8.d) Engineering Report � � .
��� ��
��1�^=� ��'"�%�` �
SCANDIA �
City of Scandia
Engineering Updates 6/18/2013
Engineerin�
• Completed Road Tour at Special City Council Meeting on May 20th. The Tour included 15t
Avenue and Olinda Trail, Goose Lake Landing, 237th Street/Novak Ave/236th Street, Pilar
Road, Log House Landing, Quinnell Ave, 197th Street, and Old Marine Trail.
• Completed re-solicitation of quotes for the 2013 Gravel Project for Old Marine Trail N
and Parade Ave N. Looking for Council action on the 6/18 meeting.
• Coordinating with Contractor of the 2013 Seal Coat Project. Construction is scheduled
for August 2013.
• Worked with Maintenance Supervisor to develop a standard residential driveway detail
plate.
• Working with Contractor to complete remaining punch list items on the Uptown Sewer
System Improvements so project closeout and final acceptance can be approved.
• Working with the City to obtain electronic data information from previous Engineer to
be implemented into the GIS system. As outlined in our proposal we have proposed to
build and deploy a GIS mapping system using the City of Scandia's existing data,
mapping information, and data from Washington County.
• Also as part of our proposal,we proposed to review every paved City Street and update
the Pavement Road Ratings within the existing Pavement Management Plan. The field
work is 80%completed.