04. Expansion Joint Replacement Report Staff Report Date of Meeting: May, 3rd 2023 To: City Council From: Mike Hinz, Fire Chief Re: Expansion Joint Replacement Background: In the fall of 2021 the roof was replaced on the fire/pw building. During this process the roofing crew noticed water damage on the roof due to the expansion joints leaking. The crew repaired the portion that was under the roofing material, but said we should have someone look at the rest of the building. In May of 2022 I contacted Ryan to see if someone at his firm could look at the building. They gave me the contact information for a company that did this kind of work. I contacted them and they came out to look and said that yes it needs to be replaced and that an average life is 10-15 years (building is now 23 years old). They also said that we should do it as soon as possible, since water leaking in to the joints could cause the panel to expand and crack during the winter and this could cost over $100,000 to repair per panel. I contacted 3 vendors that do this work. The estimates are attached for your review. - Structural Restoration Inc = $62,940 + $3,850 = $66,790 plus time & material for repairs found on brick face of building during detailed inspection with lift onsite. - Right Way = $16,249 This would include panel joints, brick joints, window bead, louver bead, door frame bead, overhead door bead & bay apron joint. All Alternates - Carciofini = $14,800 This would include panel joints, brick joints, window bead, louver bead, door frame bead & overhead door bead. Issue: Should the city council approve expansion joint replacement on the Fire/PW building? Proposal Details: - Hire Right-Way Caulking Inc to replace all panel joints, brick joints, window bead, louver bead, door frame bead, overhead door bead & bay apron joints on the building. This is the best price for the most work covered. Project to include all alternates. Fiscal Impact: This project was put in the CIP plan last year with an estimate of $65,000. With the above estimates we will be well below CIP estimate. Options: (1) Approve joint replacement project with Right-Way Caulking Inc. Recommendation: Option (1). March 31, 2023 Attn: Mike Hinz Scandia Fire and Rescue 15040 Scandia Trail Scandia, MN 55073 651-433-4383 Station 651-303-4611 Cell Mike.Hinz@scandiafire.com REF: PRECAST PANEL CONTROL JOINT REPLACEMENT (NORTH, EAST, AND WEST ONLY) Dear Sir: After our on-site meeting with Joshua Threet and Mike Hinz on May 23, 2022, we are pleased to offer our proposal for the control joint replacements at your facility. Aerial View Elevation View Structural Restoration, Inc. 305 3rd Street Farmington, MN 55024 651-460-2990 Office 651-460-2992 Fax www.structuralrestoration.com SCOPE OF WORK PRECAST PANEL CONTROL JOINT REPLACEMENT (NORTH, EAST, AND WEST ELEVATIONS ONLY) TOTAL OF FORTY-SEVEN (47) CONTROL JOINTS 1. Use a rented 45’ scissor lift to access the sidewalls of the facility. 2. Remove the control joint material and existing backer rod. (If any) 3. Clean the sides of each control joint to verify proper adhesion of new material. 4. Install proper size diameter back rod into the control joints. 5. Seal all 47 control joints using Masterseal NP-1 or 150VLM per manufacturer's directions. (Color will be chosen by Mike Hinz) 6. Replace deteriorated joint sealant around windows as needed. No glazing or weather seal replacement is included in this proposal. Any major window issues will be reported to Mike Hinz. 7. Remove debris from work area and place in provided dumpsters. Photos shown in this proposal are for reference use only: • DEBRIS REMOVAL All debris will be removed from the work area and deposited into dumpsters. The premises will be left broom clean and in a neat and orderly condition. Owner will provide dumpsters if needed. Our prices for the work as described above are: CONTROL JOINT REPLACEMENT ON THREE ELEVATIONS $62,940.00 MOBILIZATION PER WRITTEN P.O.: $ 3,850.00 NOTES: 1. There are NO thru wall repairs included is this proposal. 2. Any thru wall repairs will be completed on a time and material basis. 3. Any work on the South Elevation will be completed on a time and material basis. All work will be coordinated with Scandia Fire and Rescue Management and an SRI Foreman. 