3. log house landing ramp plan Staff Report Date of Meeting: June 1, 2016 To: City Council From: Neil Soltis, Administrator Re: Log House Landing Boat ramp Background: At the May 4 work session the Council and Board of the Carnelian-Marine-St. Croix Watershed District reviewed and made comments on the concept plan for the boat ramp. Revisions have been made to the plan and the Watershed District Board has requested a review of the changes that were made to the plan before work on finalizing the requests for proposals to be sent to contractors. Issue: Are there additional changes that need to be made to the revised plan for the project? Proposal Details: A copy of the plan is provided as an attachment. The plan includes additional clarification as to the materials and the construction of the ramp. Once the design has been approved by the Council and the Watershed Board, application will be made to the Army Corps of Engineers for a permit. Options: 1. Modify the plan 2. Approve the plan w ater ecology c o mmunit y LOGHOUSE LANDING BOAT RAMP STABILIZATION CONCEPT PLAN 5/26/2016 DRAINTILE PIPE WITH STABLIZED OUTLET CONCRETE PAVEMENT ANCHORS AND DRAIN TILE CENTERED BETWEEN JOINTS; PER MNDOT STANDARD PLAN 5-297.235 (32) 12’ WIDE CONCRETE PLANKS; SUPPLIED BY MN DNR; ANGLE RAMP DOWNSTREAM 14˚ OF PERPENDICULAR (SEE ATTACHED DNR STANDARD DETAIL) - INSTALL PRIOR TO CONCRETE RAMP 10” DEPTH DRESSER (OR =) AGGREGATE SPILLWAY OVER COMPACTED FILL; 3-4” DIA. ABOVE DRAIN OUTLET; 6” DIA. BELOW DRAIN PIPE OUTLET STABILIZE WASHED OUT FOOT PATH WITH 36” WIDTH ROUGH CUT STONE STAIR - INSTALL PRIOR TO RAMP OVER GABION ANCHOR BASKETS BUILD UP GRADE (APPROX. 6”) TO DIRECT WATER AWAY FROM TOP OF RAMP 10” REINFORCED CONCRETE DRIVE RAMP, 12’ WIDTH - TOOLED, GROOVED SURFACE; EXCAVATE RAMP AREA 40” - IMPORT 30” COMPACTED FILL STABILIZE ROADWAY BANKS WITH 18-36” BOULDERS OVER GEOTEXTILE FABRIC; SEED DISTURBED SLOPES WITH NATIVE SEED MIX AND NETLESS FIBER BLANKET ST. CROIX RIVER 24% 13% 2% cross- slope EROSION CONTROL NETLESS FIBER ROLL CONCRETE PAVING JOINTS AT 15’ O.C. REMOVE BOULDERS AND STUMP FROM RAMP AREA PRIOR TO CONCRETE WORK INCREASE RAMP WIDTH 2-3’ AT OUTSIDE RADIUS - PER SITE CONDITIONS DISTURBANCE AREA BELOW OHW - 616 SF NOTE: SITE EROSION CONTROL WILL CONSIST OF FIBER ROLLS ABOVE OHW AND SILT CURTAIN AROUND UNDERWATER EXCAVATION AREAS. SEE ATTACHED DETAIL FOR PROPOSED EXCAVATION DEPTH OF PLANK INSTALLATION. DRAIN TILE AT PERIMETER OF CONCRETE RAMP NOTE: EOR HAS DEVELOPED THIS PLAN AS A CONCEPT FOR RAMP STABILIZATION ONLY. FINAL DIMENSIONS, MATERIALS, AND METHODS FOR CONSTRUCTION SHALL BE DETERMINED BY THE CONTRACTOR AND THE CITY OF SCANDIA. 40 8 16