Loading...
8.d) Engineering Activity Report (February 2013) 8.�� Engineering Activity Report ` ` � � February 1 through February 28, 2013 .�. 1���-��� Phil Gravel, City Engineer SCAND� (651) 604-4885 phil.gravel@stantec.com The purpose of this report is to provide information on recent engineering activity in Scandia. Streets • Prepared advertisement for bids for 2013 seal coat project. The completed plans and specifications are now available for bidders. Bids will be received on April 3`�. • Worked with Tim Kieffer on ideas for 2013 gravel quotes. • Worked with Tim on ideas for 2013 dust control quotes. • Worked with Tim on ideas for 2013 bituminous patching. • Prepared condition report and cost estimates for Quinnell Avenue bituminous overlay. Sewer • Worked with Clint Jordahl and Andy Riemer to arrange for spring well sampling on the Anderson-Erickson system. Sampling is scheduled for the Wednesday, March 20th if the weather conditions are ok. Test results from Pace Labs usually take about 3 weeks after the samples are submitted. • Reviewed draft Uptown Permit from Washington County. • Reviewed possible pertormance drainfield system information. • Reviewing flow information for possible sewer ordinance revisions. Will provide recommendations to Kristina and Tim in March. Miscellaneous • Attended 2/19/13 Council Meeting. • Regular phone conversations with Tim Kieffer. • Attended Washington County Engineer's quarterly meeting (no charge). City of Scandia—Engineering Activity ReF�ort