320) 4,500,000 - - - - - - - - 4,500,000 - 3,905,159 2,759,738 1,758,902 5,600,484 4,564,164  2.00% 1.50% 3.00% 4.00% 2033 200,000 1,113,360 68,462 6,900 - - 1,388,723 - 1,060,343 1,539,454 2,599,797 (1,211,074) - - 3,353,090 CITY OF SCANDIA Capital Improvement Plan Local Road Improvement Fund 408 Inflation Assumptions 4 CIP Inflation Factor 0.00% 0.00% 4.00% 4.00% 4.00% 4.00%    Project  2022 2023 2024 2025 2026  2027   Capital Project Name First Year Costs Budget Proposed Est.      Local Road Project Outlay 29 Soil Borings for 2024 & 2025 2023 20000 - 20,000 - -  - -   30 Soil Borings for 2026 & 2027 2025 20000 - - - 22,497  - -   31 Soil Borings for 2028 & 2029 2027 20000 - - - -  - 24,333   32 Soil Borings for 2030 & 2031 2029 20000 - - - -  - -   33 2022 Local Road Improvement Project 2022 707200 707,200 - - -  - -   34 2023 Local Road Improvement Project 2023 790000 - 790,000 - -  - -   35 2023 Seal Coat & Crack Filling Project 2023 183000 - 183,000 - -  - -   36 2024 Local Road Improvement Project 2024 815000 - - 881,504 -  - -   37 2025 Local Road Improvement Project 2025 540000 - - - 607,427  - -   38 2025 Seal Coat & Crack Filling 2025 252000 - - - 283,466  - -   39 2026 Local Road Improvement Project 2027 870000 - - - -  - 1,058,488   40 2026 Seal Coat & Crack Filling Project 2027 335000 - - - -  - 407,579   41 2027 Local Road Improvement Project 2028 900000 - - - -  - -   42 2027 Seal Coat & Crack Filling 2028 78000 - - - -  - -   43 2028 Local Road Improvement Project 2029 1000000 - - - -  - -   44 2029 Local Road Improvement Project 2030 860000 - - - -  - -   45 2028 Local Road Improvement Project 2031 880000 - - - -  - -   46 CIP Placeholder 2032 1000000 - - - -  - -   47 Total Capital Projects  9,290,200 707,200 993,000 881,504 913,390  - 1,490,400   CITY OF SCANDIA Capital Improvement Plan Local Road Improvement Fund 408 Inflation Assumptions 4 CIP Inflation Factor 3.00% 4.00% 4.00% 4.00% 4.00%  4.00%    Capital Project Name Project  First Year  Costs 2028 2029 2030 2031 2032 2033         Local Road Project Outlay 29 Soil Borings for 2024 & 2025 2023 20000 - - - - - -   30 Soil Borings for 2026 & 2027 2025 20000 - - - - - -   31 Soil Borings for 2028 & 2029 2027 20000 - - - - - -   32 Soil Borings for 2030 & 2031 2029 20000 - 26,319 - - - -   33 2022 Local Road Improvement Project 2022 707200 - - - - - -   34 2023 Local Road Improvement Project 2023 790000 - - - - - -   35 2023 Seal Coat & Crack Filling Project 2023 183000 - - - - - -   36 2024 Local Road Improvement Project 2024 815000 - - - - - -   37 2025 Local Road Improvement Project 2025 540000 - - - - - -   38 2025 Seal Coat & Crack Filling 2025 252000 - - - - - -   39 2026 Local Road Improvement Project 2027 870000 - - - - - -   40 2026 Seal Coat & Crack Filling Project 2027 335000 - - - - - -   41 2027 Local Road Improvement Project 2028 900000 1,074,647 - - - - -   42 2027 Seal Coat & Crack Filling 2028 78000 93,136 - - - - -   43 2028 Local Road Improvement Project 2029 1000000 - 1,315,932 - - - -   44 2029 Local Road Improvement Project 2030 860000 - - 1,176,969 - - -   45 2028 Local Road Improvement Project 2031 880000 - - - 1,252,514 - -   46 CIP Placeholder 2032 1000000 - - - - 1,480,244 1,539,454   47 Total Capital Projects  9,290,200 1,167,783 1,342,250 1,176,969 1,252,514 1,480,244 1,539,454   2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 101 - GENERAL FUND Revenues  R 101-31000 Washington Cty. Tax Settlement  1,266,589  1,583,000  -  1,755,418  10.9%  Total General Fund Tax Levy  R 101-31040 Fiscal Disparities  124,112  -  -  -    estimate of equalization of disparities distributed by the State from the area wide mill ra  R 101-31701 Gravel Taxes  27,751  20,000  -  20,000  0.0%  Aggregate Material Removal; Production Tax (set by County Board  R 101-31830 Solar Energy Production Tax  6,965  5,000  -  6,000  20.0%  Share set by State of MN  R 101-31900 Penalties & Interest Delinquent Tax  2,475  400  -  400  0.0%  Outstanding Property Tax with Interest  R 101-32150 Utility Permits  6,450  3,000  2,250  3,000  0.0%  Right-of-Way or Work in the Road permit fee revenues $150 per permit  R 101-32180 Tobacco and Liquor Licenses  12,585  8,500  422  10,000  17.6%  Estimated Liquor and Tobacco Licenses without special events  R 101-32190 Other City Permits  2,959  3,000  1,690  3,000  0.0%  (Zoning, Grading, special events, driveways)  R 101-32210 Building Permits  196,155  135,000  71,624  145,000  7.4%  As of mid year at 53%  R 101-32260 Gambling Permits  130  -  115  100    Anticipating diminished gambling permits