4. Time sheets will be provided, completed, and signed by both an SRI Foreman and Scandia Fire and Rescue Management. These prices include insurance, labor, materials, equipment, and supervision needed to complete the work applying standard trade practices for this type of work. Standard COVID-19 procedures/protocols are included in this proposal. (Example: Standard PPE on site, temperature checks prior to starting work each day, and notifying SRI management of any symptoms prior to working/removal of employee from jobsite if needed.) Any additional COVID-19 procedures/protocols will result in additional time/material rates/cost. There is NO engineering included in this proposal. The owner will furnish water, dumpsters, and electricity as needed. Thanking you for this consideration, I remain STRUCTURAL RESTORATION, INC. 305 3RD STREET FARMINGTON, MN 55024 Joshua J. Threet President ACCEPTED ______________________________DATE___________________ Notes: Pricing includes labor, material and equipment to complete the work scope noted above Taxes are included unless noted otherwise Right-Way Caulking Inc. 1135 73rd Avenue NE, Minneapolis MN 55432 Tel. (763) 780-4102 Fax (763) 780-3363 April 4, 2023 Joint Sealant Proposal To: Scandia Fire & Rescue 15040 Scandia Trail N Scandia, MN 55073 Attention: Mike Hinz Phone: 651-303-4611 Project: Exterior Caulking Replacement Subject: Joint Sealant Proposal Exterior Work Scope (Base Bid): 1. Precast to precast vertical panel joints a) North, west, and east building elevations 3. Disposal cost included 4. Portable restroom included 5. Lift cost included 6. Sealant material: Tremco Dymonic FC Notes: 1. Work to be performed at all joint sealant locations: a) Removal of failed sealant, backer rod, and any dirt and debris b) Preparation of joint substrates to receive new sealant c) Installation of new backer rod and sealant d) Disposal of old material and cleanup Base Bid: $7,724.00 Alternate #1: Add: $2,272.00 1. Exterior aluminum window perimeters 2. Sealant material: Tremco Spectrum 2 silicone (Aluminum window perimeters only) Alternate #2 Add: $2,097.00 1. Overhead door apron to garage slab expansion joints 2. Bollard bases to adjacent concrete 3. Sealant material: MasterSeal Traffic grade polyurethane SEE PAGE 2 Plans dated: N/A Addendums Acknowledged: N/A Notes: Pricing includes labor, material and equipment to complete the work scope noted above Taxes are included unless noted otherwise Right-Way Caulking Inc. 1135 73rd Avenue NE, Minneapolis MN 55432 Tel. (763) 780-4102 Fax (763) 780-3363 April 4, 2023 Joint Sealant Proposal Alternate #3: Add: $2,437.00 1. Overhead door sheet metal to adjacent masonry a) At jambs and head of all openings 2. Sealant material: Tremco Dymonic FC Alternate #4 Add: $690.00 1. Brick control joints a) South building elevation 2. Sealant material: Tremco Dymonic FC Alternate #5 Add: $752.00 1. Exterior hollow metal door frame perimeters 2. Sealant material: Tremco Dymonic FC Alternate #6 Add: $277.00 1. Exterior louver perimeters in precast panels 2. Sealant material: Tremco Dymonic FC Thank You, Right –Way Caulking Inc. By: Eric Kubinski Estimator/PM JOINT SEALANTS FIRESTOPPING RESTORATION TRAFFIC COATINGS EXPANSION JOINT SYSTEMS To: Mike Hinz Date:April 11, 2023 Project:Scandia Fire Station Section: Joint Sealants Base Bid Scope of Work Total Bid Price: $12,665.00 Cutout / re-caulk exterior precast panel joints Cutout / re-caulk exterior brick control joints Cutout / re-caulk exterior bead at windows Cutout / re-caulk exterior louver perimeters Cutout / re-caulk exterior bead at hollow metal door frames Voluntary Alternate ADD: $2,135.00 Caulk perimeter of overhead door wraps to precast/brick Exclusions: Caulk Mechanical, Electrical, Plumbing penetrations Caulk metal flashings/copings Interior sealants Site concrete joints Light fixture perimeters Downspout removal Dumpsters Acknowledge Addendums: 0 Respectfully Submitted, Corey Scholl Project Manager PROPOSAL This proposal is offered and based on the terms and conditions of the Minnesota AGC Subcontract or AIA Contract A201 With no additional terminology or riders Pricing includes labor, material, and equipment Sales tax is included unless noted otherwise Pricing is subject to acceptance within 60 calendar days from date of proposal 12101 NICOLLET AVE S BURNSVILLE, MN 55337 PH: 952.252.0303 FAX 952.252.0304 WWW.CARCIOFINI.COM A SMALL BUSINESS ENTERPRISE