The purpose of this report is to provide information on recent engineering activity in Scandia.
Streets
• Prepared advertisement for bids for 2013 seal coat project. The completed plans and
specifications are now available for bidders. Bids will be received on April 3`�.
• Worked with Tim Kieffer on ideas for 2013 gravel quotes.
• Worked with Tim on ideas for 2013 dust control quotes.
• Worked with Tim on ideas for 2013 bituminous patching.
• Prepared condition report and cost estimates for Quinnell Avenue bituminous overlay.
Sewer
• Worked with Clint Jordahl and Andy Riemer to arrange for spring well sampling on the
Anderson-Erickson system. Sampling is scheduled for the Wednesday, March 20th if the
weather conditions are ok. Test results from Pace Labs usually take about 3 weeks after the
samples are submitted.
• Reviewed draft Uptown Permit from Washington County.
• Reviewed possible pertormance drainfield system information.
• Reviewing flow information for possible sewer ordinance revisions. Will provide
recommendations to Kristina and Tim in March.
Miscellaneous
• Attended 2/19/13 Council Meeting.
• Regular phone conversations with Tim Kieffer.
• Attended Washington County Engineer's quarterly meeting (no charge).