in 2021 due to Covid-19  R 101-33401 LGA/MVHC/AG/PERA Aid  6,853  13,200  -  7,000  -47.0%  Anticipating similar aid from 2019  R 101-33420 Fire Relief State PERA  39,178  39,600  -  37,000  -6.6%  Anticipating similar aid from 2019  R 101-33422 Other State Grants & Aids  10,763  5,400  -  11,000  103.7%  Fire Fighter Training Reimbursement  R 101-33428 Payments In Lue of Taxes (PILT)  6,086  6,000  -  6,000  0.0%  Compensation from the state for loss of tax base from state owned land  R 101-33620 Recycling Grant  13,062  9,000  13,188  10,500  16.7%  County Recycling Grant  R 101-33630 Local Govt Grants & Aids  -  -  -  -    No anticipated 2021 County Grants  R 101-33640 Other Grants  724  1,000  -  1,200  20.0%  Previously anticipated obtaining grants for turnout gear  R 101-34102 Legal Services  -  -  -  -    To Eliminate Line- Formerly Expense related to legal services for permit review  R 101-34103 Zoning and Planning  12,736  4,300  2,350  6,700  55.8%  Zoning Permit Fees  R 101-34106 Engineering Fees  1,299  -  -  500    To Eliminate Line- Formerly Expense related to recording services for permit review  R 101-34107 Assessment Search Fees  20  100  20  -  -100.0%  $20 per search required at property closing  R 101-34109 Water Usage  140  200  -  100  -50.0%  Revenue for Uptown City-Owned Well (ELEM and Gammelgarden)  R 101-34201 Impound Fees  -  -  -  -    Collected fees for Dog Impoundment  R 101-34202 Fire Protection Services  30,710  31,493  31,493  34,300  8.9%  Contract Revenue from service agreement with May Township  R 101-34301 Restitution  24,432  -  -  -    Line used for Receipt of refunds to Damage to Property  R 101-34303 Dust Control  2,666  2,400  3,180  2,700  12.5%  Payment received each year for dust control at Cedar Cliff  R 101-34304 Reimbursement for Services  5,400  3,600  1,800  3,000  -16.7%  Reimbursement for Accounting Services for Forest Lake Cable Commission  R 101-34740 Coffee Sales  -  -  -  -  0.0%  N/A  R 101-34750 Facilities Rental  6,808  5,000  6,012  5,500  10.0%  Comm. Ctr. Hall Rental, Annex Rental, and Hay Lake Shelter Rental (anticipate 1/4 reve  R 101-34760 Cleaning Fees  100  200  -  100  -50.0%  Claimed cleaning deposits on facilities rentals   2023 Draft Proposed Line-Item Budget Detail Ty  Code  Description  Actual 2021  Budget 2022  Actual 6/30/2022  Proposed 2023   % Bud Diff   Notes and Descriptions  R 101-34790 Recreation Programs  1,125  1,000  1,400  2,100  110.0%  Fee Revenues from Rec Programming (Yoga/Ice Skating)  R 101-34950 Solar Subscription  -  -  -  1,900    Revenue from City-owned solar installations  R 101-35101 Fines & Forfeitures  6,899  7,000  3,295  7,400  5.7%  Fine revenue from State Courts and Administrative Citations  R 101-35201 Forfeited Land Sales  -  -  -  -    Proceeds from City-owned land sales allocated to the General Fund  R 101-36210 Interest Income  3,133  15,900  3,925  12,100  -23.9%  Allocation of interest earnings on interest bearing accounts and investments  R 101-36230 Donations  8,936  1,500  2,841  2,000  33.3%  Typically Vinterfest Donations, Fire Relief Donations, Park Donations  R 101-36240 Insurance Dividend  7,281  2,000  -  4,100  105.0%  Yearly dividend from LMCITT for City's share of ownership  R 101-36250 Misc. Refund  2,769  2,500  150  3,800  52.0%  Misc. Revenue from records requests, Canidate filling fees, etc.  R 101-39200 Interfund Transfer  -  -  -  -    Transfers In from Other City Funds ($1440 Ballfield maintenance from Park Fund)                  TOTAL FUND 101 GENERAL FUND REVENUE 1,837,292 1,909,293 145,755 2,101,918 10.1%  DEPT. 41000 FINANCE AND ADMINISTRATION  E 101-41000-101 Regular Wages & Salaries  171,309  162,600  64,512    Estimated Salaries based on approved 2019 Wage Study Scale  E 101-41000-121 PERA Coord. Employer Contribu.  12,676  12,000   4,828    Estimated based on adjusted employee earnings  E 101-41000-122 FICA Employer Contribution  10,975  10,100   2,970    "  E 101-41000-126 MEDICARE Employer Contribution  2,643  2,400   1,008    "  E 101-41000-131 Employer Paid Health  31,493  23,600   13,501    Projected 10% change conformation not until the last week of Sept 2022  E 101-41000-132 Dental Insurance  -  2,900   484    "  E 101-41000-134 Employer Paid Life  704  600   240    "  E 101-41000-135 Employer Paid Disability  1,299  1,200   251    Lower due to redistribution of cost share between departments no predicated increase  E 101-41000-151 Worker s Comp Insurance Prem  1,462  1,200   1,729      E 101-41000-200 Office Supplies  1,367  1,000   597 1,100 10.0%    E 101-41000-203 Printed Forms & Papers  1,911  1,800   973  1,900 5.6%    E 101-41000-210 Operating Supplies  108  900   666  800 -11.1%    E 101-41000-301 Auditing and Accounting Services  20,200  20,800   17,200  23,500 13.0%  Schlenner Wenner & Co agreement through 2021 fiscal yr.  