6.c Community Center Courts Public Works Report Staff Report Date of Meeting: 2/5/2024 For: PRC From: Charles Fischer – Director of Public Works Subject: Staff Report Tennis/Pickleball Update: Public Works has been working with Bolton & Menk engineers to develop the best options for updating the tennis and pickleball facilities. After hearing many suggested options for either our courts on the City Hall campus or Barton Johnson we feel the two options provided in this report help maximize the existing and usable space at both locations or possibly only one location. Figure 1, includes updating only the city court with an expansion of playable surface. The expansion would allow for a tennis only court and six dedicated pickleball courts. ($397,000) Figure 2, includes updating two locations; the existing City courts and the Barton Johnson court. The City courts would be transitioned to six pickleball courts and the Barton Johnson court would become a tennis only court. ($381,000) The estimates are very close whether one or two sites are improved. The additional cost for an expansion of the city courts is the requirement for a BMP (Stormwater Best Management Practice). This requirement is due to the addition of impermeable surface and proximity of wetlands in the area. If both sites are chosen to be improved than no BMP is required because there will be no additional or marginal addition of impermeable surface. Lighting estimates were a late request for addition to the estimates and should be received soon. An option we are exploring is the use of solar LED fixtures which will not require installation of wires and control panels. The costs may be close to a traditional wired system initially but will have a continuous return on energy savings until replacement is required. Our goal is to present these two options to the PRC for review and comments before moving forward with detailed design specification for construction through City Council approval. CITY HALL CONSTRUCT NEW TENNIS COURT RECLAIM AND RESURFACE EXISTING TENNIS COURT NEW ADA SIDEWALK (AUGMENT FENCE) 60' 120' 36' 78' 20' 44'CONSTRUCT FENCING DIVIDERS - 6' TALL STRIPE PICKLEBALL COURT (TYP) STRIPE TENNIS COURT (TYP) 6' COLOR COAT COURTS GREEN 16' 8'K:\Isiahbu\Scandia\2024 Tennis Court Project\FIGR-Tennis Court Project Location Plan.dwg 1/31/2024 1:08:47 PMR Community Center Tennis Court Project Scandia Figure 1 January 2024 R FEETSCALE 0 20 40 COMMUNITY CENTER PICKLEBALL & TENNIS COURT PROJECT CITY HALL RESURFACE EXISTING TENNIS COURT NEW ADA SIDEWALK (AUGMENT FENCE) CONSTRUCT FENCING DIVIDERS STRIPE PICKLEBALL COURT (TYP) 6' COLOR COAT COURTS GREEN 20' 44' 16' 8' 60' 120' 36' 78' NEW ADA SIDEWALK (AUGMENT FENCE) COLOR COAT COURT GREEN SALVAGE EXISTING NET POSTS INSTALL NEW NET GAMMELGARDEN OF SCANDIA 6'K:\Isiahbu\Scandia\2024 Tennis Court Project\FIGR-Tennis Court Project Figure 2.dwg 1/31/2024 1:10:05 PMR Community Center & Barton Johnson Tennis Court Project Scandia Figure 2 January 2024 R FEETSCALE 0 20 40 BARTON JOHNSON MEMORIAL PARK TENNIS COURT PROJECT COMMUNITY CENTER PICKLEBALL COURT PROJECT