12_15_21 Wastewater Minutes December 15, 2021 A meeting of the Wastewater Advisory Committee was held on the above date with modifications. The meeting was conducted in-person at the Scandia Community Center and over an electronic platform. All participants who joined the meeting remotely could hear each other and contribute to discussions. The meeting was called to order at 5:00 by Chairperson Steve Kronmiller. In attendance were committee members Dan Cartier, Peter Nora, Perry Rynders, and Steve Kronmiller as City Council liaison. Doran O’Brien and Craig Pittman were absent. City Staff in attendance were City Administrator Ken Cammilleri, City Engineer Ryan Goodman, and City Treasurer Colleen Firkus. APPROVAL OF THE AGENDA Rynders, seconded by Nora, moved to approve the modified agenda of switching numbers 4 & 5. The motion passed 4 – 0. APPROVAL OF 9/30/21 MINUTES Rynders, seconded by Cartier, moved to approve the agenda. The motion passed 4 – 0. 2022 UTILITY REPORT LETTER/CASH FLOW ANALYSIS/CAPITAL IMPROVEMENT PLAN/LINE ITEM BUDGET Administrator Cammilleri reported on the highlights of his Utility Report Letter pointing out the replacement of Lift Station 2 is not eligible for grant money as it doesn’t directly affect water quality. The system is performing all its function except for the higher levels of nitrates in the test well. Financing sources, in additions to increased User Fees, for the $1.4 million project to correct the nitrate problem and replace the #2 Lift Station are state bonding assistance and American Rescue Plan (ARPA) funds as well as Special Assessments and other bonds. The Utility belongs to the City and therefore the City’s responsibility to maintain the sewer system, especially due to the City’s lack of action saving for future capital expenditures. Inflow meters will also have to be replaced in 2022 per the MPCA as well as drilling a new test well and capping the old test well. While a new test well may eliminate the nitrate problem, that is an unknown factor and not likely. The Anderson/Erickson system (AE) was not designed for current use levels and exceeds daily permitted flow limits in wet summer months. The system is not triggering any compliance issues as of yet with the state or Washington County, but if it is expanded above 10,000 gallons per day, then it would fall under state licensure and may have to install pretreatment equipment. Both systems have original equipment except for the Lift Stations. Creating, funding and implementing schedule is strongly recommended, starting with a Facility’s Plan for both systems. It was again suggested meters with radios be installed for each property to get an accurate measure of usage between cabins and large homes. These readings can be compared to pump run times to identify Inflow & Infiltration (I&I) issues. Costs could be recouped through billing meter charges. Cartier, seconded by Nora, moved to recommend to the City Council that User Rates on the Big Marine Sewer System be increase by 10% in 2022. The motion passed 3 – 0 . Future capital investments are replacing force mains under the roads, to be scheduled with road replacements, and septic tank replacements. The City needs to develop uniform tank and connection criteria, and bring on staff or contract for the City’s sewer utilities and individual septic systems. The Uptown Sewer System’s capacity may be at full capacity but data collected over the past 3 years has too many anomalies to make a determination. It is recommended a moratorium on new connections be kept in place until the City can confirm available capacity. The existing site could be abandoned with a new drainfield build to the north. Expanding the drainfield to the west would eliminate the ability to construct a replacement drainfield. An engineered facility plan is also recommended to guide the use of limited resources and would be helpful in obtaining grants or low-cost financing. Cartier, seconded by Nora, moved to recommend to the City Council that User Rates for the Uptown Sewer System be raised 15% on base rate and 5% on volume rates. The motion passed 3 – 0. UTILITIES UPDATE – PUBLIC WORKS DIRECTOR Information from the staff report was incorporated in previous discussions and reiterated the need for uniform criteria to guide contractors on new installations as experienced this year with the difficulties of two new connections. FUTURE ITEMS Discussing larger connection fees, setting new construction capacity criteria through number of bedrooms and bathrooms, and follow-up to Council utilities discussion. Cartier, seconded by Nora, moved to adjourn. Motion carried 3 – 0. Meeting adjourned at 6:40 p.m. Respectfully submitted, Colleen Firkus, Treasurer