Loading...
8.f) Washington County 2013 Construction Costs and Revenue Washington �`' ,� �County 2p13 Construction Costs � Traffic Signal $ 250,000 1 Mile Bike Trail $ 185,000 1 Mile 2-Lane Rural $ 1 ,500,000 1 Mile 4-Lane Divided $ 4,900,000 1 Mile Pavement Rehab $ 350,000 � .__a__.�.__.:_._ _ ._ ____. Revenue �,��,� A $0.05 Gas Tax � -� • Costs $40 / year for an average vehicle • Raises $160 Million Statewide in revenue • Directs $928,000 to Washington County ; A $5.00 Wheelage Tax • Costs $5.00 / year per vehicle Po • Directs $1,000,000 to Washington County Washington �County