E 101-41000-304 Legal Services  46,888  40,000   18,507  55,000 37.5%  Cost of corporation counsel and prosecution services  E 101-41000-306 Personal Testing & Recruit  -  -   -  -     E 101-41000-308 Other Professional Services  1,081  1,000   1,404  1,000 0.0%  Abdo & Ehlers Financial Assistance  E 101-41000-309 Software Support & Maintenance  18,156  12,000   12,154  18,200 51.7%  $3,600-website, $5900 Rolltex Server Maintenance/Tech Support, $800 PlanIt, $3100 L  E 101-41000-313 Committee & Commission Reimbur  -  -   -  -   General Fund Reimbursements to standing committees: PRC, TC, IAC, etc.  E 101-41000-316 Conferences & Seminars  -  800   1,049  700 -12.5%    E 101-41000-317 Employee Training  271  500   -  200 -60.0%     2023 Draft Proposed Line-Item Budget Detail Ty  Code  Description  Actual 2021  Budget 2022  Actual 6/30/2022 Proposed 2023  % Bud Diff   Notes and Descriptions  E 101-41000-319 Other Services  1,309  1,300  74 700 -46.2%  Continuing Disclosure Services, Financial Advising, and Accounting Advising (AEM)  E 101-41000-321 Telephone  4,721  4,500   2,434  3,700 -17.8%    E 101-41000-322 Postage  2,393  2,300   1,066  2,200 -4.3%    E 101-41000-331 Travel Expenses  36  2,500   453  600 -76.0%    E 101-41000-351 Legal Notices Publishing  1,134  2,000   894  1,200 -40.0%  Newspaper Publications for budget, public hearings, and other required postings  E 101-41000-361 Liability/Property Ins  4,628  4,100   4,568 7,100 73.2%    E 101-41000-365 Insurance Claims  -  -   - -     E 101-41000-381 Utilities-Electric & Gas  10,925  12,000   2,781  13,000 8.3%  Increase due to the cost of gas  E 101-41000-413 Equipment Rental  1,953  2,800   860  1,900 -32.1%  Copy and Postage Machine Expenses; new flat bed scanner  E 101-41000-430 Recycling  26,803  27,800   13,923  30,100 8.3%  Per agreement with SRC on Community Recycling  E 101-41000-433 Dues and Subscriptions  5,634  5,900   290  6,100 3.4%  LMC/MN Mayor's Association/ICMA/MCMA/MCFOA/GFOA  E 101-41000-434 Youth Service Bureau  5,500  5,500   5,500  5,500 0.0%  Support for program for rehabilitation of youth offenders dba Lakes Center for Youth & F  E 101-41000-435 Misc Expense  512  -   -  500     E 101-41000-437 Cable TV Franchise  -  -   -  -   Line to be Eliminated. Revenues now go to the Cable TV Fund 226  E 101-41000-438 Misc. Contractual  3,632  3,600   3,562  4,000 11.1%  codification of ordinances  E 101-41000-439 Refunds Issued  159  -   -  -     E 101-41000-560 Furniture and Fixtures  -  -   -  -     E 101-41000-570 Office Equipment  4,709  4,000   2,603  5,500 37.5%  Purchase of computer replacement for office                  TOTAL DEPT. 41000 FINANCE AND ADMINISTRATION 396,590 373,700 181,082 405,500 8.5%       DEPT. 41110 LEGISLATIVE, MAYOR, AND COUNCIL  E 101-41110-101 Regular Wages & Salaries  17,946  18,100  4,486    Mayor and Council  E 101-41110-122 FICA Employer Contribution  212  1,100   106      E 101-41110-126 MEDICARE Employer Contribution  40  300   13      E 101-41110-127 PERA Defined  727  600   139      E 101-41110-151 Worker s Comp Insurance Prem  76  100   -      E 101-41110-308 Other Professional Services  30  -   - -     E 101-41110-316 Conferences & Seminars  -  1,000   398  700 -30.0%    E 101-41110-331 Travel Expenses  -  1,800   -  - -100.0%    E 101-41110-560 Furniture and Fixtures  -  -   -  -     E 101-41110-570 Office Equipment  166  -   -  -      TOTAL DEPT. 41110 LEGISLATIVE, MAYOR, AND COUNCIL 19,195 23,000 5,142 20,900 -9.1%      2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  DEPT. 41410 ELECTIONS  E 101-41410-199 Election Judge  -  4,800  - - -100.0%  No anticipated election in 2023  E 101-41410-200 Office Supplies  -  100   - - -100.0%    E 101-41410-203 Printed Forms & Papers  -  -   -  -     E 101-41410-210 Operating Supplies  -  1,000   -  200 -80.0%    E 101-41410-351 Legal Notices Publishing  -  200   -  - -100.0%    E 101-41410-413 Equipment Rental  1,470  1,500   1,515  850 -43.3%  Equipment maintenance charges from Washington County   TOTAL DEPT. 41410 ELECTIONS 1,470 7,600 1,515 1,050 -86.2% DEPT. 41910 PLANNING AND BUILDING E 101-41910-316 Conferences & Seminars - - - 50 Anticipated no attendance in 2021 due to Covid-19, $50 for APA MN Chapter Members E 101-41910-319 Other Services  -  -   -  -   