7. 2022-challenge-process-results
2022 Border-to-Border Broadband Grant Program
Challenge Results
Number of Completed Applications Filed: 130 Challenges Submitted: 75
Number of Projects Challenged: 64 Number of Challengers: 23
The following 44 projects were not funded (in
total or partially) due to credible challenges:
Challenger:
Anoka County -Anoka County Border-to-
Border Broadband
Comcast challenged a portion of this project
noting 111 addresses near the Rogers Lakes
area have access to speeds up to 1.2 Gbps
download*; Midco also challenged this project
indicating they currently provide service to
183 addresses and 20 to be built in 2022 at 1
Gbps download and 50 Mbps upload.*
Bridge Water Telephone Co., (dba TDS
Telecom)-Bridge Water Tel Enfield Project
Midco challenged this project. They are
currently constructing connection to 555
addresses in Silver Creek Township and
working on a partnership with Wright County
to provide service to 102 addresses. They will
also extend service to an additional 110
addresses in Monticello Township.
City of Buffalo - Buffalo Fiber-Buffalo South
Grant
Charter Communications has challenged a
portion of this project where they provide
broadband service download speeds of 1000
Mbps and upload speeds of 35 Mbps.*
City of Columbia Heights-City Wide Fiber
Comcast challenged this project. They
currently provide service to the entire project
area.*
City of Duluth-Duluth Fiber
Charter Communications has challenged a
substantial portion of this project where they
provide broadband service download speeds
of 1000 Mbps and upload speeds of 35 Mbps.
*
Consolidated Communications Enterprise
Services, Inc.-FTTP City of Amboy
LTD Broadband challenged this project. They
are currently in the process of building out
this entire area self-funded to provide 1000
Mbps/1000 Mbps, anticipated completion by
end of year 2023.
Consolidated Communications Enterprise
Services, Inc.-FTTP City of Vernon Center
LTD Broadband challenged this project. They
are currently in the process of building out
this entire area self-funded to provide 1000
Mbps/1000 Mbps, anticipated completion by
end of year 2023.
Consolidated Telephone Company-CTC Woods
to Waters Broadband Initiative
Mediacom challenged 2 of the 9 portions of
this project. Jean Duluth South Project* and
Rice Lake Ph 1 Project overlap an existing
Mediacom build and Lakewood Township
portion is an existing Mediacom commitment
to build by 2024 with speeds of 1 Gbps
download and 50 Mbps upload. These
portions of the proposed project were
removed from consideration based on
Mediacom’s challenge.
East Central Energy-Kanabec Central
Midco challenged a portion of this project.
They will be building a portion of the project
area, including 468 future serviceable
addresses in 2023 with 5 Gig download and 5
Gig upload speeds. The portion of the
proposed project was removed from
consideration based on Midco’s challenge.
East Central Energy-Pine South
Midco challenged a portion of the proposed
project area. They currently provide service to
a portion of the project area including
approximately 271 currently serviceable
addresses of 5 Gig download and 5 Gig
upload. In addition, Midco was recently
awarded a grant from Pine County to connect
11 homes in the proposed project area. This
will be fiber-to-the-premise and completed in
2023. The portion of the proposed project was
removed from consideration based on Midco’s
challenge.
East Central Energy-Pine North
SCI challenged a portion of this project. They
are in the process of building fiber to portions
in the proposed project area with speeds
exceeding 100/20. The portion of the
proposed project was removed from
consideration based on SCI’s challenge.
Frontier Communications of Minnesota, Inc.-
Watonwan
Christensen Communications Company (CCC)
challenged a portion of this project. They
currently provide service to a portion of the
proposed project area.
Frontier Communications of Minnesota, Inc.-
Martin
Federated Rural Electric Association (dba
Federated Broadband) challenged a portion of
this project. They have been awarded a CDBG-
CV Grant for the city of Ceylon, MN that
partially overlaps this application. Midco
challenged a portion of this project. They
provide service to approximately 1,961
serviceable addresses.
Frontier Communications of Minnesota, Inc.-
Dakota
JTN communications challenged a portion of
this project. They are in the process of
installing fiber in a portion of the proposed
project area. Charter Communications
challenged a portion of this project where
they provide broadband service download
speeds of 1000 Mbps and upload speeds of 35
Mbps.*
Frontier Communications of Minnesota, Inc.-
Pine
Mediacom challenged a portion of the
proposed project. The project will be
overlapping into parts of Sturgeon Lake area
that Mediacom already provides service above
the 2026 State Broadband goals.*
Frontier Communications of Minnesota, Inc.-
Kandiyohi
Meeker Cooperative dba VIBRANT Broadband
challenged a portion of the proposed project
that is currently served.*
Frontier Communications of Minnesota, Inc.-
Chisago
Midco challenged a portion of the proposed
project area. They currently provide service to
a significant portion of the project area
including approximately 2,350 currently
serviceable addresses of 1 Gig download and
50 Mbps upload.*
Frontier Communications of Minnesota, Inc.-
Chisago-Shafer
Midco challenged a portion of the proposed
project area. They currently provide service to
a significant portion of the project area
including approximately 1,500 currently
serviceable addresses of 1 Gig download and
50 Mbps upload.*
Frontier Communications of Minnesota, Inc.-
Goodhue
Midco challenged a portion of the proposed
project area. They currently provide service to
a portion of the project area including
approximately 274 currently serviceable
addresses of 1 Gig download and 50 Mbps
upload.*
Frontier Communications of Minnesota, Inc.-
Sherburne
Midco challenged a portion of the proposed
project area. They currently provide service to
a significant portion of the project area
including approximately 355 currently
serviceable addresses of 1 Gig download and
50 Mbps upload.*
Frontier Communications of Minnesota, Inc.-
Washington
Midco challenged a portion of the proposed
project area. They currently provide service to
a significant portion of the project area
including approximately 588 currently
serviceable addresses of 5 Gig symmetrical.*
Frontier Communications of Minnesota, Inc.-
Wright
Midco challenged a portion of the proposed
project area. They currently provide service to
a portion of the project area including
approximately 400 currently serviceable
addresses of 1 Gig download and 50 Mbps
upload.*
Frontier Communications of Minnesota, Inc.-
Aitkin
SCI challenged a portion of the proposed
project area. They are in the process of
building fiber within the proposed project
area with speeds exceeding 100/20 and the
project is within an SCI RDOF area.
