Loading...
9.c1 Engineering Updates 5-16-2023 City of Scandia Engineering Updates 5/16/2023 Engineering italics = old information · Capital Improvement Plan – Road Tour  Completed a road tourn on April 3, 2023 with Public Works to review the conditions of the road due to the excessive deterioration with the numerous freeze thaw cycles and rain events this winter went through. Cost estimates have been prepared and working with Public Works on review of the Capital Improvement Plan. · 2023 Crack Filling and Seal Coat Project  Allied Blacktop Company, Person Bros., Inc., and Fahrner Asphalt Sealers, LLC submitted bids on this project. The project has been awarded to Allied Blacktop Company for $139,576.50.  Addition of Parkview Lane and Parkview Avenue has been discussed and reviewed with Public Works and will be added by change order to the project.  No preconstruction date or construction start date has been determined yet. · 2023 Street Improvement Project  Wetland delineation has been completed and obtaining permits is currently in progress.  Project limits and scope of work were sent to CMSCWD. An updated plan set was sent to the watershed for comments on Monday, December 5th.  Plans/Specs are in progress and we will review with Public Works on November 22nd to go over state of the project and get the City’s input. Another plan/spec discussion meeting was held with Public Works on December 7th to go over the latest plan set/specs.  City Council approved plans and specifications and authorized ad for bid at the December 20th City Council Meeting.  Washington County ROW permit has been obtained. Only remaining item for this permit is to have the contractor fill out a registration form for Washington County once the project has been awarded. Contractor will receive direction on the Washington County permit registration once all contracts have been signed.  CMSCWD Permit Application has been submitted for review/approval at the January 11th meeting, this permit has been approved.  Ad for Bid was run in the Finance and Commerce and Country Messenger on December 28th, 2022; and will run a 2nd time on January 18th, 2023. Plans and Specs were posted to QuestCDN on December 30th, 2022, bid opening was held on January 25th, 9 Total Bids were received for the 2023 Street Improvement Project.  Contracts have been signed by all parties and distributed to the City already. Astech will receive their copies at the precon meeting held on Thursday, April 13th. Astech will have their project construction schedule and list of subcontractors prepared for this meeting.  Silt fence and biologs were installed the morning of Tuesday, May 2nd. Reclaiming started on Tuesday, May 2nd and was completed by Thursday, May 4th. Driveways were removed and ramped for resident access on Monday, May 8th. Pipe work is anticipated to begin Thursday, May 11th. · 2022 Street Improvement Project (Melanie Trail N and 238th Street N)  Wear Paving was completed on 9/8 on 238th Street and 9/12 on Melanie Trail N. Shouldering will take place in the afternoon on 9/15 or 9/16 depending on contractor’s schedule. Striping is not yet scheduled.  All punchlist items have been completed apart from a final restoration inspection in spring 2023, and potential pavement maintenance on small portion of Melanie Trail near the southern most crossing culvert if necessary, after inspection. Watershed punchlist items have also been completed.  December pay application to be a part of the next council meeting agenda. This will include full payment of all construction work for the year, while withholding 3% retainage. · Pay application #4 was signed/approved by the city on 12/30/2022 and completes payment for all quantities apart from retainage on this project.  Restoration Punchlist is to be checked in the Spring.  Watershed Punchlist items have been completed and approved by the CLFLWD.  A final pavement inspection will take place in the Spring to determine if corrective action is required on a small portion of Melanie Trail towards the South end.  Final Pay Application will be completed in the Spring once all punchlist items have been completed.  A punchlist walkthrough has been scheduled for Thursday, May 11th with Contractor and Public Works. Punchlist work is scheduled to be completed this month. · Bliss Drainfield System  The final permit has been issued. The assumption is that we’ll end up on Track 2, with required system improvements due to the nitrate issue. Only thing that needs to take place in the next 6 months (February 28, 2022) is for new flow meters to be installed at the system, something we’ll begin working on. At the one year mark (September 1, 2022), we’ll need to have a Facility Evaluation Report drafted to summarize the system’s ability or inability to meet the nitrate limit.  