Previously Comp Plan Update Expense  E 101-41910-361 Liability/Property Ins  756  1,800   2,006 4,900 172.2%    E 101-41910-438 Misc. Contractual  6,069  11,000   2,342 5,000 -54.5%  State Building Permit Surcharges  E 101-41910-439 Refunds Issued  186  -   (573)  200      TOTAL DEPT. 41910 PLANNING AND BUILDING 155,112 171,920 72,749 193,050 12.3%      2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  DEPT. 41960 Assessor E 101-41960-300 Assessor  22,077  21,600  10,878  21,600 0.0%  Assessor contract w/PAUSZEK, INC. (Patrick Poshek)   TOTAL DEPT. 41950 ASSESSOR 22,077 21,600 10,878 21,600 0.0% DEPT. 42100 POLICE SERVICES TOTAL DEPT. 42100 POLICE SERVICES 144,647 150,900 309 168,999 12.0%      DEPT. 42200 FIRE & EMS DEPARTMENT E 101-42200-101 Regular Wages & Salaries 124,411 95,000 52,752     E 101-42200-121 PERA Coord. Employer Contribu. 7,854 9,700 - E 101-42200-124 PERA Public Safety Employer Contribu. - E 101-42200-122 FICA Employer Contribution 5,453 5,900 2,873 E 101-42200-126 MEDICARE Employer Contribution 2,281 1,400 445 E 101-42200-134 Employer Paid Life 192 200 96     E 101-42200-135 Employer Paid Disability - 700 -     E 101-42200-141 Unemployment Compensation - - - - E 101-42200-151 Worker s Comp Insurance Prem 9,948 9,550 12,640 E 101-42200-200 Office Supplies 358 400 -     E 101-42200-203 Printed Forms & Papers 406 150 -     E 101-42200-209 Medical Supplies 1,245 2,500 2,223 E 101-42200-210 Operating Supplies 12,614 8,000 834 E 101-42200-211 Cleaning Supplies 66 100 18 E 101-42200-212 Fuel 3,590 2,500 1,731 E 101-42200-217 Uniforms & Safety Equipment 3,497 10,000 - E 101-42200-221 Equipment Parts 828 3,000 205 E 101-42200-222 Tires - - 1,540 E 101-42200-223 Structure Repair & Supplies 461 5,300 13 E 101-42200-240 Small Tools and Minor Equip 5,755 8,500 8,710 E 101-42200-305 Medical Services 4,357 4,500 5,635 E 101-42200-306 Personal Testing & Recruit 2,025 1,500 903 E 101-42200-309 Software Support & Maintenance 18,531 17,000 5,690 E 101-42200-310 Medical Training 102 11,000 -  SeeChief's memo H " "  "     Inflation      Estimate based on prior years, Inflation  3 set's of turnout gear$6,100, 3 helmets $630, 4 Uniforms for new members$700, 5 set'      New Carpet was supplied & installed for free ESTIMATED $4,000 SAVED  This has SCBA bottles ordered in 2021 due to back order  Annual Fit testing $3400, Medical direction now 0 cost  Hope to recruit 3-5 new members in 2022, medical testing $252 per person  Laserfiche user fee $280/yr., 800Mhz Radios user fee $10,403, Managed IT $6,000, Pa  EMT Refresher now $0 cost, 2023 will be FF 1 & 2 training       2023 Draft Proposed Line-Item Budget Detail Ty  Code  Description  Actual 2021  Budget 2022  Actual 6/30/2022 Proposed 2023  % Bud Diff   Notes and Descriptions  E 101-42200-316 Conferences & Seminars  -  300  - 250 -16.7%    E 101-42200-317 Employee Training  19,663  8,000   (5,930) 15,000 87.5%    E 101-42200-319 Other Services  2,981  500   70 500 0.0%    E 101-42200-321 Telephone  7,561  6,400   3,299 6,800 6.3%    E 101-42200-322 Postage  7  -   - -     E 101-42200-324 State of MN-Fire Relief  39,178  35,300   - 35,300 0.0%    E 101-42200-325 City Match-Fire Relief  -  -   - -     E 101-42200-331 Travel Expenses  50  2,000   - 1,500 -25.0%    E 101-42200-334 Licenses & Permits  175  200   - 200 0.0%    E 101-42200-340 Advertising  -  -   - -     E 101-42200-361 Liability/Property Ins  8,102  6,000   6,685 6,500 8.3%    E 101-42200-381 Utilities-Electric & Gas  2,718  4,000   5,995 8,000 100.0%    E 101-42200-384 Refuse/Garbage Disposal  974  850   508 1,100 29.4%    E 101-42200-385 Sewer Pumping & Maintenance  270  700   300 700 0.0%    E 101-42200-401 Building Maintenance/Repairs  3,722  2,500   1,302 2,500 0.0%    E 101-42200-403 Improvements Other Than Bldgs.  -  -   - -     E 101-42200-404 Repair Machinery/Equipment  13,858  8,000   2,981 8,000 0.0%    E 101-42200-407 Well Repair & Maintenance  -  140   - - -100.0%    E 101-42200-433 Dues and Subscriptions  2,203  2,100   2,350 2,400 14.3%    E 101-42200-438 Misc. Contractual  2,205  4,100   1,605 4,100 0.0%    E 101-42200-440 Events  807  800   - 800 0.0%    E 101-42200-520 Capital Improvements to Bldgs.  -  -   - -     E 101-42200-530 Capital Impr Other Than Bldgs.  -  -   1,178 -     E 101-42200-540 Heavy Machinery Capital  -  -   - -     E 101-42200-560 Furniture and Fixtures  220  500  -  500  0.0%   E 101-42200-570 Office Equipment  928  900  -  900  0.0%                TOTAL DEPT. 42200 FIRE/EMS DEPARTMENT  309,597  280,190  116,650  330,000  17.8%    2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  DEPT 42700 ANIMAL CONTROL E 101-42700-314 Animal Control 4,395 4,000 1,700 5,000 25.0% Officer and Impoundment Costs - Companion Animal Control $150/m retainer TOTAL DEPT. 42700 ANIMAL CONTROL 4,395 4,000 1,700 5,000 25.0% DEPT 43000 PUBLIC WORKS 2023 Draft Proposed Line-Item Budget Detail Ty  Code  Description  Actual 2021  Budget 2022  Actual 6/30/2022 Proposed 2023  % Bud Diff  Notes and Descriptions  E 101-43000-321 Telephone  4,630  4,800  2,206 3,000 -37.5% Drop 2 cell phones and radio  E 101-43000-331 Travel Expenses  583  500   - 500 0.0%   E 101-43000-334 Licenses & Permits  68  500   173 500 0.0%   E 101-43000-361 Liability/Property Ins  14,068  9,300   10,362 9,000 -3.2%   E 101-43000-365 Insurance Claims  -  -   - -    E 101-43000-381 Utilities-Electric & Gas  2,096  3,200   4,142 4,000 25.0%   E 101-43000-384 Refuse/Garbage Disposal  705  900   646 1,000 11.1%   E 101-43000-385 Sewer Pumping & Maintenance  270  800   756 1,600 100.0%   E 101-43000-387 Street Light Utilities  3,689  4,000   2,247 4,200 5.0%   E 101-43000-401 Building Maintenance/Repairs  3,235  5,500   1,226 8,000 45.5%   E 101-43000-403 Improvements Other Than Bldgs.  1,575  -   - -    E 101-43000-404 Repair Machinery/Equipment  33,518  14,000   378 15,500 10.7%   E 101-43000-405 Contractual Road Maint/Repair  44,144  150,000   32,146 157,500 5.0% Large patches, overlays, sealcoating, crack sealing  E 101-43000-407 Well Repair & Maintenance  -  -   - -  RPZ testing, VFD  E 101-43000-413 Equipment Rental  646  3,500   1,304 4,000 14.3% Chipper during winter  E 101-43000-417 Uniform Rental  1,282  1,000   399 1,100 10.0% Cinta's  E 101-43000-433 Dues and Subscriptions  -  200   - 200 0.0%   E 101-43000-438 Misc. Contractual  17,894  15,000   931 15,750 5.0% Crane hoist testing. Pest control, cleaning, unexpected small road project  E 101-43000-439 Refunds Issued  400  -   - -    E 101-43000-530 Capital Impr Other Than Bldgs.  -  -   1,178 -    E 101-43000-550 Motor Vehicles Capital  -  -   - -    E 101-43000-560 Furniture and Fixtures  -  -   - -    E 101-43000-570 Office Equipment  821  3,300   589 1,000 -69.7% New printer, scanner - 11.5 x 17   TOTAL DEPT 43000 PUBLIC WORKS DEPARTMENT 557,563 681,490 278,396 732,750 7.5%      2023 Draft Proposed Line-Item Budget Detail Ty Code  Description Actual 2021 Budget 2022 Actual 6/30/2022 Proposed 2023  % Bud Diff  Notes and Descriptions  DEPT. 45000 PARKS AND RECREATION  E 101-45000-101 Regular Wages & Salaries  19,795  9,800  3,428     E 101-45000-104 Temporary Employee Wages  19,299  29,100   8,688   "  E 101-45000-121 PERA Coord. Employer Contribu.  1,484  700   256   "  E 101-45000-122 FICA Employer Contribution  2,242  2,600   726   "  E 101-45000-126 MEDICARE Employer Contribution  532  600   187   "  E 101-45000-131 Employer Paid Health  -  2,100   1,539   "  E 101-45000-132 Dental Insurance  -  100   18     E 101-45000-134 Employer Paid Life  -  -   72   "  E 101-45000-135 Employer Paid Disability  -  1,000   186   "  E 101-45000-141 Unemployment Compensation  -  -   -   "  E 101-45000-151 Worker s Comp Insurance Prem  1,711  1,450   1,915   "  E 101-45000-200 Office Supplies  -  300   -     E 101-45000-203 Printed Forms & Papers  285  900   78     E 101-45000-210 Operating Supplies  1,868  900   259     E 101-45000-212 Fuel  243  1,500   451     E 101-45000-221 Equipment Parts  242  2,000   233     E 101-45000-223 Structure Repair & Supplies  (451)  500   -     E 101-45000-240 Small Tools and Minor Equip  150  -   360     E 101-45000-312 Planning Services  -  -   -     E 101-45000-313 Committee & Commission Reimbur  1,380  1,200   540     E 101-45000-319 Other Services  898  -   122     E 101-45000-322 Postage  -  -   -     E 101-45000-340 Advertising  -  -   180 200    E 101-45000-353 Sales& Use Tax  37  -   -     E 101-45000-361 Liability/Property Ins  4,817  7,100  7,911    E 101-45000-381 Utilities-Electric & Gas  4,148  4,000  4,450   E 101-45000-384 Refuse/Garbage Disposal  4,553  1,900  2,142   E 101-45000-385 Sewer Pumping & Maintenance  378  500  143   E 101-45000-401 Building Maintenance/Repairs  1,208  6,000  438   E 101-45000-403 Improvements Other Than Bldgs.  -  -  1,486    E 101-45000-404 Repair Machinery/Equipment  203  700  100    E 101-45000-406 Grounds Care  764  4,000  - Plant replacements - MNDOT, City Hall, W.H., W.E. ballfield, City signs  E 101-45000-438 Misc. Contractual  4,913  3,000  -    E 101-45000-439 Refunds Issued  -  -  -    E 101-45000-440 Events  5,744  3,000  6,493     2023 Draft Proposed Line-Item Budget Detail Actual  Budget  Actual Proposed   Ty Code Description  2021  2022  6/30/2022 2023 % Bud Diff  Notes and Descriptions  E 101-45000-490 Financial Assistance  -  -  - -   Program supplemental for those who can't afford classes or programs offered  E 101-45000-530 Capital Impr Other Than Bldgs.  