Frontier Communications of Minnesota, Inc.-
Carlton
SCI challenged a portion of the proposed
project area. They are in the process of
building fiber to portions in the proposed
project area with speeds exceeding 100/20.
Frontier Communications of Minnesota, Inc.-
Mille Lacs-Isle
SCI challenged a portion of the proposed
project area. They are in the process of
building fiber to portions in the proposed
project area with speeds exceeding 100/20.
Gardonville Cooperative Telephone
Association-Buckskin
Arvig challenged a small portion of the
proposed project area. They plan to expand
1G symmetrical speeds in the next 18 months.
Charter challenged a portion of this proposed
project indicating they will serve the portion
within 18 months.
Gardonville Cooperative Telephone
Association-Carlos
Charter challenged a portion of this proposed
project indicating they will serve the portion
within 18 months.
HomeTown Internet, LLC Broadband
Infrastructure Expansion Project
Windstream challenged the proposed project
currently offering 100 Mbps/20 Mbps to 1,540
locations.* Frontier challenged a portion of
the proposed project area. They currently
serve 83 locations at 2G/2G.* Midco
challenged a significant portion of the
proposed project area. They have 18,375
current and future serviceable addresses that
overlap the proposed project area at
1G/50Mbps.
LTD Broadband-Mower Northeast Project
Arvig challenged a portion of the proposed
project area. They plan to expand 1G
symmetrical speeds in the next 18 months.
Mediacom Minnesota LLC -South Kasota
Consolidated Communication challenged a
portion of the proposed project. They intend
to build 2G/2G by June 2024.
Melrose Telephone Co. dba Arvig-Stearns
County Area Fiber Build
Meeker Cooperative (dba VIBRANT)
challenged a portion of the proposed project
area. They currently offer 1G/1G to a portion
of the project area. The portion of the
proposed project was removed from
consideration based on Meeker Cooperative’s
challenge.*
Mille Lacs Energy Cooperative-Phase 6 MLEC
Fiber to the Home
SCI challenged a portion of the proposed
project area. They currently offer service
within the proposed project area with speeds
exceeding 100 Mbps/20 Mbps. The portion of
the proposed project was removed from
consideration based on SCI’s challenge.*
Nuvera Communications, Inc.-Belle Lake and
Hutchinson East FTTP
Meeker Cooperative (dba VIBRANT)
challenged a portion of the proposed project
area. They currently offer 1G/1G to a portion
of the project area. The portion of the
proposed project was removed from
consideration based on Meeker Cooperative’s
challenge.*
Paul Bunyan Communications-Northern
Minnesota GigaZone Fiber
SCI challenged a portion of the proposed
project area. They currently offer service
within the proposed project area with speeds
exceeding 100 Mbps/20 Mbps. The portion of
the proposed project was removed from
consideration based on SCI’s challenge.*
Qwest Corporation dba CenturyLink QC-
Centurylink City of Harris
Midco challenged a portion of the proposed
project area. They currently provide service to
35 addresses in the proposed area at 1G/50
Mbps. The portion of the proposed project
was removed from consideration based on
Midco’s challenge. *
Southeast MN Wifi, LLC-Lillehei
HBC challenged a portion of the proposed
project area. They are committed to building
10G symmetrical service in this area in 2023.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Wright County
Project 3
Midco challenged a portion of the proposed
project area. They will be building and provide
service to 215 locations south of Delano in
2023 at 5G/5G. The portion of the proposed
project was removed from consideration
based on Midco’s challenge.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Blue Earth
County Project
Consolidated Communication challenged a
portion of the proposed project area. They
currently provide service to a portion of the
proposed project area and plan to provide
service to another portion of 2G/2G speeds by
June 2024.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Nicollet County
Project
Consolidated Communication challenged a
portion of the proposed project area. They
currently are building or plan to build to
provide service to a portion of the proposed
project area of 2G/2G speeds by June 2024.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-St. Louis County
Project
Consolidated Telephone Company (CTC)
challenged portions of the proposed project
area. They are currently building a portion
that will be completed in 2022 with
250Mbps/250Mpbs speeds. Mediacom
challenged a portion of the proposed project
area. They will be building the Lakewood
Township area by 2024 with speeds of 1G/50
Mbps.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Mower County
Project
LTD Broadband challenged this project. They
are currently in the process of building out
this entire area self-funded to provide 1000
Mbps/1000 Mbps, anticipated completion by
end of year 2023.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Wright County
Project 2
Midco challenged a portion of the proposed
project area. They will be building and provide
service to 555 locations in Silver Creek
Township by 2023 at 5G/5G.
Spectrum Mid-America, LLC managed by
Charter Communications Inc.-Pope County
Project
Runestone Telecom challenged portions of the
proposed project area that have been built
with fiber and have symmetrical speeds of
1000 Mbps. *
Starwire Technologies, LLC-City of Rock Creek
FTTH
Midco challenged a portion of the proposed
project area. They currently provide service to
92 locations at 5G/5G. *
*Areas challenged as already served, no follow up necessary.
Note: only credible challenges are listed (i.e., Fixed Wireless challenges are not included)