New flow meters were installed by Public Works at the beginning of 2022 and specific flows to the three drainfield cells is now being monitored. Some additional nitrate testing was also performed in August 2022 to provide additional data points and to get an idea of how much nutrient removal is currently taking place through the sand filters.  As of September 1, 2022, the Facility Evaluation Report has been sent to the MPCA. We await their review, but based on the monitoring well samples taken throughout the last year it appears we’ll be on Track 2, with improvements to the system needed to deal with the nitrate issue. Assuming this is the case, the next step will be to complete a full Facility Plan by August of 2023 which evaluates the facility and its performance as a whole and provides options/recommendations for improvements to be made. This is required by Track 2 but is also the next step in obtaining PFA funding for the project.  We met with MPCA on December 16, 2022 to discuss funding options and laid out a schedule to complete a facility plan and apply for Point Source Implementation Grant (PSIG) funding.  City Council authorized work to complete the facility plan on January 4, 2023. Facility plan to be submitted by March 3, 2023. Also, Council authorized BMI to complete permit documents for permit modification due to added treatment for nitrate removal.  Testified at the Capitol on Wednesday, March 1, 2023 requesting funding for the Bliss Wastewater Treatment Facility.  Facility plan has been submitted for the City of Scandia’s Bliss Wastewater Treatment Facility along with and IUP request and PPL application to the Minnesota Public Facilities Authority on Friday, March 3, 2023.  Authorization to prepare plans & specifications for the Bliss Wastewater Treatment Facility Nitrogen Removal improvements is being requested at the May 16 City Council meeting. · Washington County – Manning Ave/CSAH 15 – Sinusoidal Rumble Strips & Striping Project  Washington County has completed their 90% construction plans for the centerline sinusoidal rumble strip (mumble strips) project planned for construction in 2023. Washington County received Highway Safety Improvement Program grant funds for this project. This project includes installing center line sinusoidal rumble strips along County Highway 15 (Manning Ave) from County Highway 12 (75th St) to 240th Street (County line) and new centerline striping. · Floodplain Risk Assessment  The Watershed Board approved applying for the MPCA Small community planning grants for stormwater, wastewater, and community resilience grant last night. Application is due October 18. Grant application was submitted, Watershed District should know the results in about four more weeks, so approximately week of December 5, 2023.  Watershed District has received notification from the MPCA they did not receive the grant that was applied for. · Bliss Addition Stormwater Planning  Watershed still working toward 90% plans based on City Staff input received in November 2022.  City and Watershed have completed the MOU.  Watershed/Consultants redesigning project practices after a final utility meet locate identified previously un-marked conflicts.  Due to delays caused by utilities not marked on the initial locate, the CMSCWD will delay construction to 2024. Upon completion of the final plans, submittals will be prepared to the City for their review. CMSCWD anticipates soliciting bids in October 2023. · CLFLWD & Scandia Staff Quarterly Meetings  Meeting on May 11, 2021 covered the following topics: · Permitting Update (Nick) · Roadway Projects (Ken) · Bone Lake projects status: SE wetland restorations, NE wetland restoration, agricultural practices (Blayne) · FY22 Clean Water Fund grant award – Moody Lake projects (Emily/Blayne) · Greenway Corridor Planning & Parks Update (Nick) · CMSCWD Management Plan (Mike Isensee) · Regional Update – Highway 243 Osceola Bridge  Project website: http://www.dot.state.mn.us/metro/projects/hwy243osceola/index.html  Public Meeting scheduled for May 10, 2023, 5:00pm-7:00pm at the Osceola Village Board Room  Schedule: · Environmental documentation and preliminary design: 2021 through 2023 · Final design: 2023 through 2025 · Anticipated construction: 2026 through 2027 Denise Workcuff Dmitry Tomasevich Communications and Engagement Project manager denise.workcuff@state.mn.us dmitry.tomasevich@state.mn.us 651-775-0025 651-245-4406