1,505  10,000   - 10,000 0.0%  Rink board and fencing improvements   TOTAL DEPT. 45000 PARKS AND RECREATION 77,948  94,950  42,399  111,670  17.6%    DEPT. 45180 COMMUNITY CENTER  E 101-45180-101 Regular Wages & Salaries  2,956  14,400  6,132  Includes PW Worker Allocation  E 101-45180-104 Temporary Employee Wages  -  -   -   "  E 101-45180-121 PERA Coord. Employer Contribu.  204  1,100   441   "  E 101-45180-122 FICA Employer Contribution  181  900   354   "  E 101-45180-126 MEDICARE Employer Contribution  35  200   92   "  E 101-45180-131 Employer Paid Health  -  3,100   1,498   "  E 101-45180-132 Dental Insurance  -  -   -     E 101-45180-134 Employer Paid Life  -  -  24  "  E 101-45180-135 Employer Paid Disability  -  100   69   "  E 101-45180-151 Worker s Comp Insurance Prem  -  -   -   "  E 101-45180-210 Operating Supplies  1,912  2,800   628   Toilet paper, soap, hand towels, softener salt, wax, floor cleaner, Ice melt  E 101-45180-223 Structure Repair & Supplies  343  6,500   9   toilet and sink parts, kitchen repairs  E 101-45180-334 Licenses & Permits  874  900   777     E 101-45180-361 Liability/Property Ins  2,172  2,300  2,563     E 101-45180-381 Utilities-Electric & Gas  6,018  10,600  6,039     E 101-45180-384 Refuse/Garbage Disposal  1,889  1,800  804     E 101-45180-385 Sewer Pumping & Maintenance  2,549  3,500  1,576     E 101-45180-401 Building Maintenance/Repairs  10,685  13,000  7,245     E 101-45180-404 Repair Machinery/Equipment  2,471  3,000  -     E 101-45180-406 Grounds Care  260  650  -  Plant/ flower replacement, spraying,  E 101-45180-407 Well Repair & Maintenance  -  600   13,675   RPZ testing - annual  E 101-45180-438 Misc. Contractual  1,995  2,500   -     E 101-45180-439 Refunds Issued  -  -  -      2023 Draft Proposed Line-Item Budget Detail Actual  Budget  Actual Proposed   Ty Code Description  2021  2022  6/30/2022 2023 % Bud Diff  Notes and Descriptions  E 101-45180-520 Capital Improvements to Bldgs.  3,464  6,000  1,999 6,000 0.0%  New furnace's? Hot water heater in the back?  E 101-45180-530 Capital Impr Other Than Bldgs.  2,555  -   - -     E 101-45180-570 Office Equipment  1,319  -   - -      TOTAL DEPT. 45180 COMMUNITY CENTER EXPENSE 41,884 73,950 43,925 79,390 7.4%      DEP 49000 INTERFUND TRANSFERS OUT E 101-49000-720 Interfund Transfers Out 282,690 - - - 0.0% TOTAL DEPT. 49360 INTERFUND TRANSFERS OUT 282,690 - - - Excess Fund balance transfer to capital      TOTAL FUND 101 GENERAL FUND EXPENDITURES 2,013,167 1,883,300 754,746 2,069,909 9.9%      NET REVENUE OVER EXPENSES - Over/(Under) (175,875) 25,993 (608,991) 32,009 2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 225 - ECONOMIC DEVELOPMENT AUTHORITY FUND   R  225-31000  Washington City. Tax Settlement   5,000   8,000   - 5,300   -33.8%   no < 0.0185 percent of the estimated market value in the city; 2021: $147,158  R 225-33640 Other Grants  -  -    - -    No anticipated grant revenues for 2021 at this time.  R 225-36210 Interest Income  85  200    - 200  0.0%  Interest earnings to be redistributed  R 225-39203 Transfer from Other Funds  2,776  -    - -    No anticipated Transfers for 2021   TOTAL FUND 225 REVENUE 7,861  8,200  -  5,500  -32.9%    E  225-46500-210  Operating Supplies   890   -   -   500     Mailing supplies, tourism promotion, and domain for tourism website.  E 225-46500-303 Engineering Fees  -  5,000  -   -  -100.0%    E 225-46500-304 Legal Services  -  -  -   -      E 225-46500-308 Other Professional Services  69  125  -   300  140.0%  Scandia Holiday Market  E 225-46500-340 Advertising/Tourism  -  2,000   75  2,000  0.0%    E 255-46500-433 Dues and Subscriptions  - 2,650  1,653  1,700  -35.8%  $325 for EDAM Dues, $325 Forest Lake Area Chamber, MN Rural Broadband Coalition  E 225-46500-440 Events    - 400  591  800  100.0%    E 255-46500-720 Transfer Out    - -  -  -       TOTAL FUND 225 EXPENDITURES 959 10,175 2,319 5,300 -47.9%      NET REVENUE OVER EXPENSES - Over/(Under) 6,902 (1,975) (2,319) 200 -110.1% 2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 226 - CABLE TV SPECIAL REVENUE FUND   R  226-36210  Interest Income   96   -   -   100      R 226-38050 Cable TV Franchise Rebates  18,062  15,400  7,815  16,200  5.2%    R 226-38051 PEG Fees  5,131  3,500  2,118  4,200  20.0%    R 226-39203 Transfer In  -  -  -  -       TOTAL FUND 226 REVENUE 23,290 18,900 9,933 20,500 8.5%      E 226-41950-240 Small Tools and Minor Equip  285  -  498  300   E 226-41950-309 Software Support & Maintenance  2,631  3,500  2,019  3,500  0.0%  Boxcast of meetings  E 226-41950-438 Misc. Contractual  2,760  8,000  2,300  5,300  -33.8%  Cost of Filming of Meetings by LACTV  E 226-41950-570 Office Equipment  230  250  26,990  -  -100.0%    E 226-41950-720 Transfer Out 5 - - -   TOTAL FUND 226 EXPENDITURES 5,912 11,750 31,806 9,100 -22.6%      NET REVENUE OVER EXPENSES - Over/(Under) 17,378 7,150 (21,873) 11,400 59.4% FUND 313 - 2013A DEBT SERVICE FUND R 313-31000 Washington City. Tax Settlement  68,220  67,000  - 64,000  -4.5%  2013 EQUIPMENT CERTIFICATE FOR $570,000 FOR 10 YR TERM  R 313-36210 Interest Income  -  -    - -    INTEREST RATE 2.2-3.55%  R 313-39350 Certificate of Indebtedness  -  -    - -       TOTAL FUND 313 REVENUE 68,220  67,000  -  64,000  -4.5%     E  313-47000-304  Legal Services   -   -   -   -      E 313-47000-601 Long Term Debt Principal  60,000  60,000  60,000  60,000  0.0%    E 313-47000-611 Long Term Debt Interest  7,140  2,790  1,860  3,047  9.2%    E 313-47000-620 Fiscal Agent s Fees  495  495  495  500  1.0%     TOTAL FUND 313 EXPENDITURES 67,635  63,285  62,355  63,547  0.4%   NET REVENUE OVER EXPENSES - Over/(Under) 585  3,715  (62,355)  453  (0)    2023 Draft Proposed Line-Item Budget Detail  Actual Budget Actual Proposed    Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 318 - 2018 G.O. ROAD IMPROVEMENT BONDS DEBT SERVICE FUND   R  318-31000  Washington City. Tax Settlement   341,456   344,531   - 342,546   -0.6%   Payoff 2033  R 318-36210 Interest Income  -  -    - -    First Call Date for Refinancing 12/15/2025  R 318-39200 Interfund Operating Transfer  -  -    - -    Life Span 9.107 Years   TOTAL FUND 318 REVENUE 344,531 - 342,546 -0.6%      E 318-47000-304 Legal Services   E 318-47000-601 Long Term Debt Principal  220,000  230,000  -  250,000  8.7%  $3,835,000 original issue toward 2018 Road Projects totaling $4,672,273  E 318-47000-611 Long Term Debt Interest  104,725  98,125  49,063  91,225  -7.0%    E 318-47000-620 Fiscal Agent s Fees  495  495  495  500  1.0%     TOTAL FUND 318 EXPENDITURES 325,220 328,620 49,558 341,725 4.0%      NET REVENUE OVER EXPENSES - Over/(Under) (325,220) 15,911 (49,558) 821 -94.8% 2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 401 - GENERAL CAPITAL FUND    R  401-31000  Washington City. Tax Settlement   100,000   217,336   - 409,291   88.3% Recommended Levy per FMP   R 401-31951 Special Assessments Principal  384  -    - -        R 401-31952 SA Penalties & Interest  7  -  - -       R 401-33422 Other State Grants & Aids  -  240,625  - -  -100.0%   R 401-33640 Other Grants  -  -    - -        R 401-36100 Special Assessments  1,807  -  - -       R 401-36210 Interest Income  2,941  4,500  - 2,300  -48.9%   R 401-36230 Donations  6,089  -    - -        R 401-39101 Sales of General Fixed Assets  -  -  - -       R 401-39200 Interfund Operating Transfer  200,000  -  - -       TOTAL FUND 401 REVENUE 311,228 462,461 - 411,591 -11.0%      2023 Draft Proposed Line-Item Budget Detail Actual  Budget  Actual  Proposed   Ty Code Description  2021  2022  6/30/2022  2023  % Bud Diff  Notes and Descriptions   E FUND 401 EXPENSES 401-41000-520 Administration Capital to Bldgs.   -   -   12,750   -      E 401-41000-530 Administration Capital  19,389  319,280  4,950  482,000  51.0%    E 401-42200-520 Fire Capital to Bldgs.  -  -  -  65,000      E 401-42200-530 Fire Capital  236,793  -  -  -      E 401-43000-520 Public Works Capital to Bldgs.  -  -  -  -      E 401-43000-530 Public Works Capital  -  -  -  -      E 401-43100-530 Streets and Roads  -  -  -  -      E 401-45000-520 Park Capital to Buildings  -  -  -  -      E 401-45000-530 Park Capital  -  -  -  -      E 401-45180-520 Community Center Building Impr  17,815  52,000  16,609  -  -100.0%    E 401-45180-530 Community Center Capital  11,024  -  -  -      E 401-48000-101 Regular Wages & Salaries  -  -  -  -    Discontinued  E 401-48000-303 Engineering Fees  -  -  -  -      E 401-48000-308 Other Professional Services  -  -  -  -      E 401-48000-312 Planning Services  -  -  -  -      E 401-48000-435 Misc. Expense  -  -  -  -      E 401-48000-438 Misc. Contractual  -  286,000  -  -  -100.0%    E 401-48000-520 Capital Improvements to Bldgs.  -  -  -  -      E 401-48000-530 Capital Imp Other Than Bldgs.  237,250  -  -  100,000      E 401-48000-540 Heavy Machinery Capital  -  -  -  -      E 401-48000-550 Motor Vehicles Capital  -  -  -  -      E 401-48000-560 Furniture and Fixtures  -  -  -  -      E 401-48000-570 Office Equipment  -  -  -  -      E 401-48000-720 Operating Transfers  -  -  -  -      E 401-48500-303 Engineering Fees  -  -  -  -       TOTAL FUND 401 EXPENDITURES 522,271 657,280 34,309 647,000 -1.6%      NET REVENUE OVER EXPENSES - Over/(Under) (211,043) (194,819) (34,309) (235,409) 20.8% 2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 404 - PARK CAPITAL FUND  R 404-31000 Washington City. Tax Settlement  10,000  20,000  - 20,000  0.0%    R 404-33422 Other State Grants & Aids  5,243  104,000    - -  -100.0%    R 404-33640 Other Grants  -  -    - -      R 404-34730 Ballfield Ad Revenue  -  -    - -      R 404-34780 Park Dedication Fees  3,000  3,000    - 21,000  600.0%  7 new lots Rolling Acres 61 Subdivision on Keystone Avenue N  R 404-36210 Interest Income  493  1,200    - 66  -94.5%    R 404-36230 Donations  -  -    1,400 -      R 404-36260 Sale of Equipment  -  -    - -      R 404-39101 Sales of General Fixed Assets  -  -    - -      R 404-39203 Transfer from Other Funds  -  -    - -       TOTAL 404 FUND REVENUE 18,735 128,200 1,400 41,066 -68.0%      E 404-48000-210 Operating Supplies  -  -  -  -   E 404-48000-302 Surveying  -  -  -  -      E 404-48000-303 Engineering Fees  -  -  -  -      E 404-48000-304 Legal Services  -  -  -  -      E 404-48000-308 Other Professional Services  -  -  -  -      E 404-48000-312 Planning Services  -  15,600  -  -  -100.0%    E 404-48000-381 Utilities-Electric & Gas  -  -  -  -      E 404-48000-384 Refuse/Garbage Disposal  -  -  -  -      E 404-48000-510 Capital Outlay-Land  -  -  -  -      E 404-48000-512 Easement Acquisition  -  -  -  -      E 404-48000-520 Capital Improvements to Bldgs.  -  -  -  -      E 404-48000-530 Capital Impr Other Than Bldgs.  18,345  219,008  3,125  17,306  -92.1%    E 404-48000-560 Furniture and Fixtures  -  -  -  -      E 404-48000-710 Residual Equity Transfers  -  -  -  -      E 404-48000-720 Operating Transfers  -  1,440  -  -  -100.0%  Ballfield Labor Expense to be transferred to General Fund   TOTAL FUND 404 EXPENDITURES 18,345 236,048 3,125 17,306 -92.7%      NET REVENUE OVER EXPENSES - Over/(Under) 390 (107,848) (1,725) 23,760 -122.0% 2023 Draft Proposed Line-Item Budget Detail Actual Budget Actual Proposed   Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 406 - EQUIPMENT CAPITAL FUND  R 406-31000 Washington City. Tax Settlement  130,000  87,800  - -  -100.0%    R 406-36210 Interest Income  657  1,015   - 1,030  1.5%    R 406-36230 Donations  -  -   - -      R 406-36250 Misc. Refund  -  -   - -      R 406-36260 Sale of Equipment  42,038  -   - 35,000      R 406-39200 Interfund Operating Transfer  -  -   - -      R 406-39350 Certificate of Indebtedness  -  -   - 816,500       TOTAL 406 FUND REVENUE 172,695 88,815 - 852,530 859.9%      E 406-48500-304 Legal Services  -  -  -  -   E 406-48500-319 Other Services  -  -  -  -      E 406-48500-340 Advertising  -  -  -  -      E 406-48500-540 Heavy Machinery Capital  -  198,500  204,506  325,000  63.7%    E 406-48500-550 Motor Vehicles Capital  40,073  -  -  189,500      E 406-48500-560 Furniture and Fixtures  -  -  -  -      E 406-48500-570 Office Equipment  -  -  -  -      E 406-48500-720 Operating Transfers  -  -  -  -       TOTAL FUND 406 EXPENDITURES 40,073 198,500 204,506 514,500 159.2%      NET REVENUE OVER EXPENSES - Over/(Under) 132,622 (109,685) (204,506) 338,030 -408.2% 2023 Draft Proposed Line-Item Budget Detail  Actual Budget Actual Proposed    Ty Code Description 2021 2022 6/30/2022 2023 % Bud Diff Notes and Descriptions  FUND 408 - LOCAL ROAD IMPROVEMENT FUND  R 408-31000 Washington City. Tax Settlement  438,539  216,860  -  212,012  -2.2%    R 408-33422 Other State Grants & Aids  89,362  -  11,290  -      R 408-34304 Reimbursement for Services  -  -  -  -      R 408-36100 Special Assessments  -  -  -  -      R 408-36210 Interest Income  4,298  19,613  -  12,115  -38.2%    R 408-39203 Transfer from Other Funds  80,000  -  -  -      R 408-39310 Proceeds-Gen Obligation Bond  -  -  -  -      R 408-36250 Misc. Refund  -  -  -  -       TOTAL 408 FUND REVENUE 612,199 236,473 11,290 224,127 -5.2%      E 408-43100-303 Engineering Fees  160,493  -  42,852  20,000   E 408-43100-530 Capital Impr Other Than Bldgs.  799,606  707,200  322  973,000  37.6%    E 408-43100-720 Operating Transfers - - - - TOTAL FUND 408 EXPENDITURES 960,100 707,200 43,173 993,000 40.4%      NET REVENUE OVER EXPENSES - Over/(Under) (347,901) (470,727) (31,883) (768,873) 63.3%